RDTL-BT-DW Tank Farm of Betano Port
RDTL-BT-DW Tank Farm of Betano Port
CONFIRMED BY
..............................................................
CONVEYOR
EKSISTING
03
Buoy Eksisting
±360 m
Floating Hose
02
Buoy Eksisting
14,000 DWT
Ship Tanker
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-01
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
PIPELINE
EKSISTING
±310 m
Floating Hose
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-02
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
PIPELINE
EKSISTING
±310 m
Floating Hose
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-02
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
A A A A
LAY OUT PIPE SUPPORT TYPE 1
MD.01 SCALE 1 : 40
20.00
PIPE SUPPORT TYPE 1 ELV + 3.80
550 M
00
8. PIPE PILE Ø 027
t= 8 mm
PIPE PILE Ø 027
00 t= 8 mm
8.
PLATE t= 8 mm PLATE t= 8 mm
MD.01
LONG SECTION PIPE SUPPORT TYPE 1 A 1 MD.01
LONG SECTION PIPE SUPPORT TYPE 1 B
SCALE 1 : 40
1 2 6.00
7.00
100.00
WF 150mm, 70mm, 10mm
20.00
PLATE t= 8 mm 2 600.000
DETAIL 1
MD.01
SCALE 1 : 10
8.00
1.50
SOLAR PIPE PREMIUM PIPE PREMIUM PIPE
CABEL PIPE WATER PIPE Steel L
PLATE t= 10 mm 36mm, 36mm, 7mm
10.00
Steel P 0.80 LONG SECTION PIPE SUPPORT TYPE 1 C
DETAIL 2 MD.01
SCALE 1 : 40
MD.01
DETAIL PIPE 1 DETAIL PIPE 2 200mm, 200mm, 8mm MD.01
SCALE 1 : 10
SCALE 1 : 10 MD.01
SCALE 1 : 10
AS SHOWN
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-03
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
1000
750
INLET D6"
9805
SHELL 3 T 5mm A36M
9055
SHELL 2 T 5mm A36M
5 1
1300
PILE CAP T 1300mm
CONCRETE K300
6 8
11000
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-04
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
T
2
60°
6000 6000 6000 6000 6000 1/3 T
1800
1800
1800
1800
1800
T
1.5
6000 6000 6000 6000 6000
4260 1740 1740 4260 4260 1740 1740 4260 4260 1740
45°
1800
1800
1800
1800
1800
3
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-04
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
1800
1409
1800
3600
1800
4409
6000
654 1146
1800
654
600
65 NOM.
50 MIN 40 NOM. 9THK
30 MIN.
1820Ø 40 NOM.
30 MIN. 9HK
1670Ø
9THK
ANN. PLT. 9THK
SKT. PLT.
9THK
600
9THK
9
9THK.
65 65 NOM. SKETCH PLATE
50 MIN 9THK.
60° 9THK. ANNULAR PLATE
9THK. BACKING PLATE
870 O/D 9THK 50
2
50
==
910Ø
5THK. FLAT
DRIP RING
3
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-04
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
°
40
40°
40°
40°
0°
4
40
°
40°
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-04
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
1000
ROOF FRAME L 75.57.6
INLET D6"
7 3
12054
8 2
SHELL 3 T 5mm A36M
9 1
1300
PILE CAP T 1300mm
CONCRETE K300
11 15
SQUARE PILE 400mm
6000
12 14
13
14000
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-05
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
T
2
60°
1/3 T
T
1.5
45°
3
1800
1800
1800
1800
1800
1200
6000 6000 6000
1680 4320 6000 1680 4320 6000 1680 4320 6000
6000
1680 4320
1800
1800
1800
1800
1800
1800
1200
6000 6000 6000
3360 2640 3360 2640 3360 2640
1800
1800
1800
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-05
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
1800
2932
1800
R6000
5932
1800
R6000
5358
2358
1800
R6000
969
3969
1500
R6000
65 NOM.
50 MIN 40 NOM. 9THK
30 MIN.
1820Ø 40 NOM.
30 MIN. 9HK
1670Ø
9THK
ANN. PLT. 9THK
SKT. PLT.
9THK
600
9THK
9
9THK.
