1 2 3 4 5 6 7 8

HTS_FORM_085

A A
M/s. H.T. Switchgears -
Survey No. 77/5, Dangat Estate, NDA Road, At Post - Shivane,
Tal. Haveli, Dist. Pune - 411023. Maharashtra, India.
E-mail: technical@htswitchgears.com
Website:http://www.htswitchgears.com
Tel :020-2529 3812,13,14

B B

EQUIPMENT 40KVAR APFC PANEL,QTY-01NO.


PROJECT BERKHEDA MEDIUM IRRIGATION PROJECT
CLIENT GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA
C C
CONSULTANT M/s.MANOHAR CONSULTING ENGINEERS,PUNE
CONTRACTOR M/s.VINDHYA TELELINKKS LTD.,REWA(M.P)
JOB NUMBER J-1892/2021-22
PANEL SR. NO. HTS/J-1892/02/02/2022
D
MANUFACTURER M/s. H. T. SWITCHGEARS, PUNE - 411 023 D

CONTROL SUPPLY 240V AC


E E
AC AUX. SUPPLY 240V AC

Number of pages 13

F *Do not Modify Manually. 2 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= SLD, GA, LN
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 1
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com INFORMATION SHEET Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

AL. MAIN BUS BAR


40KVAR APFC PANEL
20X10X01/Phase 415V,100A,TP, AL. BUSBAR
A (P01) (P02) (P03) (P04) A
BUS 1 / 3.1:A
-IL1 -IL2 -IL3

AL,20x10x01/PH 6SQMM CABLEX1R 2.5SQMM CABLEX1R 2.5SQMM CABLEX1R


20x05x01/NE

MCCB ON MCCB OFF MCCB TRIP


RED GREEN AMBER

3 3 3 3

-Q01 I> -Q02 I> -Q03 I> -Q04 I>


100A,TP+N 32A,TP 16A,TP 16A,TP
MCCB MCCB MCCB MCCB
TMD BASED, TMD BASED, TMD BASED, TMD BASED,
-U1 -T O/C & S/C O/C & S/C O/C & S/C
B O/C & S/C -S1 B
F4-F5
2 1

2A,GLASS FUSE
WITH FUSE TERMINAL
A/M -C1 -C2 -C3
SELECTOR APFC RELAY TIMER 25A, POWER 12A, POWER 12A, POWER
SWITCH CONTACTOR CONTACTOR CONTACTOR
AX/EQV. AX/EQV. AX/EQV.

TAPE INSULATED CT
RATIO: 80/1A
x1 x1 x1
3

C -CT 1-3 ASS A -L1 -L2 -L3 C


CORE1: CL 0.5.10VA 10KVAR 5KVAR 5KVAR
7% AL. DETUNED x2 7% AL. DETUNED x2 7% AL. DETUNED x2
REACTOR REACTOR REACTOR
AMMETER SELECTOR ANALOGE
SWITCH AMMETER
0-80A

F1-F3 -R Y B
2 1
-CAP1 -CAP2 -CAP3
2A,GLASS FUSE APP CAPACITOR BANK APP CAPACITOR BANK APP CAPACITOR BANK
WITH FUSE TERMINAL R-PHASE Y-PHASE B-PHASE (11.1KVARx1No) (5.5KVARx1No) (5.5KVARx1No)
Red Yellow Blue

D D

EARTH BUS
AL. 25X5MM
AL,20x10x01/PH
20x05x01/NE

INCOMING

E E

FEEDER NO. 1F1 2F1/ 2F2


FEEDER INCOMER FROM
10KVAR CAP.BANK. 5KVAR CAP.BANK. 5KVAR CAP.BANK.
DESCRIPTION 415V LT MCC PANEL.,QTY:01NO
RATING 100A 32A 16A 16A

SCHEME TYPE INCOMER STAGE-1 STAGE-2 STAGE-3

CABLE SIZE 1R X 3.5C X 25SQ MM. XLPE AL. CONDUCTOR AR. CABLE ---- ---- ----

F 1 *Do not Modify Manually. 3 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= SLD, GA, LN
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 2
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com SINGLE LINE DIAGRAM Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

A (P05) (P06) (P07) (P08) A


2.8:A / BUS 1

2.5SQMM CABLEX1R 2.5SQMM CABLEX1R 2.5SQMM CABLEX1R 2.5SQMM CABLEX1R

3 3 3 3

-Q05 I> -Q06 I> -Q07 I> -Q08 I>


16A,TP 16A,TP 16A,TP 16A,TP
MCCB MCCB MCCB MCCB
TMD BASED, TMD BASED, TMD BASED, TMD BASED,
O/C & S/C O/C & S/C O/C & S/C O/C & S/C
B B

-C4 -C5 -C6 -C7


12A, POWER 12A, POWER 12A, POWER 12A, POWER
CONTACTOR CONTACTOR CONTACTOR CONTACTOR
AX/EQV. AX/EQV. AX/EQV. AX/EQV.

