Professional Documents
Culture Documents
1 s2.0 S0301479721022611 mmc1
1 s2.0 S0301479721022611 mmc1
5+ 33 24 1.0 1.3
Table S.3 Recommended desludging frequencies from Irish field data model for septic tank
systems (years) based on tank being 40% full. Desludging intervals of approximately 3 to 5
years highlighted in blue. Sizes outside Irish design guidelines left blank.
Number of full-time occupants
Tank working
2 3 4 5 6 7 8
volume (m3)
2.5 2.0 1.2
3.0 2.8 1.5 1.1 0.9 0.8
3.5 3.7 1.8 1.3 1.0 0.9 0.8 0.8
4.0 5.0 2.3 1.5 1.2 1.0 0.9 0.8
4.5 6.8 2.8 1.8 1.3 1.1 1.0 0.9
5.0 9.2 3.4 2.0 1.5 1.2 1.1 1.0
5.5 12.4 4.1 2.4 1.7 1.4 1.2 1.0
6.0 16.8 5.0 2.8 1.9 1.5 1.3 1.1
Table S.4 Recommended desludging frequencies from Irish field data model for septic tank
systems (years) based on tank being 50% full. Desludging intervals of approximately 3 to 5
years highlighted in blue. Sizes outside Irish design guidelines left blank.
Number of full-time occupants
Tank working
2 3 4 5 6 7 8
volume (m3)
2.5 3.0 1.6
3.0 4.3 2.0 1.4 1.1 1.0
3.5 6.3 2.6 1.7 1.3 1.1 1.0 0.9
4.0 9.2 3.4 2.0 1.5 1.2 1.1 1.0
4.5 13.4 4.3 2.5 1.8 1.4 1.2 1.1
5.0 19.6 5.6 3.0 2.0 1.6 1.3 1.2
5.5 28.5 7.2 3.6 2.4 1.8 1.5 1.3
6.0 41.6 9.2 4.3 2.8 2.0 1.6 1.4
Table S.5 Recommended desludging frequencies from Bounds equation for septic tank
systems (years) based on tank being 40% full. Desludging intervals of approximately 3 to 5
years highlighted in blue. Sizes outside Irish design guidelines left blank.
Number of full-time occupants
Tank working
2 3 4 5 6 7 8
volume (m3)
2.5 4.6 2.5
3.0 6.1 3.3 2.2 1.6 1.2
3.5 7.6 4.2 2.7 2.0 1.5 1.2 1.0
4.0 9.3 5.1 3.3 2.4 1.8 1.4 1.2
4.5 11.0 6.1 4.0 2.8 2.2 1.7 1.4
5.0 12.9 7.1 4.6 3.3 2.5 2.0 1.7
5.5 14.9 8.2 5.3 3.8 2.9 2.3 1.9
6.0 16.9 9.3 6.1 4.4 3.3 2.6 2.2
Table S.6 Recommended desludging frequencies from Bounds equation for septic tank
systems (years) based on tank being 50% full. Desludging intervals of approximately 3 to 5
years highlighted in blue. Sizes outside Irish design guidelines left blank.
Number of full-time occupants
Tank working
2 3 4 5 6 7 8
volume (m3)
2.5 6.4 3.5
3.0 8.4 4.6 3.0 2.2 1.7
3.5 10.6 5.8 3.8 2.7 2.1 1.7 1.4
4.0 12.9 7.1 4.6 3.3 2.5 2.0 1.7
4.5 15.4 8.4 5.5 4.0 3.0 2.4 2.0
5.0 18.0 9.9 6.4 4.6 3.5 2.8 2.3
5.5 20.7 11.3 7.4 5.3 4.1 3.2 2.7
6.0 23.5 12.9 8.4 6.1 4.6 3.7 3.0
Figure S1. Standard design two-chamber septic tank system complying with Irish design
regulations (EPA, 2021).
Figure S2. Volumetric sludge accumulation with respect to number of full-time house
occupants.
Figure S3. Organic fraction of sludge (volatile suspended solids) with respect to time since
installation / desludging.
Figure S4. Temperature and flow profiles measured in a septic tank in Ireland in the winter
(January and February), compared to prevailing air and soil temperatures.
Figure S5. Predicted mass accumulation of sludge per person at a particular point in time
(L/person) from average measured accumulation rates in the field. Average field
measurements also shown.
7000
R² = 0.987804878048781
5000
4000
3000
2000
1000
0
1 2 3 4 5 6 7
population per tank
Figure S6. Revised septic tank size relationship to number full time occupants to give design
desludging intervals of between 3 to 5 years according to Table 1.