Professional Documents
Culture Documents
First 3 Pages
First 3 Pages
PROJECT REPORT
ON
ATA-38
Water & Waste System
Submitted by
MD. SAIFUDDIN
RAKIB
(ID: 15107115)
Submitted in partial fulfillment
of the requirements for the
award of the degree
Of
Bachelor of Science
In
Mechanical Engineering
DEPARTMENT OF
MECHANICAL
ENGINEERING
COLLEGE OF
ENGINEERING AND
TECHNOLOGY
INTERNATIONAL
UNIVERSITY OF
BUSINESS
AGRICULTURE
AND TECHNOLOGY
Uttara, Dhaka-1230
Dec 2018
Submitted by
Miss Shweta Kalyanshetti
Enrollment Number:12021064955
CERTIFICATE
Certified that the project report “Water & Waste System” submitted by
Miss. Shweta Kalyanshetti; Enrollment Number:12021064955. For the partial
fulfilment of the requirement for the Bachelors Degree Of Science In Aviation
has been duely completed.
My deepest thanks to my Project Guide Mr. Subodh Kumar from BSC department for guiding and
correcting various documents of mine with attention and care.
I also do not like to miss the opportunity to acknowledge the contribution of all faculty members of
the department for their kind assistance and cooperation during the development of my project.
Last but not the least, I acknowledge my friends for their contribution in the completion of the
project.