Electrical Plan GMS
Electrical Plan GMS
T5 CONCEALED FLOURESCENT
CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV CCTV TEL. TEL. CATV CATV
2 2 2 2
2-30mm THHN , 1-8mm THHN , 40mmØ RSC 2-14mm THHN , 1-5.5mm THHN , 25mmØ RSC
CCTV CCTV CCTV TEL. TEL. CATV CATV
UPPER GROUND LEVEL ( ELECTRICAL ROOM)
M KWHM
GROUND ROD
20mm dia. x 3000mm COPPER ROD
1 RISER DIAGRAM
NOT TO SCALE
EE-1
SCHEDULE OF LOADS : MDP SCHEDULE OF LOADS : LIGHTING "LP1A" SCHEDULE OF LOADS : LIGHTING "LP1B" SCHEDULE OF LOADS : TYPICAL LIGHTING "LP2" & "LP3"
TOTAL 104580 TOTAL CONNECTED LOAD = 9600 VA TOTAL CONNECTED LOAD = 10700 VA 9 1000
USE : 2 - 14 mm²THHN, 1-5.5 mm² THHN (G) IN 32 mmØ RSC. USE : 2 - 14 mm²THHN, 1-5.5 mm² THHN (G) IN 32 mmØ RSC.
TOTAL CONNECTED LOAD = 104580VA USE : 2 - 250 mm²THHN, 1-30 mm² THHN (G) IN 75 mmØ RSC. I @ 80 % D. F. = 9600(.80 ) I @ 80 % D. F. = 10700(.80 ) 10 SPARE 1000
= 33.39 AMPS. MCCB : 60AT, 2P, 230V, 100AF, BOLT ON TYPE = 37.22 AMPS. MCCB : 60AT, 2P, 230V, 100AF, BOLT ON TYPE
230 Use minimum of 10kAIC for all MCCB 230 Use minimum of 10kAIC for all MCCB
I @ 80 % D. F. = 104580(.80 ) = 363.76 AMPS. TOTAL 14800
MCCB : 400AT, 2P, 230V, 400AF
230 Use minimum of 10kAIC for all MCCB
TOTAL CONNECTED LOAD = 14800 VA USE : 2 - 14 mm²THHN, 1-5.5 mm² THHN (G) IN 32 mmØ RSC.
I @ 80 % D. F. = 14800(.80 ) = 51.48 AMPS. MCCB : 60AT, 2P, 230V, 100AF, BOLT ON TYPE
230 Use minimum of 10kAIC for all MCCB
SCHEDULE OF LOADS : POWER "PP1A" SCHEDULE OF LOADS : POWER "PP1B" SCHEDULE OF LOADS : TYPICAL POWER "PP2" & "PP3"
MVAb = 100
2 1260 2 1620 2 1620
T1
100 kVA,1PH Calculate Short Circuit Fault at ECB:
3 1260 3 1260 3 1080
3% Xu = MVAb = 100 = 1 p.u.
4 EXHAUST FAN FULL BOX 1000 4 1080 4 1620 MVAsc. 100
5 CEILING FAN 600 5 1080 5 1620 XT1 = %Zt1 x MVAb = 0.03 x 100 = 30 p.u.
MVAt1. 0.10
2-250mm2 THHN , 50m
6 CEILING FAN 800 6 720 6 1080 Xc = Zc/305m x L x MVAb = 0.05/305 x 50 x 100 = 15.4 p.u.
2 - 5.5 mm² THHN,1-3.5mm² THHN, 2 - 5.5 mm² THHN,1-3.5mm² THHN, kV 2 2
7 SPLIT TYPE (1.5 TR ) 3220 30 7 SPLIT TYPE (1.5 TR ) 3220 30 7 CEILING FAN 800 0.23
25 mm ØC 25 mm ØC
2 - 5.5 mm² THHN,1-3.5mm² THHN, 2 - 5.5 mm² THHN,1-3.5mm² THHN,
Zth = Xu + Xt1 + Xc = 1 + 30 + 15.4 = 46.4 p.u.
