Data Study Time Aktual (7 Des)

Washing Lem Oven Balancer Magnetizr Heat,Pres Asemblng Dielektrik Inspeksi Stamping
Automatic 42.34 8.92 84.375 10.78 17.41 0 0 2.4 70.59 0 Jum Operator
Hand Work 15.2 48.05 25.36 14.9 7.4 32.48 155.13 16.32 10.71 17.83 3
Walk 2 4 4 2 2 4 0 2 2 4 Signa CT
Jum Work 17.2 52.05 29.36 16.9 9.4 36.48 155.13 18.32 12.71 21.83 369.38
AHW 59.54 60.97 113.735 27.68 26.81 36.48 155.13 20.72 83.3 21.83
Penunggu -65.37 -63.94 -11.175 -97.23 -98.1 -88.43 30.22 -104.19 -41.61 -103.08 Max

OP1 124.91
OP2 89.34
OP3 155.13

Data Study Time WSC


Washing Lem Oven Balancer Dril Magnetizr Heat,Pres Asemblng Dielektrik Inspeksi Stamping
Automatic 5.9 2.9 84 12.7 0 18.7 90 0 3 75 0 Jum Operator
Hand Work 2 64 8 17 30 10 31.1 129 23.2 8.5 35.5 3
Walk 2 4 4 2 3 2 5 0 2 2 5 Sigma CT
Jum Work 4 68 12 19 33 12 36.1 129 25.2 10.5 40.5 389.3
AHW 9.9 70.9 96 31.7 33 30.7 126.1 129 28.2 85.5 40.5
Penunggu -138.1 -77.1 -52 -116.3 -115 -117.3 -21.9 -19 -119.8 -62.5 -107.5 Max

OP1 148
OP2 112.3
OP3 129

Data Study Time Aktual (14 Des) (Asemblng)


Washing Lem Oven Balancer Dril Magnetizr Heat,Pres Asemblng Dielektrik Inspeksi Stamping
Automatic 42.34 8.92 84.375 10.78 0 17.41 0 0 2.4 70.59 0 Jum Operator
Hand Work 15.2 48.05 25.36 14.9 0 7.4 32.48 103.64 16.32 10.71 17.83 3
Walk 2 4 4 2 0 2 4 0 2 2 4 Sigma CT
Jum Work 17.2 52.05 29.36 16.9 0 9.4 36.48 103.64 18.32 12.71 21.83 317.89
AHW 59.54 60.97 113.735 27.68 0 26.81 36.48 103.64 20.72 83.3 21.83
Penunggu -65.37 -63.94 -11.175 -97.23 -124.91 -98.1 -88.43 -21.27 -104.19 -41.61 -103.08 Max

OP1 124.91
OP2 89.34
OP3 103.64

Data Study Time Aktual (15 Des) ()


Washing Lem Oven Balancer Dril Magnetizr Heat,Pres Asemblng Dielektrik Inspeksi Stamping
Automatic 42.34 8.92 84.375 10.78 0 17.41 0 0 2.4 70.59 0 Jum Operator
Hand Work 2.356875 41.24857 1.585 11.20333 0 5.8609091 19.738889 108.55 9.1075 29.44 30.08 3
Walk 2 4 4 2 0 2 4 0 2 2 4 Sigma CT
Jum Work 4.356875 45.24857 5.585 13.20333 0 7.8609091 23.738889 108.55 11.1075 31.44 34.08 285.1711
AHW 46.69688 54.16857 89.96 23.98333 0 25.270909 23.738889 108.55 13.5075 102.03 34.08
Penunggu -29.55781 -22.08612 13.70531 -52.27136 -76.25469 -50.98378 -52.5158 32.295311 -62.747189 25.77531 -42.17469 Max
72.5 35
OP1 76.25469 76.6275
OP2 100.3664 153.255
OP3 108.55 68.39378
104.0998
111.6275

Data Study Time Aktual (16 Des) ()


Washing Lem Oven Balancer Dril Magnetizr Heat,Pres Asemblng Dielektrik Inspeksi Stamping
Automatic 42.34 8.92 84.375 10.78 0 17.41 0 0 2.4 70.59 0 Jum Operator
Hand Work 2.356875 41.24857 1.470625 11.20333 0 5.8609091 25.433333 108.55 10.886 18.65222 30.08 3
Walk 2 4 4 2 0 2 4 0 2 2 4 Sigma CT
Jum Work 4.356875 45.24857 5.470625 13.20333 0 7.8609091 29.433333 108.55 12.886 20.65222 34.08 281.7419
AHW 46.69688 54.16857 89.84563 23.98333 0 25.270909 29.433333 108.55 15.286 91.24222 34.08
Penunggu -29.44344 -21.97174 13.70531 -52.15698 -76.14031 -50.869405 -46.706981 32.409686 -60.854314 15.10191 -42.06031 Max

