Washing Lem Oven Balancer Magnetizr Heat,Pres Asemblng Dielektrik Inspeksi Stamping
Automatic 42.34 8.92 84.375 10.78 17.41 0 0 2.4 70.59 0 Jum Operator
Hand Work 15.2 48.05 25.36 14.9 7.4 32.48 155.13 16.32 10.71 17.83 3
Walk 2 4 4 2 2 4 0 2 2 4 Signa CT
Jum Work 17.2 52.05 29.36 16.9 9.4 36.48 155.13 18.32 12.71 21.83 369.38
AHW 59.54 60.97 113.735 27.68 26.81 36.48 155.13 20.72 83.3 21.83
Penunggu -65.37 -63.94 -11.175 -97.23 -98.1 -88.43 30.22 -104.19 -41.61 -103.08 Max
OP1 124.91
OP2 89.34
OP3 155.13
OP1 148
OP2 112.3
OP3 129
OP1 124.91
OP2 89.34
OP3 103.64
OP1 76.14031
OP2 97.05156
OP3 108.55
OP1 75.24898
OP2 92.02233
OP3 108.55
1 2 3 4 5 6 7 8 9 10 11 12
Washing Lem Oven Balancer Dril Magnetizr Heat,Pres Sator Sudu Dielektrik Inspeksi Stamping
Automatic 42.34 8.92 84.375 10.78 0 17.41 0 0 0 2.4 75 0
Hand Work 2.356875 41.24857 1.470625 10.312 0 5.8609091 23.6 72.563333 35.9866667 9.633333 16.371 30.418
Walk 2 4 4 2 0 2 2 0 4 2 2 4
Jum Work 4.356875 45.24857 5.470625 12.312 0 7.8609091 25.6 72.563333 39.9866667 11.63333 18.371 34.418
AHW 46.69688 54.16857 89.84563 23.092 0 25.270909 25.6 72.563333 39.9866667 14.03333 93.371 34.418
Penunggu -28.55211 -21.08041 14.59664 -52.15698 -75.24898 -49.978071 -49.648981 -2.6856472 -35.262314 -61.21565 18.12202 -40.83098
155.13
shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 209.3023
129.7667
129
shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 260.5172
105.9633
103.64
shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 248.7333
95.05703
108.55
shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 248.7333
93.91396
108.55
shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
Kapasitas
Operator 248.7333
91.94044
108.55
shift 1 shift 2
Jum Operator Jam Kerja 7.5 6.5
4 Kapasitas
Sigma CT Operator 372.0887501
277.8213 69.45533
Max 72.56333
3.828674
Data 15 Desember
Copot pegas magnet Pasang Magnet di Sudu
2.52 38.27
2.77 26.66
3.63 24.68
2.27 31.37
2.47 32.04
3 34.41
2.77 35.33
2.7 38.8
2.67 Average 32.695
2.43
2.34
2.38
2.68 Total P2
2.52 41.2485714
Rata rata 2.653571
Menata Magnet 3
Pasang Lem 2.9
Data 16 Desember
Inspeksi Press Bearing
Copot Pasang Pencet 25.58
5.5 14.26 2.31 21.8
5.28 9.69 1.78 28.92
5.06 11.46 2.64 Average 25.4333333
3.92 8.86 4.9
3.3 11.9 3.3
4.2 9.96 4.68 Oven
3.47 11.29 2.3 6.93 awal
3.44 9.85 3.4 Total 23.53
3.53 15.06 2.53
Jumlah 37.7 102.33 27.84
Rata Rata 4.1888888889 11.37 3.093333
Total 18.65222222
Data 19 Desember
Inspeksi heat & Press Bearing
14.4 29.3
16.3 26.54
12.63 21.56
13.36 22.78
16.81 21.58
17.4 19.84
19.87 Average 23.6
18.98
16.79
17.17
Jumlah 163.71
Rata Rata 16.371
Asembling
Stator Sudu on dielektrik
86.8 32 4.54
66.2 29.5 3.5
66.7 32.66 4.27
73.69 33.09 4.1
66.37 29.45 3.26
75.62 35.55 4
Jumlah 435.38 192.25 23.67
Rata Rata 72.5633333 32.04167 3.945
72.5633333 35.98667
Total 108.55
Magnetizer Balancer Dielektrik Stamping
5.64 13.38 12.18 27.4
4.09 10.47 9.95 27.4
5.45 9.76 6.5 35.39
8.12 Average 11.20333 7.8 30.13
9.12 Average 9.1075 Average 30.08
