ARSPECS02: SPECIALIZATION 2 – PROJECT MANAGEMENT

Lyceum of the Philippines University – Cavite, 2nd Semester, 1


School Year: 2023 - 2024

Lyceum of the Philippines University – Cavite Campus


College of Engineering, Computer Studies and Architecture
Department of Architecture

A TOPIC ANALYSIS ABOUT


PROJECT MANAGEMENTSOCIAL
RESPOSIBILITIES

RAFLORES, SHAN ARCHER


DEPARTMENT OF ARCHITECTURE
ARCH. REBUSA LEAN JOY
MaY 02, 2024

Author Note
This paper is prepared for Architecture 401, Arspecs02 requirements taught by
Arch. Lean Joy Rebusa
ARSPECS02: SPECIALIZATION 2 – PROJECT MANAGEMENT
Lyceum of the Philippines University – Cavite, 2nd Semester, 2
School Year: 2023 - 2024

I. EXECUTIVE SUMMARY

Project Management Social Responsibility (PMSR) is an ethical framework that integrates


social and environmental considerations into project management practices. It goes beyond
traditional objectives by emphasizing stakeholder engagement, sustainable practices, ethical
sourcing, and community benefits. PMSR aims to create positive social and environmental
outcomes throughout the project lifecycle, contributing to the well-being of society and the
environment.

II. TOPIC RELEVANCE

PMSR is highly relevant due to several factors:

Stakeholder Expectations: Stakeholders increasingly expect organizations to address social and


environmental impacts. PMSR aligns with these expectations by promoting responsible project
management.

Sustainable Development Goals (SDGs): PMSR contributes to achieving SDGs, such as


environmental protection, poverty reduction, and community well-being.

Legal and Regulatory Requirements: Compliance with laws and regulations related to social
and environmental responsibility is essential. PMSR ensures adherence to these requirements.

Reputation and Brand: Companies with strong social responsibility practices enhance their
reputation, attract clients, and retain productive workers.

III. REALIZATION OF THE TOPIC


projects that meet or exceed industry
Environmental Sustainability: Minimizing
standards.
environmental impact through sustainable
practices, resource conservation, and Ensuring durability, functionality, and
pollution prevention. longevity of built structures.

Adhering to environmental regulations Safety and Health Standards:


during construction activities. Implementing robust safety protocols to
protect workers, subcontractors, and the
Quality Assurance: Delivering construction
public.
ARSPECS02: SPECIALIZATION 2 – PROJECT MANAGEMENT
Lyceum of the Philippines University – Cavite, 2nd Semester, 3
School Year: 2023 - 2024

Providing adequate training and maintaining Considering materials sourcing, construction


safe working conditions. methods, and waste management.

Community Engagement: Engaging with Local Economic Development:


local communities affected by construction Maximizing local economic benefits by
projects. hiring local workers and supporting small
businesses.
Incorporating community input into
decision-making processes to mitigate Investing in community development
negative impacts. initiatives.

Fair Labor Practices: Providing equitable Compliance and Legal Responsibilities:


wages and safe working conditions for Following laws, regulations, and industry
workers and subcontractors. standards for social and environmental
performance.
Complying with labor laws and regulations.
Staying updated on sustainability trends and
Stakeholder Management: Identifying and
best practices.
analyzing stakeholders throughout the
project lifecycle. Responsible Land Use and Planning:
Minimizing loss of natural habitats,
Managing expectations and addressing
agricultural land, and green spaces due to
concerns effectively.
construction.
Ethical Procurement Practices: Promoting
Conducting land use assessments and
transparency, fairness, and integrity in
adhering to zoning regulations.
procurement processes.
In summary, PMSR integrates ethical
Selecting suppliers and negotiating contracts
considerations into project management,
ethically.
fostering positive social and environmental
Resource Efficiency: Optimizing resource outcomes. By implementing PMSR
use and minimizing waste during principles, organizations contribute to a
construction. better world while achieving project goals