Part 1: Job Description: Replacement for Guyed Tower Warning Lights at DEL Camp Location: DEL Camp Site
JRA Date: 10-07-2010 JRA No./ Revision: 10-109 JRA Leader: Michael Middleton Scribe: Abrar-ul-Hassan
Review Team: (e.g. Ops Review Team ) Masood Ahmed, Mohammad Ali, Tariq Saleem and Mohammad Aslam Shah
List Associated Procedures/work instructions or Temporary WIs:
Hazard Check List (FRCP identified below must reference applicable FRCP Control Measures – refer to FRCP Handbooks)
√ Falls from Heights Access / Egress Confined Space √ Manual Handling √ Fatigue/Over Exertion Slips, Trips & Falls
√ Competence of
√ Falling Objects √ Collisions Noise Illumination Environmental
Personnel
Liquid/Gas Under √Flaring/Hydrocarbon
Oil/Chemical Flammable Materials Moving Machinery Electricity
Pressure Release
Surface Mobile
Ignition Source Light Vehicles
Corrosive Substance Chemical Exposure Naked Flames Equipment
(Sparks/Electrical) (FRCP)
(FRCP)
Hazardous Materials Equipment Other
Isolation Working at Heights √ Lifting Operations (please specify)
Management Safeguarding
(FRCP) (FRCP) (FRCP)
(FRCP) (FRCP)
Step
Hazard Hazard Effect Hazard Controls Controls Acceptable
Job Steps Use Checklist as a Guide to Injury/Damage or
No. Use Hierarchy of Controls/FRCP Control Measures Y/N
be Specific Environmental Effect
01 Mobilization of Un inducted Personal Ensure inducted and medically fit and Yes
personals and people injury approved people from project HSE should
Equipment inter the working area
Emergency response requirements,
Workers Risk to
unaware of property Emergency access, Muster Points and
access & other relevant protocols as per standard
protocols of FRCP shall be reinforced during
toolbox meeting.
Discussed work scope with team
Conduct the daily Tool box Meeting
before the job start
CONTROLLED DOCUMENT
PF03.02 Page 1 of 4 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
CONTROLLED DOCUMENT
PF03.02 Page 2 of 4 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
Alternatives Considered: What are the other possible means of achieving the job outcome?
Part 3: Contingency Plans: What rescue equipment, PPE etc could be needed if something went wrong? Reference Field ERP
Full time communication with BHPB FEC HSEC Team to be made in case of any emergency / muster
Ambulance and Doctor shall be stand by during activity