OP1 76.14031
OP2 97.05156
OP3 108.55

Data Study Time Aktual (19 Des) ()


Washing Lem Oven Balancer Dril Magnetizr Heat,Pres Asemblng Dielektrik Inspeksi Stamping
Automatic 42.34 8.92 84.375 10.78 0 17.41 0 0 2.4 70.59 0 Jum Operator
Hand Work 2.356875 41.24857 1.470625 10.312 0 5.8609091 23.6 108.55 9.63333333 16.371 30.418 3
Walk 2 4 4 2 0 2 4 0 2 2 4 Sigma CT
Jum Work 4.356875 45.24857 5.470625 12.312 0 7.8609091 27.6 108.55 11.6333333 18.371 34.418 275.8213
AHW 46.69688 54.16857 89.84563 23.092 0 25.270909 27.6 108.55 14.0333333 88.961 34.418
Penunggu -28.55211 -21.08041 14.59664 -52.15698 -75.24898 -49.978071 -47.648981 33.301019 -61.215647 13.71202 -40.83098 Max

OP1 75.24898
OP2 92.02233
OP3 108.55

1 2 3 4 5 6 7 8 9 10 11 12
Washing Lem Oven Balancer Dril Magnetizr Heat,Pres Sator Sudu Dielektrik Inspeksi Stamping
Automatic 42.34 8.92 84.375 10.78 0 17.41 0 0 0 2.4 75 0
Hand Work 2.356875 41.24857 1.470625 10.312 0 5.8609091 23.6 72.563333 35.9866667 9.633333 16.371 30.418
Walk 2 4 4 2 0 2 2 0 4 2 2 4
Jum Work 4.356875 45.24857 5.470625 12.312 0 7.8609091 25.6 72.563333 39.9866667 11.63333 18.371 34.418
AHW 46.69688 54.16857 89.84563 23.092 0 25.270909 25.6 72.563333 39.9866667 14.03333 93.371 34.418
Penunggu -28.55211 -21.08041 14.59664 -52.15698 -75.24898 -49.978071 -49.648981 -2.6856472 -35.262314 -61.21565 18.12202 -40.83098

OP1 75.24898 OP1 67.38807


OP2 104.409 OP2 73.44758
OP3 98.16333 OP3 72.56333
OP4 64.42233 19.81
shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
per operator 174.0476
123.1267

155.13

shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 209.3023
129.7667

129

shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 260.5172
105.9633

103.64

shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 248.7333
95.05703

108.55

shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 248.7333
93.91396

108.55

shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 248.7333
91.94044

108.55

shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
4 Kapasitas
Sigma CT Operator 372.0887501
277.8213 69.45533

Max 72.56333

3.828674

Max ahw 93.371


2.975456
Data Study Time Asembling (7 Des)
Stator Sudu on dielektrik
121.2 25.66 asumsi sudah
120.34 43.17 masuk di
100.42 45.58 bagian sudu
0 50.8 0
Jumlah 341.96 165.21
Rata rata 113.986667 41.3025
Total 155.289167

Data Study Time Asembling (14 Des)


Stator Sudu on dielektrik
59.5 0 0
58.4 33.38 0
70.6 31.3 6.53
61.9 26.9 5.5
68.9 31.07 6
85.66 25.98 3.69
62.81 29.78 4.36
71.4 35.14 8.37
Jumlah 539.17 213.55 34.45
Rata Rata 67.39625 30.50714 5.741667
Total 103.64506

Data 15 Desember
Copot pegas magnet Pasang Magnet di Sudu
2.52 38.27
2.77 26.66
3.63 24.68
2.27 31.37
2.47 32.04
3 34.41
2.77 35.33
2.7 38.8
2.67 Average 32.695
2.43
2.34
2.38
2.68 Total P2
2.52 41.2485714
Rata rata 2.653571
Menata Magnet 3
Pasang Lem 2.9

