Proposed Chapel (Nia Central Office) : National Irrigation Administration

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

30 BAR DIA. 30 BAR DIA.

30 BAR DIA. 30 BAR DIA.

A. GENERAL

VERIFY
D=FOR BEAM
B. CONCRETE & REINFORCEMENT

LOCATION 28 DAYS STRENGTH

3000 PSI (210KG/SQ. CM)


MAX. SIZE AGGREGATE MAX. SLUMP
30 BAR DIA.

30 BAR DIA.

30 BAR DIA. 30 BAR DIA.

40

4000 PSI (410KG/SQ. CM) 1 IN. (25MM.) 4 IN. (100MM.)

4000 PSI (689.5KG/SQ. CM) 3/4 IN. (19MM.) 4 IN. (100MM.)

D/3

D/3

D
4000 PSI (410KG/SQ. CM) 3/4 IN. (19MM.) 4 IN. (100MM.)

D/3
3/4 IN. (19MM.) 4 IN. (100MM.)

WALLS LESS THAN 200mm THK.


AT INTERSECTION
AT INTERSECTION

WALLS LESS THAN 200mm THK.

300

300

NOTES:

AT CORNER
C. STRUCTURAL STEEL

E.Q.
AT CORNER

E.Q.

S/2
NOTE:

W
W

NOTE:

HOOP TIES
HOOP TIES
NOTES:

WF-1 WF-2 WF-3

AT EDGE / PERIMETER CHB WALL AT INTERIOR CHB WALLS AT INTERIOR WALLS WITH SLAB ELEVATION DIFFERENCE

TABLE OF LAP SPLICE & ANCHORAGE LENGTH NOTES :

CONCURRED BY:

ATTY. AILYNE C. AGTUCA-SELDA


MANAGER, ADMINISTRATIVE DEPARTMENT

SUBMITTED AND REVIEWED BY: RECOMMENDED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENT: SHEET NUMBER:
I ON A
DRAWN: DSM
GA T DM
RI CONSTRUCTION NOTES AND STANDARD
R

IN

DETAILS
T I ON A L I

Republic of the Philippines


I S TR

DESIGNED: PKPV
National Irrigation Administration PROPOSED CHAPEL
LYDIA S. ESGUERRA C'ZAR M. SULAIK FREDDIE M. TOQUERO ROMEO M. LOPEZ GEN RICARDO R VISAYA (Ret) S-1
AT I O

(NIA CENTRAL OFFICE)


NA

Quezon City CHECKED: EMD


MANAGER, ENGINEERING DEPARTMENT DEPUTY ADMINISTRATOR FOR OIC, DEPUTY ADMINISTRATOR FOR OIC, SENIOR DEPUTY ADMINISTRATOR ADMINISTRATOR
1963
ENGINEERING & OPERATIONS ADMINISTRATIVE AND FINANCE SECTOR DRAWING NUMBER:
EMD- LOCATION: NIA CENTRAL OFFICE, EDSA DILIMAN, Q.C.
DATE: OCT. 2021 NIA COMPLEX-EDDSD-2021-010 10 OF 26

You might also like