CCS - Earthing Schematic - North
CCS - Earthing Schematic - North
CCS - Earthing Schematic - North
PLATFORM LEVEL
CONCOURSE LEVEL
disconnecting link
PLATFORM 3-4
DISTRIBUTION
BOARDS
PLATFORM 1-2
DISTRIBUTION 4no. spare way
BOARDS
UPPER LEVEL/
CONTROL ROOM
4no. spare way
disconnecting link
SUB STATION
Substation Earth Bar
DB
ELECTRICAL SWITCHROOM
34
Bond to structural
steelwork
Main Earth Bar - Electrical Switch Room
Surge
(TVSS)
Voltage
Transient
Suppression
Bond to LTHW
pipework
Bond to incoming
Transformer star
telecoms (subject to
point
providers' acceptance)
Bond to electrical
Transformer frame containment systems
Earthing terminal
HV switchroom Bond to ventilation
earth terminal ductwork
Bond to lighting
HV switch frame protection system
Building metallic
Bond to water pipe
steelwork/frame
Cable containment
Fire Alarm Panel
FAP
systems
Fire Supression
FSP
Panel
disconnecting link
Factor
Power
Correction
Surge
(TVSS)
Voltage
Transient
Suppression
CHILLERS
PLATFORM 0
DISTRIBUTION
BOARDS
PLATFORM 0
DISTRIBUTION
BOARDS
COMMS ROOM
disconnecting link
disconnecting link
G
power supplies
Generator enclosure
disconnecting link
PLATFORM 1-2
EMERGENCY LTG DB
PLATFORM 3-4
EMERGENCY LTG DB
PLATFORM 0
EMERGENCY LTG DB
Earth Bar - UPS / Emergency Room