Inspection Location/Area :Pipe Rack Modification Near Admin Block Date of Inspection : 20 November-2020
Department Area Covered : Road Block '' E '' Time of Inspection : 10:00 AM
OBSERVATIONS FOR FU
Repeated Priority Responsible
S.No. Item and Location Hazards Observed Yes / No Recommended Action
A/B/C Person
> Ensure that all personals prior start the job
has been inducted and oriented about the
hazards the job site & its precautions. >
Mechanical Supervisor should be present at site
> Power tools must be inspected from electrical team and 30-Nov-20
also installed inspection tags on the tools. >
Flash back arrestor should be installed on cylinders and
tarch.
HAZARD CONTROL LOG
Person Completing : Faiz Fareed Work Group : A
Hazard Controled Y / N
Implemented By
Reviewed Date
Evaluated By
Reviewed By
Initialed By
PERMANENT CONTROL
(Use Hierarchy of Controls)
HSE Manager
Faiz Fareed
25-Nov-20
Yes