65 65 NOM. SKETCH PLATE
50 MIN 9THK.
60° 9THK. ANNULAR PLATE
9THK. BACKING PLATE
870 O/D 9THK 50
2
50
==
910Ø
5THK. FLAT
DRIP RING
3
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-05
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
45°
45°
45°
45°
45°
45°
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-05
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
150
200
URINOIR
-0.05
MANAGER TECHNICAL TEMPORARY
112.5
400
DEPOT STAFF REST ROOM WC
-0.05
200
WC
112.5
-0.02 -0.05
C
135
1000
200
200
200
CORRIDOR CORRIDOR -0.03
±0.00 ±0.00
-0.48
B
HALL
175
±0.00 PANTRY
ADMINISTRATION AND
400
400
CASHIER ROOM
225
STRORE
ROOM
30 30
ENTRANCE
-0.03
350
350
460
110
625
ROAD -0.48
B
OFFICE PLAN
SCALE 1 : 80
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-06
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
90 50
+3.50
+2.60
60
+2.00
400
120
+0.80
80
±0.00
-0.48
RIGHT VIEW
SCALE 1 : 80
+4.00
90 50
+3.50
+2.60
60
+2.00
400
120
+0.80
80
±0.00
-0.48
FRONT VIEW
SCALE 1 : 80
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-06
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
FRONT VIEW
TANK FARM DESIGN OF BETANO PORT and 1 : 80 DATE
TEAM LEADER DRAWING BY
RIGHT VIEW of OFFICE
DR ABILIO ARAUJO 2024
OKKE PERMADHI GRENANDA JUNIOR DARMAWAN PRESIDENT DIRECTOR
LOCATION :BETANO, SAME - REPUBLICA DEMOCRATICA DE TIMOR LESTE Date,02/April./2024 Date,02/April/2024 Date,....../........................../2024 Date,....../........................../2024 Date,....../........................../2024
+4.00
90 50
+3.50
+2.60
60
+2.00
400
120
+0.80
80
±0.00
-0.48
LEFT VIEW
SCALE 1 : 80
+4.00
90 50
+3.50
+2.60
60
+2.00
400
120
+0.80
80
±0.00
-0.48
BACK VIEW
SCALE 1 : 80
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-06
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
BACK VIEW
TANK FARM DESIGN OF BETANO PORT and 1 : 80 DATE
TEAM LEADER DRAWING BY
LEFT VIEW of OFFICE
DR ABILIO ARAUJO 2024
OKKE PERMADHI GRENANDA JUNIOR DARMAWAN PRESIDENT DIRECTOR
LOCATION :BETANO, SAME - REPUBLICA DEMOCRATICA DE TIMOR LESTE Date,02/April./2024 Date,02/April/2024 Date,....../........................../2024 Date,....../........................../2024 Date,....../........................../2024
± 7.40
9
18
9
18
11 ± 5.66
0.3
9
18 11
0
30° 30° .3 1
3.6 1 7.3
+4.00 12
30°
90 50
+3.50
120 +3.50 120
+2.60
60
+2.00
400
120
+0.80
80
WAITING ROOM.
±0.00 URINOIR WC WC ENTRANCE
-0.05 ±0.00 -0.03
-0.05 -0.05
-0.48 -0.48
9
18
9
18
3.6
30°
30°
+4.00 12
90 50
+3.50
120 +3.50 120
+2.60
60
+2.00
400
120
+0.80
80
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-06
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
CROSS SECTON A-A
TANK FARM DESIGN OF BETANO PORT and DATE
TEAM LEADER DRAWING BY
B-B of OFFICE
DR ABILIO ARAUJO 2024
OKKE PERMADHI GRENANDA JUNIOR DARMAWAN PRESIDENT DIRECTOR
LOCATION :BETANO, SAME - REPUBLICA DEMOCRATICA DE TIMOR LESTE Date,02/April./2024 Date,02/April/2024 Date,....../........................../2024 Date,....../........................../2024 Date,....../........................../2024
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-07
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
WORSHOP
TANK FARM DESIGN OF BETANO PORT & 1 : 100 DATE
TEAM LEADER DRAWING BY
LABORATORIUM
DR ABILIO ARAUJO 2024
OKKE PERMADHI GRENANDA JUNIOR DARMAWAN PRESIDENT DIRECTOR
LOCATION :BETANO, SAME - REPUBLICA DEMOCRATICA DE TIMOR LESTE Date,02/April./2024 Date,02/April/2024 Date,....../........................../2024 Date,....../........................../2024 Date,....../........................../2024
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-07
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
WORKSHOP
TANK FARM DESIGN OF BETANO PORT & 1 : 100 DATE
TEAM LEADER DRAWING BY
LABORATORIUM
DR ABILIO ARAUJO 2024
OKKE PERMADHI GRENANDA JUNIOR DARMAWAN PRESIDENT DIRECTOR
LOCATION :BETANO, SAME - REPUBLICA DEMOCRATICA DE TIMOR LESTE Date,02/April./2024 Date,02/April/2024 Date,....../........................../2024 Date,....../........................../2024 Date,....../........................../2024
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-07
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
WORKSHOP
TANK FARM DESIGN OF BETANO PORT & 1 : 100 DATE
TEAM LEADER DRAWING BY
LABORATORIUM
DR ABILIO ARAUJO 2024
OKKE PERMADHI GRENANDA JUNIOR DARMAWAN PRESIDENT DIRECTOR
