SAUDI ARAMCO ID/PID - 24-Mar-2016 - REV. 2015.09.01 (Standards Cutoff - September 6, 2015) Rev. 2015.09.

01 6-Sep-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Fill Placement and Compaction Inspection SAIC-A-1004 24-Mar-16 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Under foundations with static loads over 320kPa and foundations for
vibrating or heavy machinery and pavements, 85% of relative density
SAES-A-114
B5 (ASTM D4253/ASTM D4254) for cohesionless soils or 95% of of the
Sec. 6.3.6.2
maximum density as determined by ASTM D1557 for cohesive
materials.

When the backfill material cannot clearly be classified as cohesive or


cohesionless both relative density and Proctor density tests must be SAES-A-114
B6
performed per the above paragraph. The backfill shall then be Sec. 6.3.6
compacted to the greater density.

Compaction by water jetting is not permitted; Flooding may be used if SAES-A-114


B7
the material is cohesionless freely draining sand. Sec. 6.3.5.2

In no case shall compaction be allowed on slopes greater than 1 to 5; A


SAES-A-114
B8 series of horizontal benches, steps, or terraces, at least 3 meters wide
Sec. 6.3.2.1
should be constructed and compacted instead.

Construction of new slopes shall be accomplished by compacting


SAES-A-114
B9 horizontal fill layers at least 1 roller width beyond the design edge of the
Sec. 6.3.2.2
slope then trimming back to achieve the final slope dimensions.

Compacted surfaces of fill and backfill shall be finish graded to the cross
SAES-A-114
B10 sections, lines, grades and elevations as indicated on the drawings (PIP
Sec. 6.3.7
CVS 02100 Sec 4.3.7.12)

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-114 -- Excavation and Backfill, 23, February, 2010
2- SACSM -- Saudi Aramco Construction Safety Manual, October 2011
3- PIP CVS02100 -- Site Preparation, Excavation and Backfill Specification, April 2007
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED