Professional Documents
Culture Documents
Proposed Chapel (Nia Central Office) : National Irrigation Administration
Proposed Chapel (Nia Central Office) : National Irrigation Administration
Proposed Chapel (Nia Central Office) : National Irrigation Administration
A. GENERAL
VERIFY
D=FOR BEAM
B. CONCRETE & REINFORCEMENT
30 BAR DIA.
40
D/3
D/3
D
4000 PSI (410KG/SQ. CM) 3/4 IN. (19MM.) 4 IN. (100MM.)
D/3
3/4 IN. (19MM.) 4 IN. (100MM.)
300
300
NOTES:
AT CORNER
C. STRUCTURAL STEEL
E.Q.
AT CORNER
E.Q.
S/2
NOTE:
W
W
NOTE:
HOOP TIES
HOOP TIES
NOTES:
AT EDGE / PERIMETER CHB WALL AT INTERIOR CHB WALLS AT INTERIOR WALLS WITH SLAB ELEVATION DIFFERENCE
CONCURRED BY:
SUBMITTED AND REVIEWED BY: RECOMMENDED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENT: SHEET NUMBER:
I ON A
DRAWN: DSM
GA T DM
RI CONSTRUCTION NOTES AND STANDARD
R
IN
DETAILS
T I ON A L I
DESIGNED: PKPV
National Irrigation Administration PROPOSED CHAPEL
LYDIA S. ESGUERRA C'ZAR M. SULAIK FREDDIE M. TOQUERO ROMEO M. LOPEZ GEN RICARDO R VISAYA (Ret) S-1
AT I O