8 MOTOR PUMP 3000 30 25 mm ØC 8 SPLIT TYPE (1.5 TR ) 3220 30 25 mm ØC 8 CEILING FAN 800
6 6
2 - 5.5 mm² THHN,1-3.5mm² THHN, 2 - 5.5 mm² THHN,1-3.5mm² THHN, Ifsc = MVAb x 10 = 100 x 10 = 9,370 Amps or 9.37 kA
9 MOTOR PUMP 3000 30 25 mm ØC 9 SPLIT TYPE (1.5 TR ) 3220 30 25 mm ØC 9 SPARE
V x Zth 230 x 46.4
10 SPARE 10 CEILING FAN 700 20 TOTAL 10240
9.37 kA Calculate Votage Drop at ECB:
11 SPARE 11 CEILING FAN 700 20
TOTAL CONNECTED LOAD = 10240VA USE : 2 - 14 mm²THHN, 1-5.5 mm² THHN (G) IN 32 mmØ RSC. 2.67% VD
E = IR
12 SPARE
I @ 80 % D. F. = 10240(.80 ) +.25 (14) = 39.12 AMPS. MCCB : 60AT, 2P, 230V, 100AF, BOLT ON TYPE
ECB 400A
230
I = 363 Amp.
TOTAL 15760 TOTAL 18440 Use minimum of 10kAIC for all MCCB
Conductor : 250 mm2 , Z = 0.050/305m (Table 9.1.1.9 PEC)
TOTAL CONNECTED LOAD = 15760 VA USE : 2 - 30 mm²THHN, 1-8 mm² THHN (G) IN 40 mmØ RSC. TOTAL CONNECTED LOAD = 18440 VA USE : 2 - 30 mm²THHN, 1-8 mm² THHN (G) IN 40 mmØ RSC. Length - 50 m
I @ 80 % D. F. = 15760(.80 ) +.25 (14) = 58.32 AMPS. MCCB : 100AT, 2P, 230V, 100AF,BOLT ON TYPE I @ 80 % D. F. = 18440(.80 ) +.25 (14) = 67.64 AMPS. MCCB : 100AT, 2P, 230V, 100AF, BOLT ON TYPE R = 0.050/305m x 50m = 0.0082 ohm
230 230
Use minimum of 10kAIC for all MCCB Use minimum of 10kAIC for all MCCB
VD = 2 IR = 2 x 374 x 0.0082 = 6.13 volts
3.05
a a a
S1 a,b,c
a
5.18
S1
DOWN TO S3W b b b b b b b b b EX
b
1.96
@ LOWER GROUND
S1 S1
DOWN TO S3W
@ LOWER GROUND
c
c c c c c c
2.09
S3 a,b,c S3 a,b,c S3 a,b,c
LP1B
2 LP1B
S3W S1 1 S3W
15.70
e d e d
5.33
1.20
d e d e d
PB
S2 d,e
S3 j,k,l
S1 h,i
4.73
S1 h,i S1
EX EX S 1 f,h
j EX EX
j i S2 S2 g
k
S1 S1 LP1B
f f f 3 S1
i i i i
5.18
j k f
j f S1
h h
"LP3"
2.52
MANAGERS ROOM h h h "PP3"
"MDP"
LP1B
j LP1B 4 "PP1A"
j k i i i i g g g g "LP2"
6 S2 g,f S2 g,f "PP2" "LP1B" "LP1A" "PP1B"
LP1B
5
1.20
LIGHTING OUTLET LIGHTING OUTLET
UNDERNEATH LANDING STAIR UNDERNEATH LANDING STAIR
2 UPPER GROUND FLOOR LIGHTING LAYOUT
SCALE 1:100 M.
EE-3
3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
39.20
f
f
g g h h
5.18
5.18
f b b b
h
g g h S1
S1 b
S3 f,g,h
i i j j j k k LP1A
S3W S1 1 S3W
STAIR WELL
15.70
5.33
5.33
LP1A
i 4 n
PB
LP1A
i i j j j k k k 2
i n
S3 i,j,k S1 l
S 2 d,e,c
S3 c,m,n m
l c m
d n
b b
MANAGERS ROOM
5.18
5.18
a
LP1A
3
b b
c e
l c m m n
S3 a,b
a
a
1 LOWER GROUND FLOOR LIGHTING LAYOUT LIGHTING OUTLET WALL MOUNTED EXHAUST FAN LIGHTING OUTLET
SCALE 1:100 M.