x1 x1 x1 x1

C -L5 -L6 -L7 -L8 C


5KVAR 5KVAR 5KVAR 5KVAR
7% AL. DETUNED x2 7% AL. DETUNED x2 7% AL. DETUNED x2 7% AL. DETUNED x2
REACTOR REACTOR REACTOR REACTOR

-CAP4 -CAP5 -CAP6 -CAP7


APP CAPACITOR BANK APP CAPACITOR BANK APP CAPACITOR BANK APP CAPACITOR BANK
(5.5KVARx1No) (5.5KVARx1No) (5.5KVARx1No) (5.5KVARx1No)

D D
EARTH BUS
AL. 25X5MM

E E

FEEDER NO. 2F1/ 2F2


FEEDER
5KVAR CAP.BANK. 5KVAR CAP.BANK. 5KVAR CAP.BANK. 5KVAR CAP.BANK.
DESCRIPTION
RATING 16A 16A 16A 16A

SCHEME TYPE STAGE-4 STAGE-5 STAGE-6 STAGE-7

CABLE SIZE ---- ---- ---- ----

F 2 *Do not Modify Manually. 4 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= SLD, GA, LN
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 3
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com SINGLE LINE DIAGRAM Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8
EYE BOLT EYE BOLT

A 1F1 2F1 A
R Y B STAGE-1 STAGE-2 STAGE-3 STAGE-4

IL1 IL1 IL1 IL1 COOLING FAN


IL1 IL2 IL3

A PB1 2 PB1 2 PB1 2 PB1 2


APFC
STAGE-5 STAGE-6 STAGE-7

IL1 IL1 IL1


ASS A/M
PB1 2 PB1 2 PB1 2

B B
1125

1125
FRONT
1200

1200
MCCB 2F2
100A,TP+N 40 KVAR CAP. BANK

10 KVAR X 01 NOS
05 KVAR X 06 NOS
LOUVERS

C C

E-BUS E-BUS E

75
75

1200 600
FRONT VIEW SIDE VIEW

GLAND PLATE ∅14


200X200MM-01NO FOUNDATION HOLE.
D D

PANEL DIMENSIONS
1200(L) X 1200(H) X 600(D)MM
600
560

40 KVAR CAP. BANK


200

E 200 E

200 200
1200

FRONT
FOUNDATION

F 3 *Do not Modify Manually. 5 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= SLD, GA, LN
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 4
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com GA DRAWING Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

A A

MAIN EQUIPMENTS METERS & RELAY INDICATION LAMPS/PUSH BUTTON/SWITCH

-R
3
MCCB AMMETER
I> A I.L. R-PHASE -RED

-Y
3
I.L. Y-PHASE -YELLOW
B FUSE AMMMETR SELECTOR B
ASS SWITCH
-B

I.L. B-PHASE -BLUE


-T
CONTACTOR

TIMER
-IL1

I.L. MCCB/CAP. ON - RED


-U1
CAPACITOR BANK -IL2

C APFC RELAY I.L. MCCB OFF- GREEN C

-IL3

I.L. MCCB TRIP- AMBER


L REACTOR

AUTO/ MANUAL SELECTOR SWITCH


-S1

D D

E E

F 4 *Do not Modify Manually. 6 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= SLD, GA, LN
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 5
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com LEGENDS Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

SR. (A) SYSTEM PARAMETERS (F) GENERAL NOTES


NO.
A 1) RATED VOLTAGE 415V +/- 10% 1) WIRING, PVC COPPER FLEXIBLE WIRE, GRADE 1.1KV A
CONTROL.WIRING : 1.5 Sq. mm. ,C.T.& P.T. WIRING: 2.5 Sq. mm.
2) SYSTEM DETAILS 3PH, 4 WIRE, 50HZ +/- 5% SPARE & PLC/SCADA WIRING: 1 Sq. mm. ,
*COLOUR CODE:-
3) SYSTEM EARTHING SOLIDLY EARTHING SYSTEM AC CIRCUIT:- PH-GREY N-.BLACK, EARTHING :- YELLOW / GREEN
C.T. & P.T. :- 'R' PHASE - RED, 'Y' PHASE - YELLOW, 'B' PHASE - BLUE, N:- BLACK
4) TYPE OF EXECUTION INDOOR SPARE WIRES FOR ALL COMPARTMENT WILL BE GRAY

5) DEGREE OF PROTECTION IP-42 2) SHILDED CABLE :- N.A..


