Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

RT4-P76

MATCHLINE SEE DWG. NO. CI-TP-01-04-010

RT4-C75
AL MARYAH ISLAND

ROA
6WA

DF
RT4-C43

RT4-C72
Y
001 002 003 004 005 006

RT4-C49

F-2
Bus
Stop

Bus
Stop

Bus
Stop

Stop
Bus

Stop
Bus

Bus
Stop
Stop
Bus

Stop
Bus

Stop
Bus
007 008 009 010 011 012
Stop
Bus

Stop
Bus

Stop
Bus

Bus
Stop

Bus
Stop

Stop
Bus
Bus
Stop

RT4-SS6

Stop
Bus
Stop
Bus
013 014 015 016 017 018

Stop
Bus

Stop
Bus
Stop
Bus

Stop
Bus
Stop
Bus

AL REEM ISLAND

19
18
17

16
20
15

14
21
13

12
22
11

10

23

8
7
24
6

25 4

3
2
1

3
9W
AY
D AA- KEY PLAN
ROA
NOTES
9WAY 1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE
STATED.
2. ALL COORDINATES ARE IN WGS 84 UTM ZONE IN 40N.
L.O.C ALL ELEVATIONS ARE REFERED TO NEW ABUDHABI
DATUM (NADD).
3. ALL DUCTS CROSSING UNDER THE CARRIAGE/
L.O.C DRIVEWAY SHALL BE CONCRETE ENCASED.

JN-06 LEGEND
EXISTING:

L.O.C TELECOM NETWORK


TELECOM NETWORK TO BE REMOVED
ROAD AA2 PROPOSED:
9 WAY D54 100 mm PVC

4W
MAIN DUCT

AY
L.O.C 6 WAY D54 100 mm PVC
MAIN DUCT
4 WAY D54 100 mm PVC
L.O.C9WAY MAIN DUCT

MATCHLINE SEE DWG. NO. CI-TP-01-04-017


MATCHLINE SEE DWG. NO. CI-TP-01-04-015

9WAY 2 WAY D54 100 mm PVC


MAIN DUCT

RT4-C87
2 WAY D54 100 mm PVC
Y LEAD - IN DUCT
9WA TELECOM NETWORK
UNDER LOCAL PACKAGE
TELECOM 9WAY DUCT
BY OTHERS
DUCT CONCRETE

9WAY
ENCASEMENT PROTECTION
MRT4
JOINT BOX / MANHOLE
JRC 14
JOINT BOX / MANHOLE
RT4-C47

JRC 12

RT4-P68
POP
TELECOM POP
INSIDE THE BUILDING

9WA
RT4-C50
GREEN FIELD GSM
(10m x 10m) PLOT

Y
BUILDING ROOF TOP GSM
MUSHTARAK
SCOPE UNDER REGIONAL ROADS

ROAD
PROJECT BOUNDARY

RT4-C89
CONSTRUCTION DOCUMENT

RT4-P27

FF-3
L.O.C
RT4-P47

REV. DATE DESCRIPTION APPR'D

RT4-P78
INTERFACE TO SEA BRIDGE Client
PACKAGE II(B) TELECOM NETWORK
N: 2,712,818.105
E: 236,641.320

Bridge A
Consultant
INTERFACE TO SEA BRIDGE
PACKAGE II(B) TELECOM NETWORK
N: 2,712,862.491
E: 236,638.860 Project / Contract
CONSTRUCTION OF ESSENTIAL INFRASTRUCTURE
WORKS FOR PACKAGE II (A) (REGIONAL

butment
INFRASTRUCTURE) AND PACKAGE II (B)
(SEA BRIDGE) REEM ISLAND, ABU DHABI
Drawing Title

TELECOM NETWORK LAYOUT


SHEET 16 OF 18

Location
CONTRACT No: JOB No:

DRAWN DESIGNED CHECKED APPROVED


ADDITIONAL NOTE:
TAT JC MWA IS
01. CONTRACTOR SHALL CONSIDER END CAP AT INTERFACE LOCATION BETWEEN
REGIONAL AND LOCAL INFRASTRUCTURE.
DATE APRIL 2021 ACTUAL SIZE A1
02. ALL PLOT CONNECTIONS INSIDE THE PLOT WILL BE UNDER LOCAL ROAD CONTRACT. Drawing Scale. 1:500 @ A1, 1:1000 @ A3
0 5 10 20 30 40 50m

Drawing No.
CI-TP-01-04-016 C0
S:\PROJECTS\000000 Reem Island Pkg-IIA\04 Users\CADD\PDF\IFC DRAWINGS REGIONAL_(09-DEC-2021)\CAD\PART-6 UTILITIES\27-TELECOME NETWORK LAYOUT\CI-TP-01-04-001 TO 018.dwg
Last Saved By: P0090252 Last Saved Date: 12/9/2021 2:19 PM Printed Date: 12/9/2021 4:24 PM Printed By: Varghese, Sinu

You might also like