Overview 1 Overview

The intention of this proposal is to propose and 2 Concept


presenting the design for upcoming project,
Panasonic Factory Renovation in Cileungsi,
3 Zoning
especially Lobby Area.

On the side of this page is the content overview, 4 Lighting Plan & Types
Main Contents parts of this document.

5 Construction Items

6 Visualization

7 Construction Drawing

* Please Note this document is still in the


development phase, subjects to change
2
Concept The redesign lobby area focus on providing a custom
comfortable Lounge area (Coffee area) for visitors to
enjoy coffee or some drink.

The Overall Concept of the project is


providing facility mainly for visitors at Provide some areas for displaying some stuff, in this
the lobby, as a place for Waiting area case Panasonic bicycles display, or maybe others on
or Lounge area and makes it more site.

comfortable and also displaying the


information, identity, and character of Have no receptionist person in place, instead it is
Panasonic in general. replaced by Touch Display Panel as Information
Center Interface.

The Concept overview in general


Overall design will be filled with some interior decoration,
are divided into two parts, functional area
and some of it will characterize itself the same as the
concept & design theme concept.
interior design in Panasonic Summitmas office, so it
Each one explained beside. will displaying some kind of Uniformity in the Design
theme.

* Please Note this document is still in the


development phase, subjects to change
Planterbox area
3
Zoning Lounge
&
Coffee Area Coffee Countertop

Areas of lobby divided into several zones as


described in this schematic drawing on the
side of this page. Wall Panel LED
&
Blue Wall
Semi Reception
Touch Panel Display
Panasonic
● Lots of area used as Coffee Area that become entrance
the main functional area from the main concept of
this Lobby area design, containing funitures for
table sets and coffee countertop.
Bicycle
Display stage
● Coffee Area and Bicycle Display Area using
Raise floor to differentiate the height of the floor
areas from the base floor.

Main Lobby VIDEOTRON


● Main Lobby floor height is the same as the Center Area panel
height of the existing one.

● Non human receptionist information with Touch


Panel Display right beside semi reception desk Stairs area

Corridor to upstairs
door to
manufacturing area
* Please Note this document is still in the
development phase, subjects to change
4
Lighting Plan Lighting items used will combined two types of lighting, type from retail
products and type from special project products. Lighting positioning
& types used plan drawing is available in construction drawing section.

NEO CCT
SLIM DOWN LIGHT (tricolor) DOWNLIGHT GLARELESS (fixed) PANEL SQUARE TYPE

For retail products, will be


used at main Coffee Area.
Placed at the ceiling area
with pergola.

Many units of NEO CCT


SLIM DOWN LIGHT
PENDANT (tricolor) used as main
lighting, its capability to
have 3 different lights For project products, will be used at main
SYSTEM LIGHT
makes it more flexible to center area of the lobby and its drop
change the mood nuance of ceiling around it.
the area.
DOWNLIGHT GLARELESS (fixed) at
Two units of PENDANTS near the front of the entrance door.
will be placed right above SYSTEM LIGHT mainly used as lighting
the circle table sets with 4 for bicycles display. PANEL SQUARE
seats. There will be 2 units TYPE substitutes the existing rectangle
of this type of table set. lights without changing the existing
acoustics by a lot.

* Please Note this document is still in the


development phase, subjects to change
5
List of
Ceiling Works Panasonic Logo (white acrylic)
Construction Items Coffee Area Ceiling
Ceiling With pergola
Blue Wall background
Logo white non glow
Center Area Ceiling with curvy corner
Furnitures
This is the summary of all the construction items Flooring Installation Semi Reception Desk
types planned for this Renovation project. Raise Floor coffee area Coffee Counter Table
Semi stage floor bicycle raise floor Table set with seats
These list of items will be used as the bases for the Dining Coffee Table
calculation of all the necessary costs for building Lighting installation Addtitional on top table items
this renovation project, relating it with the available LED strip at the edge of raise floor
project budget and also relating it with the on site LED strip at ceiling Touch Display Panel
LED strip at Wall Panel Information Center interface
actual construction phase in time, with its own
LED strip at staircase
detail counterparts explained later as needed.
Lighting items Vegetation Planterbox
Neo CCT Downlight (tricolor) Near some of the windows
Pendant At some column covering area
Downlight Glareless (fixed)
System Light
Panel Square Type

Decorative Wood material


Wall Panel Covering
Fluted Wall panel Covering
Wall Panel LED
Column Covering

* Please Note this document is still in the


development phase, subjects to change
6
Project

Visualization
Cut section view as 3D
perspective floor plan overview.

Isometric perspective view from


up and corner of the room,
displaying the visualization of
overall layout of the room in the
factory lobby area.

* Please Note this document is still in the


development phase, subjects to change
6

Project

Visualization
Coffee Area view from relatively
in front of the entrance door
looking into the area. With first
welcomed by Touch Display
Panel as Information Center
replacing Receptionist service
staff person.

* Please Note this document is still in the


development phase, subjects to change
6

Wall Panel with LED and Panasonic logo with blue wall background
Project and more wall panel just like the interior design in Panasonic
Summitmas.
Visualization
Fluted panel on the left into the coffee area different with the other side
of the area.

* Please Note this document is still in the Videotron in the position that can be viewed from any angle in the room.
development phase, subjects to change
6

Project

Visualization
Coffee Area view from the
corner of the room. The facilities
are table sets, two types, as
displayed in the picture.

Coffee Countertop just below


the wall TV for Coffee Maker
Machine and some other items.

Back wall of the TV with 2


designs, standard wall panel
on the left and fluted panel on
the right.

* Please Note this document is still in the


development phase, subjects to change
6

Project

Visualization
Overall view of the Lobby Area
facing the Coffee Area from the
front right corner of the room just
near the front window there.
* Please Note this document is still in the
development phase, subjects to change
6

Project

Visualization
Facing right through the Videotron from Coffee
Area. The Big Screen of Videotron makes its
screen can still clearly seen across the area of the
room edge.

Wall Panel design on the wall to factory area,


design just like sliding door at Panasonic
Summitmas
* Please Note this document is still in the
development phase, subjects to change
7
Construction
Drawing

( in development )

* Please Note this document is still in the


development phase, subjects to change
Some or all items in this Project Proposal Document may or
may not changed as time progress depends on the
requirements, the available project budget, and all other
decisions being made along the way of this project

Thank you

* Please Note this document is still in the


development phase, subjects to change

You might also like