3) WIRES FOR CLOSING & TRIPPING CIRCUIT DENOTED BY 'K' FERRULES.
IS/IEC REFERENCE:-
4) WIRES FOR INDICATION CIRCUIT DENOTED BY 'L' FERRULES.
1) Panel IS 13947 -1993 5) CT [METERING] CIRCUIT WIRES DENOTED BY 'D' FERRULES.
B B
2) 6) AC CIRCUIT DENOTED BY 'H' FERRULES.
C.B IS 13118 /IEC 60947-2-3
7) INTERPANEL WIRES SHALL BE SUPPLIED WITH THE PANELS TO BE MOUNTED AT SITE
3) C.T. IS 2705 /IEC 61869-1
8) 20% SPARE TERMINALS SHALL BE PROVIDED FOR CONTROL TERMINAL
(B) CONTROL SUPPLY VOLTAGE 9) AMBIENT TEMP: 50° C. TEMP. RISE: AS PER IEC694,TABLE V

INDICATION CKT. CONTROL CIRCUIT 10) ALL DOORS WILL BE EARTHED BY FLEXIBLE COPPER WIRE
1) 240V AC 2) 240V AC
SR. 11) C.T. / CABLE JUMPERS SHALL BE AS PER CT PRIMARY RATIO
(C) CIRCUIT BREAKER
NO. 12) CT SHALL BE AS PER SPECIFICATION.
1) MCCB TYPE INDOOR
C 13) PAINT SHADE : POWDER COATING, SIEMENS GREY (STRUCTURE) SHADE RAL 7032 C
2) BREAKING CAPACITY 25KA PAINTING THICKNESS : MINIMUM 40-80 MICRONS

3) SHORT TIME RATING 25KA FOR 1 SEC. 14) MATERIAL OF FABRICATION INTERNAL -CRCA
15) PANEL & DOORS ARE MADE UP OF CRCA SHEET METAL
4) RATED CURRENT 100A
BASIC STRUCTURE/LOAD BEARING MEMBER :- 2 mm.
16)
(D) MAIN & JUMPER BUSBAR 17) SIDE SHEET / SIDE COVER/ REAR COVER / FRONT DOOR /LT CHAMBER DOOR :- 1.6 mm.
18) GLAND PLATE UN-DRILLED:- 2 mm
1) MAIN BUSBAR SIZE -100A 20X10X01/PH, 20X05X01 FOR NEUTRAL
2) MATERIAL OF BUSBAR AL. 19) BASE FRAME 75 X 40 X 05 mm
D D
3) INSULATION OF BUSBAR PVC SLEEVE
20) GASKET - NEOPRENE RUBBER
4) BUS COLOR CODES R,Y,B COLOURED TAPING
21) POWER CABLE ENTRY : BOTTOM
(E) EARTH BUS
22) PANEL FABRICATION TOLERANCE: ±10%
1) EARTH BUS SIZE 25x5 MM.
23) PH to PH CLEARANCE IS 25 mm & PH TO E SHALL BE 20mm.
2) MATERIAL OF EARTH BUS AL.
24) VARIATION OF VOLTAGE: ±10% & VARIATION OF FREQUENCY: ±5%
25) EQUIPMENT POSITION/SIZE MAY BE CHANGE AT THE TIME OF MANUFACTURING.

E E

F 5 *Do not Modify Manually. =APFC PANEL/1 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= SLD, GA, LN
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 6
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com NOTES Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

TO NEXT PAGE
2.2:F 2.2:F 2.2:F 2.2:F
R Y B N
A A

2A,GLASS FUSE
B WITH FUSE TERMINAL B
F1-F3 R-PHASE
R 2 1 E10 x1 x2
Y-PHASE
RED
Y 2 1 E30 x1 x2
B-PHASE
YELLOW
B 2 1 E50 x1 x2

1 BLUE
N E70
NL1

C C
E10

11 23
-Q01 -Q01
/2.2:C 14 12 /2.2:C 24
MCCB MCCB,
AUX. CONTACT TRIP SWITCH

L1 L2 L3

x1 x1 x1
-IL1 -IL2 -IL3
D MCCB ON MCCB OFF MCCB TRIP
D
x2 x2 x2
RED GREEN AMBER

E70
MCCB ON MCCB OFF MCCB TRIP
I.L. I.L. I.L

R
R-230VAC / 5.1:A
TO CONTROL
N CIRCUIT
N-230VAC / 5.1:E
E E

R Y B N
INCOMING SUPPLY
F =SLD, GA, LN/6 *Do not Modify Manually. 2 F
Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= APFC PANEL
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 1
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com POWER CIRCUIT-METERING CIRCUIT Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

(P01) MAIN BUS


R BUS 1 R / 3.1:A
A A
Y BUS 1 Y / 3.1:B

B BUS 1 B / 3.1:B

6A,GLASS FUSE
WITH BASE
F4
Y 1 2 E32

6A,GLASS FUSE
WITH BASE
F5
R 1 2 E12

B 13 33 B
1 2 1 2

-U
AM AM APFC RELAY L101 AUX. SUPPLY
14 34 A A / 5.4:A
AUTO MODE MANUAL MODE E33 240VAC
9
SELECTED SELECTED

L114
R1 R1 / 5.6:B
E13
10
1 3 5
12 14 23
L124
-Q01 R2 R2 / 5.7:B
MCCB CT INPUT FROM -XB 5 D110
I> I> I> 11 24 S1
RATING AS PER SLD MCC PANEL
/1.5:D