EE-3 UNDERNEATH LANDING STAIR UNDERNEATH LANDING STAIR
3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
0.60
39.20
b b b b b b b b b b b b b b b b
5.18
5.18
a a a a a a a a
DOWN TO S3W DOWN TO S3W
@ UPPER GROUND @ UPPER GROUND
b b b b
b b b b b b b b b b b b
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
b b b b
EX EX EX EX EX EX EX EX
S3W S2 a,b, S2 a,b, S2 a,b, S 2 a,b, S2 a,b, S2 a,b, S2 a,b, S2 a,b, S3W
LP2 LP2 LP2 LP2
15.70
c d 4 c d 3 c d 2 c 1
5.33
5.33
d
EX EX EX EX EX EX EX EX
b b b b
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
b b b b b b b b b b b b
b b b b
a a a a a a a a
5.18
5.18
b b b b b b b b b b b b b b b b
2 THIRD FLOOR LIGHTING LAYOUT LIGHTING OUTLET 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00 LIGHTING OUTLET
SCALE 1:100 M.
EE-4 UNDERNEATH LANDING STAIR UNDERNEATH LANDING STAIR
39.20
b b b b b b b b b b b b b b b b
5.18
5.18
a a a a a a a a
DOWN TO S3W DOWN TO S3W
@ UPPER GROUND @ UPPER GROUND
b b b b
b b b b b b b b b b b b
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
b b b b
EX EX EX EX EX EX EX EX
S3W S2 a,b, S2 a,b, S 2 a,b, S2 a,b, S2 a,b, S2 a,b, S2 a,b, S2 a,b, S3W
LP2 LP2 LP2 LP2
15.70
4 3 2 1
5.33
5.33
c d c d c d c d
EX EX EX EX EX EX EX EX
b b b b
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
b b b b b b b b b b b b
b b b b
a a a a a a a a
5.18
5.18
b b b b b b b b b b b b b b b b
0.60
1 SECOND FLOOR LIGHTING LAYOUT LIGHTING OUTLET 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00 LIGHTING OUTLET
SCALE 1:100 M.
EE-4 UNDERNEATH LANDING STAIR UNDERNEATH LANDING STAIR
39.20
PP1B PP1B PP1B
9 9 9
NOTES : 4 NO.
3.05
PP1B
FLR. MOUNTED C.O. 9
5.18
FM FM HD
1 @ THE STUDY TABLE AND 1 @ THE BED AREA.
1.96
HD
FM FM
2.09
PP1B
2
15.70
PP1B
5.33
1.20
1
4.73
PP1B
PP1B 4
6 PP1B
5
MANAGERS ROOM
5.18
"LP3" PP1B
2.52
3 "MDP"
"PP3"
PP1B "PP1A"
7 "LP2" "PP2" "LP1B" "LP1A" "PP1B"
PP1B
8
1.20
2 UPPER GROUND FLOOR POWER LAYOUT
SCALE 1:100 M.
EE-5
3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
5.18 39.20
5.18
PP1A
1
15.70
5.33
5.33
PB
PP1A
2
PP1A PP1A
8 MANAGERS ROOM MOTOR PUMP
MOTOR PUMP 9
5.18
5.18
PP1A
3
PP1A
7
5.18
5.18
PP2 PP2 PP2 PP2
4 3 2 1
15.70
5.33
5.33
PB
5.18
5.18
2 THIRD FLOOR POWER LAYOUT
SCALE 1:100 M.
EE-6 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
39.20
5.18
5.18
PP2 PP2 PP2 PP2
4 3 2 1
15.70
5.33
5.33
PB
5.18
5.18
PP2 PP2 PP2
PP2 7 6 5
0.60
8
1 SECOND FLOOR POWER LAYOUT
SCALE 1:100 M.
EE-6 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
39.20
3.05
5.18
1.96
CF CF CF CF CF CF CF
PP1B
S1 CF 10
2.09
S2 CF S2 CF S2 CF
15.70
5.33
1.20
PB
4.73
S 1 CF S1 CF S1 CF
S2 CF
PP1B
S1 CF 11
S1 CF
5.18
CF CF CF
CF CF
"LP3"
CF CF
2.52
"MDP"
MANAGERS ROOM "PP3"
"PP1A"
"LP2" "PP2" "LP1B" "LP1A" "PP1B"
1.20
2 UPPER GROUND FLOOR CEILING FAN LAYOUT
SCALE 1:100 M.
