BOM Volumenes de Obra
BOM Volumenes de Obra
PROJECT : _________________________________
Adress : _________________________________
_________________________________
_________________________________
_________________________________
_________________________________
_________________________________
Notations
Slab e Thickness
Si Surface openings
S Section
Column H Height
Ø Diameter
S Section
P Perimeter
Wall H Height
l Thickness
Si Surface openings
H Height
l Width
H Height
Calculation conventions
Details of elements
Piles plan 2 (- 1 0 0 1
2.50m)
Basement 0 0 22 22
(+0.00m)
Level 1 (+3.60m) 9 16 22 47
Level 2 (+6.84m) 9 17 22 48
Level 3 (+9.44m) 9 15 22 46
Level 4 (+12.04m) 9 15 22 46
Level 5 (+14.64m) 9 15 22 46
Level 6 (+17.24m) 9 15 22 46
Level 7 (+19.84m) 9 15 22 46
This table contains the details of selected structural elements. The selection is partial.
CONCRETE
Detailed list
Basement (+0.00m)
Level 1 (+3.60m)
(m3) (m2)
Level 2 (+6.84m)
Level 3 (+9.44m)
(m3) (m2)
Level 4 (+12.04m)
Level 5 (+14.64m)
Level 6 (+17.24m)
Level 7 (+19.84m)
Sums
(m3) (m2)
Ratios
Element Formwork/CONCRETE
(m2/m3)
Slab 3.89
Beam 9.59
Column 9.54
Total 5.9
Price
CONCRETE
Formwork