/1.6:D

2 4 6 D170 L134
INCOMER APFC CT. -XB 6
S2 R3 R3 / 5.8:B
C C
L144
R4 R4 / 6.3:B
E

D71 L154 TO CAP. BANK


P2 R5 R5 / 6.4:B
CONTACTOR
4
XB L164
R6 R6 / 6.5:B
CURRENT TRANSFORMER (CT)

L174
R7 R7 / 6.6:B
DETAILS AS PER SLD

D 1 D
-XB

D12
2 AMMETER
-ASS
-XB R A1
ANALOGE
x1
D32
Y A
P1 3

-XB x2
B A2

E D52 E

R Y B N
1.2:A 1.2:A 1.2:A 1.2:A

FROM PREVIOUS PAGE


F 1 *Do not Modify Manually. 3 F
Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= APFC PANEL
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 2
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com POWER CIRCUIT-METERING CIRCUIT Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

(P02) (P03) (P04) (P05)


A A
2.7:A / BUS 1 R BUS 1 R / 4.1:A

2.7:A / BUS 1 Y BUS 1 Y / 4.1:B

2.7:B / BUS 1 B BUS 1 B / 4.1:B

1 3 5 1 3 5 1 3 5 1 3 5

-Q02 -Q03 -Q04 -Q05


B MCCB I> I> I> MCCB I> I> I> MCCB I> I> I> MCCB I> I> I> B
RATING RATING RATING RATING
AS PER SLD 2 4 6 AS PER SLD 2 4 6 AS PER SLD 2 4 6 AS PER SLD 2 4 6

R1 Y1 B1 R4 Y4 B4 R7 Y7 B7 R10 Y10 B10

1 3 5 1 3 5 1 3 5 1 3 5
-C1 -C2 -C3 -C4
/5.5:E 2 4 6 /5.6:E 2 4 6 /5.7:E 2 4 6 /6.2:E 2 4 6
CONTACTOR CONTACTOR CONTACTOR CONTACTOR
C C

R2 Y2 B2 R5 Y5 B5 R8 Y8 B8 R11 Y11 B11

x1 x1 x1 x1

-L1 -L2 -L3 -L4


/5.5:D /5.6:D /5.7:D /6.2:D
7% AL.DETUNED x2 7% AL.DETUNED x2 7% AL.DETUNED x2 7% AL.DETUNED x2
REACTOR REACTOR REACTOR REACTOR

R3 Y3 B3 R6 Y6 B6 R9 Y9 B9 R12 Y12 B12


D D

x1 x2 x3 x1 x2 x3 x1 x2 x3 x1 x2 x3
-CAP1 -CAP2 -CAP3 -CAP4
CAPACITOR BANK CAPACITOR BANK CAPACITOR BANK CAPACITOR BANK

STAGE-1 STAGE-2 STAGE-3 STAGE-4


E E

F 2 *Do not Modify Manually. 4 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= APFC PANEL
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 3
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com POWER CIRCUIT-CAPACITOR CIRCUIT Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

(P06) (P07) (P08)


A A
3.8:A / BUS 1 R R

3.8:B / BUS 1 Y Y

3.8:B / BUS 1 B B

1 3 5 1 3 5 1 3 5

-Q06 -Q07 -Q08


B MCCB I> I> I> MCCB I> I> I> MCCB I> I> I> B
RATING RATING RATING
AS PER SLD 2 4 6 AS PER SLD 2 4 6 AS PER SLD 2 4 6

R13 Y13 B13 R16 Y16 B16 R19 Y19 B19

1 3 5 1 3 5 1 3 5
-C5 -C6 -C7
/6.3:E 2 4 6 /6.4:E 2 4 6 /6.6:E 2 4 6
CONTACTOR CONTACTOR CONTACTOR
C C

R14 Y14 B14 R17 Y17 B17 R20 Y20 B20

x1 x1 x1

-L5 -L6 -L7


/6.3:D /6.4:D /6.6:D
7% AL.DETUNED x2 7% AL.DETUNED x2 7% AL.DETUNED x2
REACTOR REACTOR REACTOR

R15 Y15 B15 R18 Y18 B18 R21 Y21 B21


D D

x1 x2 x3 x1 x2 x3 x1 x2 x3
-CAP5 -CAP6 -CAP7
CAPACITOR BANK CAPACITOR BANK CAPACITOR BANK

STAGE-5 STAGE-6 STAGE-7


E E

F 3 *Do not Modify Manually. 5 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= APFC PANEL
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 4
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com POWER CIRCUIT-CAPACITOR CIRCUIT Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

