Tools/Tester: CSD, PSD, Pliers, screw driver, Set spanner, Plug extractor, Torque wrench, Multi
meter, Megger
Consumable Goods: Rag Piece, Colin, Brushes, locking wire, Plastic bags, anti corrosion
solution.
Safety Measured:
1) No smoking inside or around hanger
Snag:
During the routine check up of inverter found it is not getting switch ON. After going for trouble
shooting found our primary inverter is suspected Un- serviceable. Hence to confirm from senior
the decision made to remove the inverter and check for serviceability.
Task Procedure:
Aim: Primillarly aircraft is provided DC Power supply by two independent DC starter generator and
operated parallel. Aircraft AC power requirement are provided by two static inverters installed in tail cone.
Each inverter is rated at 115 V 400 Hz and 1000 VA. During normal operation, the inverter operates in
parallel. Two switches are also installed in cockpit to operate these invertors.
Location:
Static inverters installed in tail cone between frame no. 30 and 29 of aircraft.. .
Activity:
Removal/ Installation
Removal of inverter:
1) Lower tail cone access door.
2) Disconnect both aircraft batteries.
3) Disconnect electrical plugs from inverters.
4) Remove attaching parts and inverter form aircraft.
Note: While checking all electrical connections and condition of connector, found one connector was
having short circuit. Replace it with new one and check the continuity. Found satisfactory working. ,.
Installation of inverter:
Post-Task Inspection
1) Check the full functional check and get satisfaction.
2) Wind up the service area and look for any FOD.
3) Complete the all documentations/entries.
GM Choudhary