Motorpact Obsolescencia

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CN Information

Change Notice Information Announcement


Customer Care Center: 1(888)778-2733 or email: ccc@schneider-electric.com

RED Flag Notice


Time to End of Commercialization: Effective Immediately
Note: The red flag notification signals an obsolescence, withdrawal or discontinuation of an offer.

Product Motorpact Customer 1(877)-342-


Name(s): Support No. 5173
Product Line Medium Voltage Controllers Document 9/12/2023
Description: Issued:

Description of Change:
Schneider Electric will be globally withdrawing the MV MotorPact offer. This change will encompass a withdrawal of
the MotorPacT offer for US, Mexico and Canada.
UL offer will be replaced by the new MotorSet offer that will be gradually launched starting in October 2023.
Quotes for Motorpact equipment stopped being accepted at the end of 2022. Because of this, and
due to limited order engineering capacity, last buy for MotorPact equipment for US, Canada and Mexico is October
31, 2023. Any extraordinary need for this type of equipment would be evaluated by GSC prior to acceptance. Any
outstanding bids shall not be valid beyond October 31, 2023. Existing orders as of the date of this announcement
will be fulfilled based on parts lead time and order received date. Replacement parts will be available for purchase
from Smyrna plant or Schneider Services during this period, contingent on parts availability from suppliers.
After this, Schneider Electric USA Services will continue to provide technical support for the existing installed base
through 2034. Auxiliary kits and Ready-to-customize cubicles last order date will be end of March 2024 and will be
available for shipment until end of December 2024.

Inventory Disposition and Return Policy:


Standard warranty applies. All sales are final.

Product Photos
Motorpact MotorSet

Current Product New Product

Office Location Code POW00010 ( C102-2B) Doc# 0100HO1003R10/13


Page 1 of 2
Public
CN Information
Change Notice Information Announcement
Customer Care Center: 1(888)778-2733 or email: ccc@schneider-electric.com

Critical Dates
Last Buy: Product Availability End of
Support Ends: Date of New Commercialization
Product:
10/31/2023 6/1/2025 10/2/2023 10/31/2023

Definition of Dates:
a. Last buy shall be the last date that we will accept a PO. This date shall take into account the lead time to build the
product as well as current inventory levels.
b. Product support shall be 1 yr beyond end of commercialization or last buy whichever the latter.
c. Availability date of new product is when the new products are expected to be orderable.
d. End of commercialization (EOC) if made to stock; this date will be before the last buy date (taking into account
the build / shipping lead time as well as current inventory levels). If made to order; this date will equal the last buy
date.
Note: Our factories have limited capacities for products going obsolete. Product availability will be set on a first
come first serve basis.

Office Location Code POW00010 ( C102-2B) Doc# 0100HO1003R10/13


Page 2 of 2
Public