AM
6A,GLASS FUSE
WITH BASE 1
U1
F6 2
APFC RELAY
R 1 2 L1 14 13 L101 C
A 1.2:E / 2.7:C / C / 6.1:A A
R-230VAC AUTO MODE SELECTED
A
/2.5:B
/5.3:B
/2.5:B R1 R2 R3
AM
R1 R2 R3
1
2
2.7:C 2.7:C 2.7:C
34 33 L102
L102 / 6.1:B
MANUAL MODE SELECTED
13 /2.5:B
/5.3:A
-S1 /2.5:B 11 11 11
TOGGLE SWITCH 14
PB2-S1 PB2-S2 PB2-S3
/5.3:C 12 /5.3:C 12 /5.3:D 12
B STOP STOP STOP B
STAGE 1 STAGE 2 STAGE 3

L111 L121 L131


L016 L102
21 21 21 13 23 33
PB2-S1 PB2-S6 PB2-S7 MX MX MX
/5.5:B 22 /6.4:B 22 /6.6:B 22 /5.4:E 14 /5.4:E 24 /5.4:E 34
STOP L011 STOP STOP L017
STAGE 1 STAGE 6 L015 STAGE 7
L3 L112 L122 L132
21 21
PB2-S2 PB2-S5
/5.6:B 22 /6.3:B 22
STOP STOP
STAGE 2 STAGE 5 13 13 13
L012 L014
C -PB1 13 -PB1 13 -PB1 13 C
START START START
21 21 14 C1 14 C2 14 C3
STAGE 1 STAGE 2 STAGE 3
/5.5:E /5.6:E /5.7:E
PB2-S3 PB2-S4 14 14 14
/5.7:B 22 /6.2:B 22
STOP STOP L113 L123 L133
STAGE 3 STAGE 4
L013
13 23 33
TX TX TX
-COOLING /5.3:E 14 /5.3:E 24 /5.3:E 34
FAN
17
-T1
/5.4:E 18 L114 L124 L134
L018
11 11 11
D -L1 D
-L2 -L3
/3.2:D 12 /3.3:D /3.5:D
12 12
L115 L125 L135
A1 A1 A1 A1 A1 A1 x1 A1 x1 A1 x1
TX TX1 -T1 MX MX1 -C1 -IL-1 -C2 -IL-1 -C3 -IL-1
A2 A2 0-10 MINUTE A2 A2 A2 A2 CAPACITOR x2 A2 CAPACITOR x2 A2 CAPACITOR x2
ON ON ON
1 RED RED RED
N L2
1.2:E / L2 / 6.1:E
N-230VAC
STAGE-1 STAGE-2 STAGE-3
13 14 /5.5:D
13 14 /6.3:D
23 24 /5.6:D 17 18 /5.3:D 13 14 /5.5:C 13 14 /6.6:C
E 23 24 /6.6:D
23 24 /5.6:C
1 2 /3.2:C
1 2 /3.3:C
E
33 34 /5.7:D 23 24 /6.3:C 3 4 /3.2:C 1 2 /3.5:C
33 34 /6.4:D
43 44 /6.2:D 33 34 /5.7:C 33 34 /6.4:C 3 4 /3.4:C 3 4 /3.5:C
5 6 /3.2:C
43 44 /6.2:C 5 6 /3.4:C 5 6 /3.5:C
13 14 /5.5:C
13 14 /5.7:C 13 14 /5.8:C

F 4 *Do not Modify Manually. 6 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= APFC PANEL
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 5
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com CONTROL CIRCUIT Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

U1
APFC RELAY
A 5.8:A / C A

R4 R5 R6 R7

R4 R5 R6 R7
2.7:D 2.7:D 2.7:D 2.7:D

5.8:B / L102

11 11 11 11
PB2-S4 PB2-S5 PB2-S6 PB2-S7
/5.3:D 12 /5.3:C 12 /5.3:C 12 /5.4:C 12
B STOP STOP STOP STOP B
STAGE 4 STAGE 5 STAGE 6 STAGE 7

L141 L151 L161 L171

43 23 33 13
MX MX1 MX1 MX1
/5.4:E 44 /5.5:E 24 /5.5:E 34 /5.5:E 14

L142 L152 L162 L172

13 13 13 13
C -PB1 13 -PB1 13 -PB1 13 -PB1 13 C
START START START START
14 C4 14 C5 14 C6 14 C7
STAGE 4 STAGE 5 STAGE 6 STAGE 7
/6.2:E 14 /6.3:E 14 /6.4:E 14 /6.6:E 14