Press Bearing Asembling


21.52 Stator Sudu on dielektrik
19.58 86.8 32 4.54
22.71 66.2 29.5 3.5
21.44 66.7 32.66 4.27
22.4 73.69 33.09 4.1
18.4 66.37 29.45 3.26
17.58 75.62 35.55 4
14.54 Jumlah 435.38 192.25 23.67
19.48 Rata Rata 72.5633333 32.0416667 3.945
Average 19.73888889 Total 108.55

Data 16 Desember
Inspeksi Press Bearing
Copot Pasang Pencet 25.58
5.5 14.26 2.31 21.8
5.28 9.69 1.78 28.92
5.06 11.46 2.64 Average 25.4333333
3.92 8.86 4.9
3.3 11.9 3.3
4.2 9.96 4.68 Oven
3.47 11.29 2.3 6.93 awal
3.44 9.85 3.4 Total 23.53
3.53 15.06 2.53
Jumlah 37.7 102.33 27.84
Rata Rata 4.1888888889 11.37 3.093333
Total 18.65222222

Data 19 Desember
Inspeksi heat & Press Bearing
14.4 29.3
16.3 26.54
12.63 21.56
13.36 22.78
16.81 21.58
17.4 19.84
19.87 Average 23.6
18.98
16.79
17.17
Jumlah 163.71
Rata Rata 16.371

Asembling
Stator Sudu on dielektrik
86.8 32 4.54
66.2 29.5 3.5
66.7 32.66 4.27
73.69 33.09 4.1
66.37 29.45 3.26
75.62 35.55 4
Jumlah 435.38 192.25 23.67
Rata Rata 72.5633333 32.04167 3.945
72.5633333 35.98667
Total 108.55
Magnetizer Balancer Dielektrik Stamping
5.64 13.38 12.18 27.4
4.09 10.47 9.95 27.4
5.45 9.76 6.5 35.39
8.12 Average 11.20333 7.8 30.13
9.12 Average 9.1075 Average 30.08
5.38
5.51
6.28
5.18
4.27
5.43
Average 5.86090909
Inspeksi Washing
n dielektrik 24.66 nishugata semprot
30.22 33.48 4.23
29.8 Jumlah 37.71
33.08
Average 29.44

Drilling Oven
25.48 16.6 akir

Dielektrik
10.47 14.98
15.47 19.26
12.55 15.38
8.86 18.06
7.08 19.87
average 10.886
average 17.51
lagi 18.08111

Dielektrik Stamping
10.92 awal akhir (+wak)
10.56 18.51 5.35 23.86
7.42 22.69 4.47 27.16
average 9.63333333 28.35 7.78 36.13
25.07 7.65 32.72
25.3 6.92 32.22
average 30.418
Oven
6.93 awal balancer
Total 6.93 10.51
10.67
9.84
9.96
10.58
10.312
Operasi Operasi Pengikut
Pendahulu 1 2 3 4 5 6 7 8 9 10 11
1- 1 1 1 1 1 1 1 1 1 1
2 0- 1 1 1 1 1 1 1 1 1
3 0 0- 1 1 1 1 1 1 1 1
4 0 0 0- 1 1 1 1 1 1 1
5 0 0 0 0- 1 1 1 1 1 1
6 0 0 0 0 0- 1 1 1 1 1
7 0 0 0 0 0 0- 1 1 1 1
8 0 0 0 0 0 0 0- 1 1 1
9 0 0 0 0 0 0 0 0- 1 1
10 0 0 0 0 0 0 0 0 0- 1
11 0 0 0 0 0 0 0 0 0 0-
12 0 0 0 0 0 0 0 0 0 0 0

Operasi Operasi Pengikut


Pendahulu 1 2 3 4 5 6 7 8 9 10 11
1 0 54.16857 89.84563 23.092 0 25.27091 25.6 72.56333 39.98667 14.03333 93.371
2 0 0 89.84563 23.092 0 25.27091 25.6 72.56333 39.98667 14.03333 93.371
3 0 0 0 23.092 0 25.27091 25.6 72.56333 39.98667 14.03333 93.371
4 0 0 0 0 0 25.27091 25.6 72.56333 39.98667 14.03333 93.371
5 0 0 0 0 0 25.27091 25.6 72.56333 39.98667 14.03333 93.371
6 0 0 0 0 0 0 25.6 72.56333 39.98667 14.03333 93.371
7 0 0 0 0 0 0 0 72.56333 39.98667 14.03333 93.371
8 0 0 0 0 0 0 0 0 39.98667 14.03333 93.371
9 0 0 0 0 0 0 0 0 0 14.03333 93.371
10 0 0 0 0 0 0 0 0 0 0 93.371
11 0 0 0 0 0 0 0 0 0 0 0
12 0 0 0 0 0 0 0 0 0 0 0
12
1
1
1 1 46.69688
1 2 54.16857
1 3 89.84563
1 4 23.092 6 station
1 5 0 Max 93.371 1 1.2
1 6 25.27091 Min 14.03333 2 4,6,7,10
1 7 25.6 3 9.12
1 8 72.56333 4 8
1 9 39.98667 5 3
- 10 14.03333 6 11
11 93.371
12 34.418
13
14
15