EE-7
3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
39.20
5.18
5.18
CF CF CF CF
CF CF
PP1A
S1 CF 5
S1 CF
S4 CF
PP1A
4
15.70
5.33
5.33
PB
2 2
F.B. FOR EXHAUST FAN WITH 2-3.5mm THHN & 1-2.5mmm THHN,20mmØ C (TYP.)
S1 CF S1 CF PP1A
S5 CF 6
MANAGERS ROOM
5.18
5.18
CF CF CF CF CF CF CF
CF
S2 CF
5.18
5.18
CF CF CF CF CF CF CF CF
PP2
7
15.70
5.33
5.33
PB
S 1 CF S1 CF S1 CF S1 CF S 1 CF S1 CF S1 CF S1 CF
PP2
8
CF CF CF CF CF CF CF CF
5.18
5.18
2 THIRD FLOOR CEILING FAN LAYOUT 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
SCALE 1:100 M.
EE-8
39.20
5.18
5.18
CF CF CF CF CF CF CF CF
PP2
7
15.70
5.33
5.33
PB
S1 CF S1 CF S1 CF S1 CF S1 CF S1 CF S1 CF S1 CF
PP2
8
CF CF CF CF CF CF CF CF
5.18
5.18
0.60
1 SECOND FLOOR CEILING FAN LAYOUT 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
SCALE 1:100 M.
EE-8
39.20
NOTE:
USE UTP CAT6 TO ALL CONNECTION CABLE.
CCTV CCTV CCTV CCTV
3.05
5.18
1.96
TO OFFICE
UTP CAT6 CABLE
CCTV
2.09
CCTV
15.70
5.33
1.20
TO OFFICE
UTP CAT6 CABLE
CCTV
4.73
TO OFFICE
UTP CAT6 CABLE
CCTV
5.18
EQUIPMENT RACK
TO OFFICE @ UPPER GROUND
TO OFFICE MANAGERS ROOM UTP CAT6 CABLE "LP3"
UTP CAT6 CABLE
2.52
"MDP"
"PP3"
TEL TEL "PP1A"
"LP2" "PP2" "LP1B" "LP1A" "PP1B"
CCTV
1.20
2 UPPER GROUND FLOOR TEL.,CATV & CCTV LAYOUT
SCALE 1:100 M.
AUX-1
3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
39.20
CTV
5.18
15.70
5.33
5.33
TO OFFICE @ LOWER GROUND
UTP CAT6 CABLE
EQUIPMENT RACK
MANAGERS ROOM
CCTV
5.18
5.18
CTV
CTV
TO OFFICE @ LOWER GROUND
TEL UTP CAT6 CABLE
CCTV TEL
3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
0.60
NOTE:
USE UTP CAT6 TO ALL CONNECTION CABLE. 39.20
5.18
5.18
15.70
CCTV CCTV
5.33
5.33
TO OFFICE @ UPPER GROUND
UTP CAT6 CABLE
5.18
5.18
2 THIRD FLOOR TEL.,CATV & CCTV LAYOUT
AUX-2 SCALE 1:100 M. 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
39.20
5.18
5.18
15.70
CCTV CCTV
5.33
5.33
TO OFFICE @ UPPER GROUND
UTP CAT6 CABLE
5.18
5.18
0.60
1 SECOND FLOOR TEL.,CATV & CCTV LAYOUT 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
SCALE 1:100 M.
AUX-2
NOTE: 39.20
LEGEND: USE UTP CAT6 TO ALL CONNECTION CABLE.
PC
D.O. D.O. D.O. D.O. D.O. D.O.
3.05
PC
5.18
MD PC PC
DC DATA CABINET
PC PC
D.O DUPLEX OUTLET
1.96
RT
PC PC
RT ROUTER PC PC
2.09
PC
TO MANAGERS OFFICE TV
PC PERSONAL COMPUTER @ UPPER FLOOR LEVEL MD
CEILING CABLE USING
MD MODEM UTP CAT6 CABLE
15.70
5.33
1.20
TV TELEVISION
ACCESS POINT
4.73
SD CONVENTIONAL
SMOKE DETECTOR D.O. TV
D.O.
MANAGERS ROOM MD
5.18
PR D.O. D.O.