L143 L153 L163 L173


43 13 33 23
TX TX1 TX1 TX1
/5.3:E 44 /5.3:E 14 /5.3:E 34 /5.3:E 24

L144 L154 L164 L174


11 11 11 11
D D
-L4 -L5 -L6 -L7
/3.6:D 12 /4.2:D 12 /4.3:D 12 /4.5:D 12

L145 L155 L165 L175


A1 x1 A1 x1 A1 x1 A1 x1
-C4 -IL-1 -C5 -IL-1 -C6 -IL-1 -C7 -IL-1
A2 CAPACITOR x2 A2 CAPACITOR x2 A2 CAPACITOR x2 A2 CAPACITOR x2
ON ON ON ON
RED RED RED RED

5.8:E / L2
STAGE-4 STAGE-5 STAGE-6 STAGE-7

E E
1 2 /3.6:C 1 2 /4.3:C
3 4 /3.7:C 1 2 /4.2:C 3 4 /4.4:C 1 2 /4.5:C
5 6 /3.7:C 3 4 /4.2:C 5 6 /4.4:C 3 4 /4.5:C
13 14 /6.2:C 5 6 /4.2:C 13 14 /6.5:C 5 6 /4.5:C
13 14 /6.4:C 13 14 /6.6:C

F 5 *Do not Modify Manually. 7 F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= APFC PANEL
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 6
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com CONTROL CIRCUIT Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
1 2 3 4 5 6 7 8

Terminal diagram HTS_FORM_085

A A

Strip
External targets
=APFC PANEL+-XB Internal targets

Target designation Wiring Jumper Function text Jumper Wiring Target designation Placement

1 MFM METERING CT /2.2:D

-ASS-R D12

B 2 MFM METERING CT B

-ASS-Y D32

3 MFM METERING CT

-ASS-B D52

A2 4 D71 -E /2.3:D

-ASS-Y:x2

C 5 CT INPUT FROM APFC CT D110 -U:S1 /2.6:C C

6 CT INPUT FROM APFC CT D170 -U:S2 /2.6:C

D D

E E

F 6 *Do not Modify Manually. F


Start Date 03-08-2021 EQUIPMENT : 40KVAR APFC PANEL,QTY-01NO. M/s. H.T. Switchgears Dwg.No: HTS/J-1892/02/02/2022
= APFC PANEL
Drawn by SSS PROJECT : BERKHEDA MEDIUM IRRIGATION PROJECT +
CLIENT : GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA At Post - Shivane, Tal. Haveli,
00 FIRST SUBMISSION 01.03.2022 SNM Checked by SKJ CONSULTANT :M/s.MANOHAR CONSULTING ENGINEERS,PUNE Dist. Pune - 411023.Maharashtra, India Page Title: Page 7
Rev Change Date Name Approved by RBK CONTRACTOR :M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) E-mail: technical@htswitchgears.com Terminal diagram =APFC PANEL+-XB Total Page 13
1 2 3 4 5 6 7 8
T:\EplanLT\Data\Projects\HTSLT
BILL OF MATERIAL
EQUIPMENT :- 40KVAR APFC PANEL, QTY-01NO.
PROJECT :- BERKHEDA MEDIUM IRRIGATION PROJECT
CLIENT :- GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA

CONSULTANT :- M/s.MANOHAR CONSULTING ENGINEERS,PUNE


CONTRACTOR :- M/s.VINDHYA TELELINKKS LTD.,REWA(M.P)
JOB NO. :- J-1892/2021-22.
PANEL SR. NO. :- HTS/J-1892/02/02/2022 REV.00
MANUFACTURER :- M/s. H.T. SWITCHGEARS, PUNE-411023 DATE:-01/03/2022
SR.NO. DR. TAG DESCRIPTION QTY MAKE
NO. EACH
A) INCOMER - 1
(P01 )
1 MCCB MCCB, 100A, TP+N , 25KA, TMD BASED 01 L&T/ ABB/ SCHNEIDER
O/C, S/C PROTECTION MITSUBISHI
1 C/O CONTACT FOR ON/OFF INDICATION & 1 TRIP CONTACT
SPREADER LINK
EXTENDED ROTARY HANDLE
2 CT 1, 2 & 3 RESIN CAST CT FOR METERING 03 HTS/STARLIT / NEWTEK /
CT RATIO :- 80/1A, ASMITA
CORE1: CL-0.5,10VA
BUSBAR SIZE -25x05x01 no.
3 A ANALOG AMMETER ,96 X 96 mm , MI TYPE 01 AE/RISHABH
SCALE : - 0 - 80A, C.T. RATIO : 80/ 1A

4 ASS AMMETER SELECTOR SWITCH 01 SALZER /KAYCEE


6A,4 POSITION OFF - R - Y - B

5 APFC APFC RELAY 01 L&T/EQV.


NO. OF STAGE :- 8 STAGE
AUX. SUPPLY:- 415V AC
C.T. INPUT CURRRENT :- 1A
6 A/M AUTO/ MANUAL SELECTOR SWITCH 01 SALZER/KEYCEE/
2POLE -2WAY, 3NO+2NC ELEMENT TECNIK