5.38
5.51
6.28
5.18
4.27
5.43
Average 5.86090909
Inspeksi Washing
n dielektrik 24.66 nishugata semprot
30.22 33.48 4.23
29.8 Jumlah 37.71
33.08
Average 29.44
Drilling Oven
25.48 16.6 akir
Dielektrik
10.47 14.98
15.47 19.26
12.55 15.38
8.86 18.06
7.08 19.87
average 10.886
average 17.51
lagi 18.08111
Dielektrik Stamping
10.92 awal akhir (+wak)
10.56 18.51 5.35 23.86
7.42 22.69 4.47 27.16
average 9.63333333 28.35 7.78 36.13
25.07 7.65 32.72
25.3 6.92 32.22
average 30.418
Oven
6.93 awal balancer
Total 6.93 10.51
10.67
9.84
9.96
10.58
10.312
Operasi Operasi Pengikut
Pendahulu 1 2 3 4 5 6 7 8 9 10 11
1- 1 1 1 1 1 1 1 1 1 1
2 0- 1 1 1 1 1 1 1 1 1
3 0 0- 1 1 1 1 1 1 1 1
4 0 0 0- 1 1 1 1 1 1 1
5 0 0 0 0- 1 1 1 1 1 1
6 0 0 0 0 0- 1 1 1 1 1
7 0 0 0 0 0 0- 1 1 1 1
8 0 0 0 0 0 0 0- 1 1 1
9 0 0 0 0 0 0 0 0- 1 1
10 0 0 0 0 0 0 0 0 0- 1
11 0 0 0 0 0 0 0 0 0 0-
12 0 0 0 0 0 0 0 0 0 0 0
12 Bobot Proritas
34.418 472.3494 519.0463 1 1 Station
34.418 418.1809 472.3494 2 2 5.558967
34.418 328.3352 418.1809 3 3
34.418 305.2432 328.3352 4 4
34.418 305.2432 305.2432 5 5
34.418 279.9723 305.2432 6 6
34.418 254.3723 279.9723 7 7
34.418 181.809 254.3723 8 8
34.418 141.8223 181.809 9 9
34.418 127.789 141.8223 10 10
34.418 34.418 127.789 11 11
0 0 34.418 12 12
logbook
No Tanggal
1 7-Nov-16
2 8-Nov-16
3 9-Nov-16
4 10-Nov-16
5 11-Nov-16
6 12-Nov-16
7 13-Nov-16
8 14-Nov-16
9 15-Nov-16
10 16-Nov-16
11 17-Nov-16
12 18-Nov-16
13 19-Nov-16
14 20-Nov-16
15 21-Nov-16
16 22-Nov-16
17 23-Nov-16
18 24-Nov-16
19 25-Nov-16
20 26-Nov-16
21 27-Nov-16
22 28-Nov-16
23 29-Nov-16
24 30-Nov-16
25 1-Dec-16
26 2-Dec-16
27 3-Dec-16
28 4-Dec-16
29 5-Dec-16
30 6-Dec-16
31 7-Dec-16
32 8-Dec-16
33 9-Dec-16
34 10-Dec-16
35 11-Dec-16
36 12-Dec-16
37 13-Dec-16
38 14-Dec-16
39 15-Dec-16
40 16-Dec-16
41 17-Dec-16
42 18-Dec-16
43 19-Dec-16
44 20-Dec-16
45 21-Dec-16
46 22-Dec-16
47 23-Dec-16
48 24-Dec-16
49 25-Dec-16
50 26-Dec-16
51 27-Dec-16
52 28-Dec-16
53 29-Dec-16
54 30-Dec-16
55 31-Dec-16
56 1-Jan-17
57 2-Jan-17
58 3-Jan-17
59 4-Jan-17
60 5-Jan-17
61 6-Jan-17
62 7-Jan-17
63 8-Jan-17
64 9-Jan-17
65 10-Jan-17
66 11-Jan-17
67 12-Jan-17
68 13-Jan-17
69 14-Jan-17
70 15-Jan-17
71 16-Jan-17
72 17-Jan-17
73 18-Jan-17
74 19-Jan-17
75 20-Jan-17
76 21-Jan-17
77 22-Jan-17
78 23-Jan-17
79 24-Jan-17
80 25-Jan-17
81 26-Jan-17
82 27-Jan-17
83 28-Jan-17
84 29-Jan-17
85 30-Jan-17
86 31-Jan-17
87 1-Feb-17
88 2-Feb-17
89 3-Feb-17
90 4-Feb-17
91 5-Feb-17
92 6-Feb-17
93 7-Feb-17
94 8-Feb-17
95 9-Feb-17
96 10-Feb-17
Kegiatan
Pengenalan Working Standart Chart Proses Assembling beserta Sistem K3
Pengenalan Part List mesin Diesel di PT. Kubota
Pengenalan Sistem Penomoran Mesin Diesel di PT Kubota Indonesia
Analisa Problem Asembling
Hari libur
Hari libur
Hari libur
Hari libur
Hari libur
Hari libur
PAINTNG
Hari libur
Hari libur
Hari libur
Hari libur
Hari libur Kelahiran Nabi Muhammad SAW
Hari Libur
Hari Libur
Hari Libur
Hari Libur
Hari Libur
Hari Libur
Hari Libur
Hari Libur
Hari Libur
Hari Libur
Hari Libur
Hari Libur