PR
D.O.
TEL.
MDF
TEL.
2.52
PC DC
TEL.
PC PC
MD
2 UPPER GROUND FLOOR NETWORK COMMUNICATION LAYOUT
SCALE 1:100 M.
AUX-3
1.20
DECK SLAB ABOVE STAIR ACCESS POINT TO CEILING
DATA CABLE @ HALLWAY
3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
UTP CAT 6
CABLE
39.20
THIRD FLOOR
UTP CAT 6
5.18
5.18
CABLE
TO MANAGERS OFFICE
SECOND FLOOR @ LOWER FLOOR LEVEL
CEILING CABLE USING
MANAGERS OFFICE ACCESS POINT TO CEILING UTP CAT6 CABLE
DATA CABLE @ HALLWAY
5.33
5.33
UPPER GROUND FLOOR
MANAGERS OFFICE ACCESS POINT TO CEILING
DATA CABLE @ HALLWAY
UTP CAT 6
CABLE
DATA CABINET TV
D.O.
DC
LOWER GROUND FLOOR
MANAGERS ROOM
MD
TEL. D.O. D.O.
5.18
5.18
3 NETWORK COMMUNICATION DIAGRAM TEL.
SCALE NDTS.
AUX-3 PC
PC
PR
DC DATA CABINET
5.18
5.18
D.O DUPLEX OUTLET
RT ROUTER
PR PRINTER
PC PERSONAL COMPUTER
MD MODEM
TO MANAGERS OFFICE
TV TELEVISION @ UPPER FLOOR LEVEL
15.70
5.33
5.33
CEILING CABLE USING
UTP CAT6 CABLE
ACCESS POINT
SD CONVENTIONAL
SMOKE DETECTOR
5.18
5.18
1 SECOND FLOOR NETWORK COMMUNICATION LAYOUT
SCALE 1:100 M. 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
AUX-4
39.20
5.18
5.18
TO MANAGERS OFFICE
15.70
5.33
CEILING CABLE USING
UTP CAT6 CABLE
5.18
5.18
0.60
M M M
3.05
B B B
THIRD FLOOR SD
5.18
TF WIRE #18 SD
1.96
FDASCP
SD SD SD
M M M
SD
B B B
SECOND FLOOR C SD
2.09
TF WIRE #18
in a 12" PVC PIPE
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD ZONE
FDASCP
15.70
5.33
1.20
M M M
SD
B B B SD SD SD SD
UPPER GROUND FLOOR
TF WIRE #18
in a 12" PVC PIPE
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
4.73
B
FDASCP
M M M SD
B B B
LOWER GROUND FLOOR
5.18
SD SD SD SD SD SD SD
2.52
3 (FDAS) SINGLE LINE DIAGRAM SD
ZONE
SCALE NDTS 2
AUX-5 ZONE
3
A
1.20
2 UPPER GROUND FLOOR LAYOUT(FDAS ) 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
SCALE 1:100 M.
AUX-5 1 2 3 4 5 6 7 8 9 10 11
39.20
D
5.18
5.18
SD SD SD SD SD SD SD
ZONE
1
C
15.70
5.33
5.33
SD SD SD SD SD SD SD
ZONE
2
B
5.18
5.18
SD SD
SD SD SD SD SD
ZONE
3
A
1 LOWER GROUND FLOOR LAYOUT(FDAS )
SCALE 1:100 M.
AUX-5
3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
0.60
1 2 3 4 5 6 7 8 9 10 11
39.20
D
5.18
5.18
SD SD SD SD SD SD SD SD
ZONE
1
15.70
5.33
5.33
SD SD SD SD SD
ZONE
2
5.18
5.18
SD SD SD SD SD SD SD SD
ZONE
3
A
2 THIRD FLOOR LAYOUT(FDAS)
AUX-6 SCALE 1:100 M. 3.30 4.15 4.10 4.10 4.10 4.10 4.10 4.10 4.15 3.00
1 2 3 4 5 6 7 8 9 10 11
39.20
D
5.18
5.18
SD SD SD SD SD SD SD SD
ZONE
1
C
15.70
5.33
5.33
SD SD SD SD SD
ZONE
2
B
5.18
5.18
SD SD SD SD SD SD SD SD
ZONE
3
A
0.60