Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Procurement of Works- Single Stage Two Envelope Procedure | 74

Specific Experience in Managing ES aspects


[The following table shall be filled in for contracts performed by the Bidder, and each member
of a Joint Venture]

Bidder's Name: ________________


Date: ___________________
Bidder's JV Member Name: __________________
Contract Id. and title: _____________________

Page __________________of ________________pages

1. Key Requirement no 1 in accordance with 4.2 (c): ______________________


Contract Identification
Award date
Completion date
Role in Contract Prime Member in Management
Subcontractor
Contractor JV Contractor

  
Total Contract Amount

Details of relevant experience

2. Key Requirement no 2 in accordance with 4.2 (c): ______________________


3. Key Requirement no 3 in accordance with 4.2 (c): ______________________

You might also like