TASK/ACTIVITY/PROCESS NAME LOADING UNLOADING MATERIAL AND LIFTING ACTIVITY DEPARTMENT / AREA : AL KHONAINI ST-1
RA NUMBER : 12 DATE : 14/1/2024
RA TEAM NAME SHAHBAZ ABDUL SAMAD (SAFETY SUPERVISOR) NEXT REVIEV DATE : AS NEEDED AS NEEDED
APPROVED BY ENGINEER : MOHAMMAD ABUHASOON (SAFETY ENGINEER) APPROVED BY SEC SAFETY DEPT
LIKELIHOOD
Examples (Consider Near-Hits as well as actual events)
(5) ALMOST
CERTAIN
The unwanted event has occurred frequently : Occurs in order of (1) or more per year & is likely to reoccur within 1 year
5 (M) 10 (H) 15 (H) 20 (Ex) 25 (Ex)
(4) LIKELY The unwanted event has occurred infrequently : Occurs in order of less than once per year & is likely to reoccur within 5 yrs.
4 (M) 8 (H) 12 (H) 16 (Ex) 20 (Ex)
(3) POSSIBLE The unwanted event has occurred in the business at some time: or could happen within 10 years.
3 (L) 6 (M) 9 (H) 12 (H) 15 (Ex)
(2) UNLIKELY The unwanted event has occurred in the business at some time: or could happen within 20 years.
2 (L) 4 (M) 6 (M) 8 (H) 10 (H)
(1) RARE The unwanted event has never known to occur in the business or it is highly unlikely to occur within 20 years.
1 (L) 2 (L) 3 (L) 4 (M) 5 (M)
RISK RISK LEVEL
(1) Insignificant (2) Minor (3) Moderate (4) Major (5) Catastrophic RATING
Medical Treatment Case Multiple Fatalities / Impact on
First Aid Case/Exposure to Minor Health Risk Exposure to Major Health Risk Loss Time Injury / Reversible Impact on Health Single Fatality or Loss of Quality of Life / Irreversible impact on Health
health Ultimately Fatal 15 to 25 (Ex) - Extreme
Minimal environment harm incident with Material Environment harm (RST) Serious environmental harm Major environmental harm –
workplace
Material Environment harm (RST)
incident (RMT)
Major environmental incident (RLT)
Incident Irreversible 8 to 12 (H) - High
No disruption to operation / 1000 SR to Less Partial Loss of Operation/1M SR Substantial or Total Loss of
than 10k SR
Brief Disruption to Operation / 10k SR to Less Than 100k SR Partial Shutdown/100k SR to Less than 1M SR To Less than10M SR Operation / 10M SR and more 4 to 6 (M) - Medium
1 to 3 (L) - Low
Consequence
Risks Issue
Likelihood
Likelihood
Work Activity Improve existing controls / implement new Follow up by Whom Controls Implemented
Item # (Process, Equipment, Materials)
Hazards (Possible incident)
[What can go wrong]
Existing Controls controls (name) & By When (date) Yes/No
(Accident / ill health to persons, fire or property loss)
LOADING UNLOADING Serious injury, • Certified and Experienced banks man and • Do not shorten the length of slings by LIFTING OPERATOR, SITE
MATERIAL AND LIFTING ImproperGear
Use of Lifting Fatality,
Material
Riggers.
• Suitable and safe lifting gears / tackles to be
4 4 16
making knots.
• Do not attach any substandard components 4 2 8 SUPERVISOR ,PERMIT
RECIEVER, SITE ENGINEER YES
ACTIVITY Damage used to lifting gears AND SAFETY ENGINEER
Serious injury, • Certified and experienced Operator, banks • Load to be lifted by attaching the slings to LIFTING OPERATOR, SITE
Incorrect Slinging and Fatality, man and Riggers to be appointed. designated lifting point. SUPERVISOR ,PERMIT
Lifting Methods Material • Safe lifting procedure to be addressed to the
3 5 15
• Ensure centre of gravity of the load prior to 3 3 9 RECIEVER, SITE ENGINEER YES
Damage lifting team and to be followed. advance the lifting operation. AND SAFETY ENGINEER
Serious injury, • Certified Cranes, Equipments and Lifting • Secure all loose materials properly and
LOADING UNLOADING Tackles. LIFTING OPERATOR, SITE
MATERIAL AND LIFTING Fatality, • All lifting gears, tackles and lifting hooks to safely prior to lift. SUPERVISOR ,PERMIT
Fall of Materials. Material
3 5 15
• Do not allow anybody to stand / pass 3 3 9 RECIEVER, SITE ENGINEER YES
ACTIVITY Damage be visually inspected for any kind of defects prior through under suspended load AND SAFETY ENGINEER
to use.
LOADING UNLOADING Serious injury, • Centre of gravity of the load to be ensured • Tag line to be used to direct the load into LIFTING OPERATOR, SITE
MATERIAL AND LIFTING Uncontrolled Fatality, prior to lift. position and prevent it spinning. SUPERVISOR ,PERMIT
movement of load. Material • Do not carry out any lifting operation in
3 4 12 3 2 6 RECIEVER, SITE ENGINEER YES
ACTIVITY Damage heavy wind condition • Slew the load smoothly. AND SAFETY ENGINEER
Serious injury, • Do not carry out any lifting operation in LIFTING OPERATOR, SITE
Fatality, adverse weather condition (Heavy wind, poor SUPERVISOR ,PERMIT
Adverse Weather Material •Wind speed to be monitored frequently. 4 3 12 4 2 8 RECIEVER, SITE ENGINEER YES
Damage visibility etc). AND SAFETY ENGINEER
LOADING UNLOADING Serious injury, • Always follow the approved / correct lifting LIFTING OPERATOR, SITE
MATERIAL AND LIFTING Working under Fatality, • If anybody asking for a lift which is not safe, procedure and instructions of lifting Supervisor SUPERVISOR ,PERMIT
pressure. Material never do it. Do not work under pressure.
3 4 12
/ Foreman / person responsible for the crane / 3 2 6 RECIEVER, SITE ENGINEER YES