LOCATION :BETANO, SAME - REPUBLICA DEMOCRATICA DE TIMOR LESTE Date,02/April./2024 Date,02/April/2024 Date,....../........................../2024 Date,....../........................../2024 Date,....../........................../2024
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-08
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
1 1 1 1
C C
B B
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-10
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
D10-200
D10-200
SAND COMPACTED
COMPACTED SOIL
D10-200 D10-200
D10-200
D10-200
4D12
D13-200 D10-200
+0.05
±0.00
WORKSHOP FLOOR
150X250
150X250
150X250
150X250
SAND COMPACTED
D13-200
SURFACE COMPACTED SOIL
FIBER
150X250 150X250
D10-200
150X250 150X250
D10-200 6D12
COLUMN 130x200
COLUMN 130x200
D10-200
2D12
3D12
A ANCHOR
D22-500
2D12
MASONRY 2D12
STR D10-200
LAYER SAND
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-10
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
C C
B B
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-11
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
D10-200
150X250
150X250
D13-200
150X250 150X250
D10-200 D10-200
D10-200
D10-200
D10-200
150X250 150X250
D10-200 6D12
COLUMN 130x200
COLUMN 130x200
D10-200
2D12
3D12
A ANCHOR
D22-500
2D12
MASONRY 2D12
STR D10-200
LAYER SAND
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-11
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
IWF.200.100.5,5.8
IWF.200.100.5,5.8
PLATE GUSSET # 8 mm PLATE BUHUL # 8 mm
CONCRETE CAST 1:3:5 THICK 4cm UK. 90 mm X 175 mm UK. 90 mm X 175 mm
52
30
SAND IS
10 4
30
20
IWF. 175.90.5.8 IWF. 175.90.5.8 IWF. 175.90.5.8 IWF. 175.90.5.8
65
35
30
IWF.200.100.5,5.8
IWF.200.100.5,5.8
I
100
IRON Ø 10mm - 15 mm
SCALE 1:10 SCALE 1:10
PLATE #1mm
45
DETAIL E
100
135
100
FLOOR PLATE BORDES #4mm
+3.00
65
DETAIL A DETAIL B
IWF.175.90.5.8
135
SCALE 1:100 SCALE 1:100
GALVANIZED PIPE Ø 4"
500
500
125
100
SAND
CRAMIK FLOOR
EMBANKMENT 100
A SAND STONE ± 0.00
A
500
300
500
100
90
70 90 70
250 300
300 300
100
FLOOR WORK CAST 1:3:5 THICK 5cm
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-12
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
LAYOUT
TANK FARM DESIGN OF BETANO PORT
and DATE
1 : 100
CROSS SECTION TEAM LEADER DRAWING BY
GUARD HOUSE
DR ABILIO ARAUJO 2024
OKKE PERMADHI GRENANDA JUNIOR DARMAWAN PRESIDENT DIRECTOR
LOCATION :BETANO, SAME - REPUBLICA DEMOCRATICA DE TIMOR LESTE Date,02/April./2024 Date,02/April/2024 Date,....../........................../2024 Date,....../........................../2024 Date,....../........................../2024
PIPE Ø 1"
UNP. 100.50.6
100
110 65.65.6
120
500
IWF. 175.90.5.8
UNP. 100.50.6
PIPE Ø2"
CABLE PULLEYS
500
100
PULLEY
SCALE 1:5
10
UNP. 100.50.6
PLATE # 10mm
85 17.5
120
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-12
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
DETAIL FLOOR PLAN
TANK FARM DESIGN OF BETANO PORT and 1 : 100 DATE
TEAM LEADER DRAWING BY
PULLEY
DR ABILIO ARAUJO 2024
OKKE PERMADHI GRENANDA JUNIOR DARMAWAN PRESIDENT DIRECTOR
LOCATION :BETANO, SAME - REPUBLICA DEMOCRATICA DE TIMOR LESTE Date,02/April./2024 Date,02/April/2024 Date,....../........................../2024 Date,....../........................../2024 Date,....../........................../2024
ALUMUNIUM ROOF
MAJADECK 035
ALUMUNIUM ROOF
SAW MAJADECK 035
20°
HO
RSE GORDING
40.4 CNP.125.50.20.2,3
0.4
MOUNTING 50.50.5
50.50.5
RING BALOK 20/30 COR 1:2:3
50.5
0.5
50.50.5
BEGEL Ø 6mm-15mm LISPLANK
40.4
BOLT Ø 1/3" 0.4 ALUMINUM # 2mm
15
REINFORCING Ø 4mm-10mm
50.50.5 50.50.5 50.50.5
DETAIL C
SCALE 1:10
ELBOW 45"
BEAMS
DETAIL E
SCALE 1:10
MOUNTING 50.50.5
50
SADOLE
40.40.4
40.40.4
40.40.4
28
80.80.8 GORDING SQUIRRELS BEAM 50.50.5
18.6 CNP.125.50.20.2,3
96.4
80.80.8
GORDING
CNP.125.50.20.2,3
40
4
247.7 0.
.4
.4
0
40
.4
SQUIRRELS 50.50.5
457.8
MOUNTING 50.50.5
505.4
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-12
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-13
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-14
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-15
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-16
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,
BARBED WIRE
Ø 2-200 MM
PROJECT TITLE: DRAWING TITLE: SCALE: DESIGN AND DRAWING BY: CLIENT/PROJECT OWNER : DRAWING NO.:
SACOM ENERGIA LDA
RDTL-BT-DW-16
PT BINTANG BAHARI KONSULTAN Checked by, Approved by,