Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909

(R1) S/4 HANA 1909 | SAP Blogs

Community

Ask a Question Write a Blog Post Login

Product Information

shailesh mishra
September 9, 2020 2 minute read

Material Staging of Release Order Parts Using two EWM-


Managed Storage Locations (R1) S/4 HANA 1909
Follow RSS feed Like

5 Likes 1,249 View 0 Comments

With the new release of S/4 HANA 1909 which had added many new functionalities in SAP EWM embedded
versions, one more simpli cation is rendered in area of ”Material staging with release order parts in repetitive
manufacturing.

Prior to S/4 HANA 1909, material staging as well as consumption in repetitive manufacturing was applicable
with one IM managed storage location, thus warehouse does not have bin level visibility of inventory.

S/4 HANA 1909 has introduced staging and consumption from EWM managed slocation.

This blog is written to explain how material staging can be conducted from Warehouse to Production supply
with the 2 EWM managed storage location.

The below diagram gives a clear indication of integration for diagram 1.

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 1/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

.The initiation point of the staging will be REM planned order.

With MF60, the staging of the release order parts for multiple orders can be executed.

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 2/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

The bom components are replenished from Whse(Sloc WAFS EWM managed) to PSA( E100 EWM managed)

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 3/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

The whole process can be explained with below process ow.

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 4/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

System creates a outbound delivery on saving the MF60 which in turn creates posting change in EWM. This
posting change creates staging warehouse task which moves component from Whse to PSA

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 5/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

Create a pick HU to move the packed component from Whse to PSA.

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 6/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

Now with RF gun, component can be staged from WHSE to PSA.

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 7/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

HUs are moved to PSA(P2 stock type) which will wait for production to nish, once production is nished,
consumption of HUS can be posted by MFHU.

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 8/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

For synchronously back ushing of Handling units, please check my below blog.

Synchronous back ushing of handling units from repetitive manufacturing into EWM embedded in SAP
S/4HANA 1909

Best regards

Shailesh Mishra

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 9/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

Alert Moderator

Assigned tags

SAP Extended Warehouse Management | EWM - Delivery Processing | EWM - Interfaces | MAN

(Manufacturing) | MAN Production Planning (PP) |

View more...

Related Blog Posts

Integration of EWM with Repetitive Manufacturing:Part-I


By shailesh mishra , Sep 10, 2019
Delivery based Production vs Advanced Production Integration- Delta Analysis
By shailesh mishra , Jun 28, 2019

SAP S/4HANA EWM <=> Advanced Production Integration => Production Orders
By Sriram Rokkam , Jan 03, 2019

Related Questions

Issue with auto VAS order creation during Kit Order Scenario
By Eric Vanhalst , Jun 24, 2020

Delivery for EWM not created when Production Order for staging released in ERP.
By Former Member , Feb 26, 2014
EWM Serial Number Storage Location Transfer
By Nuri Atasever , Aug 24, 2019

Be the rst to leave a comment

You must be Logged on to comment or reply to a post.

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 10/11
9/10/2020 Material Staging of Release Order Parts Using two EWM-Managed Storage Locations (R1) S/4 HANA 1909 | SAP Blogs

Find us on

Privacy Terms of Use

Legal Disclosure Copyright

Trademark Cookie Preferences

Newsletter Support

https://blogs.sap.com/2020/09/09/material-staging-of-release-order-parts-using-two-ewm-managed-storage-locations-r1-s-4-hana-1909/ 11/11

You might also like