Professional Documents
Culture Documents
F-A0-0005 - Pump Room
F-A0-0005 - Pump Room
FIRE PUMP
12 13
150Ø SUCTION MANIFOLD HEADER 14 Ø150 BUTTERFLY VALVE
25ø
14
ROOM
25ø
19
13
TANK ACCESS WITH LADDER 15 Ø50 NON-RETURN VALVE
25ø
17
18 25ø 8 7 40ø
14 11 16 Ø150 NON-RETURN VALVE
25ø
3 DIESEL ENGINE EXHAUST LINE WITH HIGH
25ø
2
17 Ø150 FLOW METER
25ø
1
15
21
TEMPERATURE INSULATION SHALL BE
EXTENDED AND TERMINATED
20 20
5 18 Ø100 ANGLE TYPE RELIEF VALVE
A 4
A AT OUTSIDE THE BUILDING.
6
19 Ø100 x Ø150 WASTE CONE
PFE
50ø
ELEC STAIRCASE-1
13
20 Ø125 x Ø150 CONCENTRIC DISCHARGE INCREASER
10
150Ø DISCHARGE MANIFOLD HEADER
21 MUFFLER
RM-1
GENSET 22 PRESSURE GAUGE WITH ½"Ø GLOBE VALVE
PUMP SCHEDULE
LOCKABLE FUEL CAP LOCKABLE FUEL CAP
UNIT MOTOR CAPACITY TOTAL
EMERGENCY VENT EMERGENCY VENT EQUIPMENT QTY EACH LOCATION
HEAD PSIG
SCREEN VENT TANK SCREEN VENT TANK AMPS. VOLTS PHASE HERTZ G.P.M
H.P. (FULL LOAD)
VARIES
DIESEL TANK
BUND WALL FP-3 JOCKEY PUMP 1 7.5 415 3 50 25 135 GROUND FLOOR
2-HR FIRE RATED BUND WALL
2-HR FIRE RATED
FUEL TANK SCHEDULE PER DIESEL ENGINE
AEB HEADQUARTERS:
VARIES LOCATION TANK CAPACITY EFFECTIVE CAPACITY MINIMUM TANK SIZE EFFECTIVE P.O. Box 1148 Doha, Qatar Tel +974 406 88 88 Fax +974 447 78 68
Email aeb@aeb-qatar.com Web www.aeb-qatar.com
DURATION OTHER BRANCHES:
MANILA * KUALA LUMPUR * MUSCAT
FUEL HOSES FOR SUPPLY & RETURN VARIES GROUND FLOOR 1 GAL / HP 110 GALS 125 GALS 8 HRS.
PROPOSED COMMERCIAL & RESIDENTIAL
FUEL HOSES FOR SUPPLY & RETURN DEVELOPEMENT
FIRE WATER TANK SCHEDULE B+G+2+P
TYPE OF CAPACITY EFFECTIVE SHKA. HISSA ABDULLA A M AL MAZROO
LOCATION CONSTRUCTION COMPARTMENT NO. OF COMPARTMENT EFFECTIVE DURATION CAPACITY
T1=85.16m³
AL GHARAFA, DOHA-QATAR
GROUND FLOOR CONCRETE TANK 2 Nos. 60 MINUTES 170.325m³
858-10 F-A0-0005 A