12 Bobot Proritas
34.418 472.3494 519.0463 1 1 Station
34.418 418.1809 472.3494 2 2 5.558967
34.418 328.3352 418.1809 3 3
34.418 305.2432 328.3352 4 4
34.418 305.2432 305.2432 5 5
34.418 279.9723 305.2432 6 6
34.418 254.3723 279.9723 7 7
34.418 181.809 254.3723 8 8
34.418 141.8223 181.809 9 9
34.418 127.789 141.8223 10 10
34.418 34.418 127.789 11 11
0 0 34.418 12 12
logbook
No Tanggal
1 7-Nov-16
2 8-Nov-16
3 9-Nov-16
4 10-Nov-16
5 11-Nov-16
6 12-Nov-16
7 13-Nov-16
8 14-Nov-16
9 15-Nov-16
10 16-Nov-16
11 17-Nov-16
12 18-Nov-16
13 19-Nov-16
14 20-Nov-16
15 21-Nov-16
16 22-Nov-16
17 23-Nov-16
18 24-Nov-16
19 25-Nov-16
20 26-Nov-16
21 27-Nov-16
22 28-Nov-16
23 29-Nov-16
24 30-Nov-16
25 1-Dec-16
26 2-Dec-16
27 3-Dec-16
28 4-Dec-16
29 5-Dec-16
30 6-Dec-16
31 7-Dec-16
32 8-Dec-16
33 9-Dec-16
34 10-Dec-16
35 11-Dec-16
36 12-Dec-16
37 13-Dec-16
38 14-Dec-16
39 15-Dec-16
40 16-Dec-16
41 17-Dec-16
42 18-Dec-16
43 19-Dec-16
44 20-Dec-16
45 21-Dec-16
46 22-Dec-16
47 23-Dec-16
48 24-Dec-16
49 25-Dec-16
50 26-Dec-16
51 27-Dec-16
52 28-Dec-16
53 29-Dec-16
54 30-Dec-16
55 31-Dec-16
56 1-Jan-17
57 2-Jan-17
58 3-Jan-17
59 4-Jan-17
60 5-Jan-17
61 6-Jan-17
62 7-Jan-17
63 8-Jan-17
64 9-Jan-17
65 10-Jan-17
66 11-Jan-17
67 12-Jan-17
68 13-Jan-17
69 14-Jan-17
70 15-Jan-17
71 16-Jan-17
72 17-Jan-17
73 18-Jan-17
74 19-Jan-17
75 20-Jan-17
76 21-Jan-17
77 22-Jan-17
78 23-Jan-17
79 24-Jan-17
80 25-Jan-17
81 26-Jan-17
82 27-Jan-17
83 28-Jan-17
84 29-Jan-17
85 30-Jan-17
86 31-Jan-17
87 1-Feb-17
88 2-Feb-17
89 3-Feb-17
90 4-Feb-17
91 5-Feb-17
92 6-Feb-17
93 7-Feb-17
94 8-Feb-17
95 9-Feb-17
96 10-Feb-17
Kegiatan
Pengenalan Working Standart Chart Proses Assembling beserta Sistem K3
Pengenalan Part List mesin Diesel di PT. Kubota
Pengenalan Sistem Penomoran Mesin Diesel di PT Kubota Indonesia
Analisa Problem Asembling

Hari libur
Hari libur

Hari libur
Hari libur

Hari libur
Hari libur
PAINTNG

Hari libur
Hari libur

Hari libur
Hari libur
Hari libur Kelahiran Nabi Muhammad SAW
Hari Libur
Hari Libur

Hari Libur Akhir Tahun


Hari Libur Natal
Hari Libur Akhir Tahun
Hari Libur Akhir Tahun

Hari Libur
Hari Libur

Hari Libur
Hari Libur

Hari Libur
Hari Libur

Hari Libur
Hari Libur
Hari Libur
Hari Libur

You might also like