ITEM DESCRIPTION Total price Unit Price Unit Quantities

0
1 POWER AND LIGHTING INSTALL 0
0
1.2 Supply, install, testing and commissioning of 0 Item
Main panel board including circuit 0
breakers, enclosures, grounding, fixings, 0
supports and for complete install as shown on 0
single line diagram 0
0
1.2.1 Ref. MDB 500A MCCB 0 No 1

To Collection 0
1.3 Supply, install, testing and commissioning of 0 Item
distribution panel boards including circuit 0
breakers, enclosures, grounding, fixings, 0
supports and for complete install as shown on 0
single line diagram 0
0
1.3.1 Ref. PPT 0 No 30

1.3.2 Ref. DB-SR 0 No 1

To Collection 0

0
0 POWER INSTALLATION 0
1.4 Supply, install, testing and commissioning 0 Item
of 600/1000V CU/PVC/PVC cables routed in PVC 0
conduits including all accessories to complete 0
installation for feeders and various power loads 0
as shown on drawings 0

L.V cable routing 0

1.4.2 4Cx120mm² XLPELL/SWA/PVC M.C.C 0 M 30


0
1.4.3 (4X16+10) mm² CU/PVC/PVC M.C.C 0 M 30
0
1.4.4 (4X10+10) mm² CU/PVC/PVC M.C.C 0 M 40
0
1.4.5 (4X6+6)mm2 CU/PVC/PVC M.C.C 0 M 60
0
1.4.6 (3X1X150+70)+70 mm² CU/PVC/PVC S.C.C 0 M 30

1.4.7 (4x1x10+10) mm² CU/PVC/PVC S.C.C 0 M 20


0

Project No.: J15-01200 ZUHAIR FAYEZ PARTNERSHIP 2 of 4 Date: SEP 2015


PROJECT: Matrouh Building
BOQ FILE

ITEM DESCRIPTION Total price Unit Price Unit Quantities

To Collection 0
0 POWER AND LIGHTING INSTALLATION
0

1.5 Supply, install, testing and commissioning of 0 Item


power accessories including boxes, conduits, 0
wires, cable and all other accessories to 0
complete install as shown on power drawings. 0
0
1.5.1 Single Normal Socket, 16 AMP, 220V , 50HZ 0 No 475
0

1.5.2 Duplex Normal Socket, 16 AMP, 220V , 50HZ No 30

1.5.3 Power Socket 20 AMP , 220V , 50HZ 0 NO 31


0

1.5.4 Single Phase Disconnected Switch 32A , 220V, 50HZ NO 91

0
1.5.5 Three Phase Disconnected Switch 32A , 380V, 50 HZ NO 2
For Two Shops
0
To Collection 0
0
1.6 Supply, install, test and commissioning of the 0 Item
lighting accessories including switches, push 0
buttons, boxes, conduits and wires / cables for 0
different fixtures as shown on lighting drawings. 0
0
1.6.1 Single pole one-way, one-gang switch (10A) 0 No 142
controlling lighting fixtures 0
0
1.6.2 Single pole one-way, two-gang switch (10A) 0 No 105
controlling lighting fixtures. 0

1.6.3 Single pole two-way, one-gang switch (10A) 0 No 104


controlling lighting fixtures. 0
0
0
To Collection 0

Project No.: J15-01200 ZUHAIR FAYEZ PARTNERSHIP 3 of 4 Date: SEP 2015


PROJECT: Matrouh Building
BOQ FILE

ITEM DESCRIPTION Total price Unit Price Unit Quantities

POWER AND LIGHTING install 0


0
1.7 Supply, install, testing and commissioning of 0 Item
lighting fixtures complete with lamps or tubes, 0
connection boxes, heat resisting flexible cables, 0
fixings , suspensions, grounding including all 0
necessary boxes, plates, cables/ wires and 0
conduits as shown on drawings 0
0
1.7.1 LED LUMINAIRE L1 0 No 99
0
0
1.7.2 LED LUMINAIRE L2 0 No 117
0

1.7.3 LED LUMINAIRE L3 No 37

1.7.4 LED LUMINAIRE L4 0 No 14


0
0
1.7.5 LED LUMINAIRE L5 0 No 61
0
0
1.7.6 LED LUMINAIRE L6 0 No 166
0

1.7.7 EXHAUST FAN 0 No 86

0
1.7.8 BELL No 31

1.7.9 BELL SWITCH ‫مفتاح الجرس‬ No 31

1.7.10 STAIR SWITCH ‫مفتاح السلم‬ No 7

Project No.: J15-01200 ZUHAIR FAYEZ PARTNERSHIP 4 of 4 Date: SEP 2015