UPPER LEVEL

PLATFORM LEVEL

CONCOURSE LEVEL
disconnecting link
PLATFORM 3-4
DISTRIBUTION
BOARDS

PLATFORM 1-2 PLATFORM 3-4


DISTRIBUTION DISTRIBUTION
BOARDS BOARDS

PLATFORM 1-2
DISTRIBUTION 4no. spare way
BOARDS
UPPER LEVEL/
CONTROL ROOM
4no. spare way

Earth Bar - Platform 1/2 Riser Cupboard


Earth Bar - Platform 3/4 Riser Cupboard
DISTRIBUTION
BOARDS

disconnecting link

SUB STATION
Substation Earth Bar
DB
ELECTRICAL SWITCHROOM
34

Bond to structural
steelwork
Main Earth Bar - Electrical Switch Room

Surge

(TVSS)
Voltage
Transient

Suppression
Bond to LTHW
pipework

Bond to incoming
Transformer star
telecoms (subject to
point
providers' acceptance)

Bond to electrical
Transformer frame containment systems

Earthing terminal
HV switchroom Bond to ventilation
earth terminal ductwork

Bond to lighting
HV switch frame protection system

Building metallic
Bond to water pipe
steelwork/frame

Cable containment
Fire Alarm Panel
FAP

systems

HV/LV chainlink Emergency Voice


fence Communication Panel
EVCS

Security Control Panel


SEC

Fire Supression
FSP

Panel
disconnecting link
Factor
Power

Correction
Surge

(TVSS)
Voltage
Transient

Suppression

CHILLERS

PLATFORM 0
DISTRIBUTION
BOARDS
PLATFORM 0
DISTRIBUTION
BOARDS

COMMS ROOM

6no. spare way


GENERATOR ENCLOSURE

Earth Bar - Comms Room


disconnecting link
disconnecting link

disconnecting link
disconnecting link
G
power supplies
Generator enclosure

disconnecting link

PLATFORM 1-2
EMERGENCY LTG DB

PLATFORM 3-4
EMERGENCY LTG DB

PLATFORM 0
EMERGENCY LTG DB
Earth Bar - UPS / Emergency Room

CONCOURSE/ TICKET HALL


EMERGENCY LTG DB

4no. spare way