Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

SITE ID: B22

SITE NAME: TABACO


PAT PHOTOS
TRANSFORMER SERVICE ENTRANCE

KW-HR METER GEN SET/ ATS

MCB MCB RATING


ECB ECB RATING

MTS MTS RATING

MOBILE BOX MOBILE BOX RATING

MDP MDP RATING

ACPDB ACPDB
ACPDB MAIN ACPDB BRANCHES
VOLTAGE READING (ECB)
LINE 1- LINE 2 LINE 2- LINE 3

LINE 1- LINE 3 LINE 1- GROUND

LINE 2- GROUND LINE 3- GROUND


VOLTAGE READING (ACPDB)
LINE 1- LINE 2 LINE 2- LINE 3
LINE 1- LINE 3 LINE 1- GROUND

LINE 2- GROUND LINE 3- GROUND

LOAD READING (MCB)


LOAD 1 LOAD 2

LOAD 3
LOAD READING (ACPDB)
LOAD 1 LOAD 2

LOAD 3
ACPDB BRANCH CIRCUIT LOAD READINGS
CKT 1 (LOAD 1) CKT 1 (LOAD 2)

CKT 2 (LOAD 1) CKT 2 (LOAD 2)

CKT 3 (LOAD 1) CKT 3 (LOAD 2)


CKT 4 (LOAD 1) CKT 4 (LOAD 2)

CKT 5 (LOAD 1) CKT 5 (LOAD 2)

CKT 6 (LOAD 1) CKT 6 (LOAD 2)

CKT 7 (LOAD 1) CKT 7 (LOAD 2)


CKT 8 (LOAD 1) CKT 8 (LOAD 2)

CKT 9 (LOAD 1) CKT 9 (LOAD 2)

CKT 10 (LOAD 1) CKT 10 (LOAD 2)

CKT 11 (LOAD 1) CKT 11 (LOAD 2)


CKT 12 (LOAD 1) CKT 12(LOAD 2)

CKT 13 (LOAD 1) CKT 13(LOAD 2)

CKT 14 (LOAD 1) CKT 14 (LOAD 2)

CKT 15 (LOAD 1) CKT 15 (LOAD 2)


CKT 16 (LOAD 1) CKT 16 (LOAD 2)
OPERATOR
DOCUMENT NO. PAGE

AS BUILT
SITE ID AREA SITE NAME

B22 SL
EQUIPMENT TYPE CONTROL # TABACO

PROJECT NAME
AC POWER UPGRADE OTHERS
SITE DEVELOPMENT PLAN
DOCUMENT NO
PAT DOCUMENTATION

VENDOR
Project AC UPGRADE
Site ID: B22
Site Name: TABACO
Date started
Date Finished:
Area: SOUTH LUZON

AS BUILT SINGLE LINE DIAGRAM

You might also like