7 MX,MX1 AUX. RELAY FOR TRIP 04 PLA/Eqv.


TX,TX1 AUX. VOLTAGE - 240V AC ,
OUTPUT CONTACTS- 4 C/O, DIN RAIL MOUNTED
TYPE:- R4N/EQV.
8 T1 ON DELAY TIMER, 01 EAPL
FOR CAPACITOR ON / OFF
AUX. VOLTAGE -240V AC, 1 C/O CONTACT (0-10 MIN.)
9 I.L. INDICATING LAMPS, 22.5 MM DIA , 240V AC C&S
R INDICATING LAMP 'R PHASE' (RED) 01
Y INDICATING LAMP 'Y PHASE' (YELLOW) 01
B INDICATING LAMP 'B PHASE' (BLUE) 01

10 I.L. INDICATING LAMPS, 22.5 MM DIA , 240V AC C&S


IL1 INDICATING LAMP 'MCCB ON' (RED) 01
IL2 INDICATING LAMP 'MCCB OFF' (GREEN) 01
IL3 INDICATING LAMP 'MCCB TRIP' (AMBER) 01
11 F FUSE TERMINAL 06 CONNECTWELL/ELMEX
2A,GLASS FUSE 06
NEUTRAL LINK 02 DAV
12 FAN 6" INCH COOLING FAN - 230VAC 01 REXNOLD/JAINSON
WITH TOGGLE SWITCH

13 T.B. TERMINAL , CONNECTWELL/ELMEX


FOR CT DISCONNECTED TYPE 04
END PLATES FOR ABOVE 01
FOR CONTROL CIRCUIT 2.5 SQ MM 05
END PLATES FOR ABOVE 03
B) CAP. BANK 10KVAR (01NO)
(P02)
1 MCCB MCCB, 32A, TP , 25KA, TMD BASED 01 L&T/ ABB/ SCHNEIDER
O/C, S/C PROTECTION MITSUBISHI

Page 1 of 2
SR.NO. DR. TAG DESCRIPTION QTY MAKE
NO. EACH
2 C1 25A POWER/CAP DUTY CONTACTOR-AC3/EQV. 01 L&T/ ABB/ SCHNEIDER
FOR 10 KVAR WITH 1NO AUX CONTACT MITSUBISHI
COIL VOLTAGE - 240VAC

3 L1 7% AL. DETUNED REACTOR 01 ABB /AMRUTA/AMBIK


440V,3PHASE ,FOR 10 KVAR PRABHODHAN

4 CAP1 11.1 KVAR CAPACITOR TYPE:-APP 01 ABB /PRABHODHAN/


480V, 3PHASE, FOR POWER FACTOR IMPROVEMENT EPCOS

5 PB1 PUSH BUTTON FOR START (GREEN) 01 C&S/TEKNIC


WITH 1 NO ELEMENT

6 PB2 PUSH BUTTON FOR STOP (RED) 01 C&S/TEKNIC


WITH 2 NC ELEMENT

7 I.L. INDICATING LAMPS, 22.5 MM DIA , 240 V AC C&S


IL1 INDICATING LAMP ' ON' (RED) 01

C) CAP. BANK 5KVAR (6NOS)


(P03,P04,P05,P06,P07,P08)
1 MCCB MCCB, 16A, TP , 25KA, TMD BASED 06 L&T/ ABB/ SCHNEIDER
O/C, S/C PROTECTION MITSUBISHI

2 C2-7 12A POWER/CAP DUTY CONTACTOR-AC3/EQV. 06 L&T/ ABB/ SCHNEIDER


FOR 5 KVAR WITH 1NO AUX CONTACT MITSUBISHI
COIL VOLTAGE - 240VAC

3 L2-7 7% AL. DETUNED REACTOR 06 ABB /AMRUTA/AMBIK


440V,3PHASE ,FOR 5 KVAR PRABHODHAN

4 CAP2-7 5.5 KVAR CAPACITOR TYPE:-APP 06 ABB /PRABHODHAN/


480V, 3PHASE, FOR POWER FACTOR IMPROVEMENT EPCOS

5 PB1 PUSH BUTTON FOR START (GREEN) 06 C&S/TEKNIC


WITH 1 NO ELEMENT

6 PB2 PUSH BUTTON FOR STOP (RED) 06 C&S/TEKNIC


WITH 2 NC ELEMENT

7 I.L. INDICATING LAMPS, 22.5 MM DIA , 240 V AC C&S


IL1 INDICATING LAMP ' ON' (RED) 06
D) COMMON FOR PANEL -

1 WIRING, 1.1KV PVC FLEXIBLE COPPER LOT POLYCAB /


2.5 SQ. MM FOR C.T. CIRCUIT & FINOLEX
1.5 SQ. MM FOR CONTROL CIRCUIT
COLOR CODE : R, Y, B FOR CT,
AC CKT. :- PH-GREY,NEUTRAL-BLACK
POWER WIRING UPTO 16 SQ MM. :- R-Y-B-BLACK
GROUNDING CKT. (EARTHING) :- GREEN WITH YELLOW STRIPE

