CL - Qa.07b Column Reinforcement-1
CL - Qa.07b Column Reinforcement-1
7 Checked and ensured reinforcement is free from oil, mud, crease and other [ ] [ ]
forms of contamination.
CHECKS DURING EXECUTION
8 Ensured the column bars are placed as per GFC drawings with provision for [ ] [ ]
alternate lap zone.
9 Checked and ensured the spacing between the stirupps and the total number [ ] [ ]
of strirrups are as per design.
10 Ensured stirrups are provided up to the bottom of the each footing and at the [ ] [ ]
beam -column junction.
11 Ensured that the reinforcement bars that are projecting out of the current [ ] [ ]
area of concreting are parallel.
12 Ensured the cover blocks are ofcorrect sizes and at correct spacing. [ ] [ ]
13 Ensured minimum three strirupps are done above the concrete finishing level [ ] [ ]
to maintain the shape of the reinfoircement .
14 Ensured adequate anchorge lengths are provided at the bottom of the column [ ] [ ]
reinforcement.
15 Ensured the provision of dowels for future extensions are done are as per the [ ] [ ]
drawings.
16 Ensured the ends of the dowels for future extension are covered properly [ ] [ ]
with polythene sheets.
POST-EXECUTION CHECKS
17 Ensured the reinforcements are clean and free from any unwanted materials. [ ] [ ]
18 Ensured the reinforcements are tied properly with binding wire of necessary gauge. [ ] [ ]