2 POWER CABLE LOT POLYCAB /


---------- 2.5 SQ.MM (R-Y-B-BLACK) FOR 5 KVAR BANK FINOLEX
6 SQ.MM (R-Y-B-BLACK) FOR 10 KVAR BANK

3 AL. AL. MAIN BUSBAR 100A LOT SUDAL/BHARAT


MAIN BUS BAR:- 25x05x01/PH, 25x03x01 FOR NEUTRAL
PVC INSULATED COLOUR CODED (RED, YELLOW, BLUE, BLACK)

4 -------- EARTH BUSBAR , AL.. 25 x 05 MM 01 SUDAL/BHARAT

5 -------- L' INSULATOR LOT REPUTED

6 -------- M.S. FABRICATED PANEL 01 HTS


DIMENSION : - AS PER G.A. DRAWING

Page 2 of 2
QUALITY ASSURANCE PLAN
EQUIPMENT :- 40KVAR APFC PANEL, QTY-01NO.
PROJECT :- BERKHEDA MEDIUM IRRIGATION PROJECT
CLIENT :- GOVERNMENT OF MADHYA PRADESH WATER RESOURCE DEPARTMENT,MADHYA PRADESH,INDIA
CONSULTANT :- M/s.MANOHAR CONSULTING ENGINEERS,PUNE LEGEND FOR INSPECTION AUTHORITY
CONTRACTOR :- M/s.VINDHYA TELELINKKS LTD.,REWA(M.P) P = PERFORM 1. SUB - VENDOR -
JOB NUMBER :- J-1892/2021-22. R = REVIEW 2. HTS -
PANEL SR. NO. :- HTS/J-1892/02/02/2022 W= WITNESS 3. CONTRACTOR-
MANUFACTURER :- M/s. H. T. SWITCHGEARS, PUNE - 411 023 4.CONSULTANT / TPI-
1 2 3 4 5 6 7 8
SR. COMPONENT CHARACTERISTIC QUANTUM REFERENCE ACCEPTANCE FORMAT OF INSPECTION AUTHORITY
NO. CHECK OF CHECK DOCUMENTS NORMS RECORD
1 2 3 4

1. M.S.SHEET QUALITY ,PHYSICAL 100% AS PER BILL OF SUPPLIERS TEST ROUTINE TEST
PROPERTIES i.e MATERIAL & DRAWING REPORT CERTIFICATE OF --- P --- ---
THICKNESS SUPPLIER
2. BUSBAR AL. QUALITY ,PHYSICAL 100% AS PER BILL OF SUPPLIERS TEST ROUTINE TEST
PROPERTIES I.e MATERIAL & DRAWING REPORT CERTIFICATE OF --- P --- ---
SIZE & THICKNESS SUPPLIER
3 CURRENT DIMENSIONAL CHECK , 100% AS PER BILL OF SUPPLIERS TEST ROUTINE TEST
TRANSFORMER RATIO CHECK MATERIAL, SUPPLIERS REPORT CERTIFICATE OF P R --- ---
DRAWING 'SUPPLIER

4 METERS DIMENSIONAL CHECK , 100% AS PER BILL OF SUPPLIERS TEST ROUTINE TEST
OPERATION CHECK MATERIAL, SUPPLIERS REPORT CERTIFICATE OF P R --- ---
DRAWING SUPPLIER
5 PAINT SHADE THICKNESS 100% APPROVED APPROVED ROUTINE TEST
DRAWINGS DRAWINGS CERTIFICATE OF P R --- ---
SUPPLIER
6 COMPLETE ROUTINE TEST , 100% APPROVED APPROVED HTS ROUTINE
L.T. PANEL DIMENSIONAL CHECK DRAWINGS DRAWINGS TEST CERTIFICATE --- P W W

* FOLLOWING ROUTINE TESTS CARRIED OUT ON RANDOM SELECTION OF IDENTICAL PANEL ( 20% ) -
A]. Visual inspection, dimension check & bill of material as per approved drawing - W W
B]. Checking of C.T. Ratio by primary injection test & C.T. Polarity as per manufacturer marking – W W
C]. Checking of Mechanical Operation of MCCB W W
D]. Checking of complete panel by giving 415V supply - W W
E]. Checking of meters & relay W W
F]. H.V. Test 2.5 kV for 1 minute without capacitor W W
G]. Megger test before & after H.V. by 500V Megger - W W

Note : (1) No witness Test for Sr. No. 1,2,3,4,5 involved . &
(2) Only Routine Tests for L.T. Panel ( Sr.No.6)

You might also like