3 OFFICE BLOCK CONTAINER AND

2 OFFICE BLOCK RESULTS AREA


CONTAINER KIOSK
OFFICE BLOCK CONTAINER

ABLUTION
WAITING AREA ( 2 NO,. TENTS)

ENTRANC
E

ABLUTION
BLOCK

SECURITY

SURROUNDING FENCING
Project: KARO PLATINUM PROJECT
Works: CONTAINERISED MEDICAL CENTRE
Contractor: TBA

ITEM NO PAY REF DESCRIPTION UNIT

ADDENDUM NO 1 - PENDING

SUMMARY

1 BILL NO 1 - Karo Mine Medical Centre Earthworks

2 Bill No 2: 2.2m Fencing

3 Bill No 3 : Contrainerised Offices and Medical Rooms

4 Bill No 4 : Electrical Supply

5 Bill No 5 : Water and Sewer Reticulation

TOTAL CARRIED TO SUMMARY

BILL NO 1 - Karo Mine Medical Centre Earthworks

SANS 1200
DM EARTHWORKS (ROADS, SUBGRADE)

Site Clearance
8.3.3
Clear vegetation and trees of girth up to 1m m²

1 8.3.2 Remove Topsoil to Nominal Depth 150mm, Stockpile and m3


Maintain

8.3.3 Excavation

a) Cut to waste excavated unsuitable materials to waste-free haul


2 distance 8km m3

Treatment of in-situ material

3 Rip and compact to a depth of 150mm and to a minimum of 93% Mod


AASHTO maximum density m2
Importing of Material

4 Backfill using selected G7 Material from approved borrowpits in


150mm layers thickness to a density of at least 93% Mod AASHTO.
8km freehaul distance. m3

5 Backfill using selected G7 Material from approved borrowpits in


150mm layers thickness to a density of at least 95% Mod AASHTO.
8km freehaul distance. m3

TOTAL CARRIED TO SUMMARY

Bill No 2: 2.2m Fencing


Payment
Item No. Material description Unit
Clause
Fencing
Heavy duty strain posts; 3000mm x 101 x 2mm with 76mm x 2mm
stays; Include holes for combo tensioner hooks; Strain post to have an No.
B2.3-1 overhang; Hot dip galvanised; Strain post to be capped
B2.3-2 Y-Standard; 3000mm with overhang; Bitumin Treated No.
B2.3-3 Y-Standard; 3000mm with overhang; Hot dip galvanized No.
B2.3-4 Wire; 2.24mm high strain; Fully galvanized m
B2.3-5 Wire; 3.00mm high strain; Fully galvanized m
Diamond mesh wire; 2.5mm diameter; 64mm aperture; 1800mm
m
B2.3-7 High; Fully galvanized

Total
Tensioner
High strain Combo tensioners for 2.24mm wire; Nemtek or similar
No.
B2.3-9 type; Hot dip galvanised
High strain Combo tensioners for 3.00mm wire; Nemtek or similar
No.
B2.3-10 type; Hot dip galvanised
S-hooks required to connect combo tensioner to strain post; 6mm
No.
B2.3-11 Diameter; Hot dip galvanised
Total
Civil
SANS 1200 C Site Clearance
The contractor needs to ensure that pricing is included for the
neccesary clearing that will be required to execute the works. A
breakdown of the Quantities, rates and payment references to be used
needs to be included in the breakdown.
Only grass cutting and tree clearing to be included. Trees to be cut to
have a maximum protrusion of 100mm above natural ground level. A
m
width of 2m to be cleared.
B2.3-12 8.2.1 Clear vegetation and trees of girth up to 1m
Clear trees of girth over 1.0m and up to and including 2m No.
B2.3-13 8.2.2 a)
SANS 1200 DA Earthworks
Excavation
B2.3-14 8.3.2 a) 300mm x 300mm x 600mm deep Footing No.
B2.3-15 8.3.2 a) 300mm x 600mm x 600mm deep Footing No.
Extra over (a) above for:
B2.3-17 8.3.2 c) 1) Intermediate Material m³
B2.3-18 8.3.2 c) 2) Hard rock Material m³
SANS 1200 GA CONCRETE (STRUCTURAL)
Strength Concrete, Class 20MPa/19mm; Concrete castings for strain

B2.3-19 8.1.3.1 a) posts and gates (excavation to be wetted before concrete)
Total
Gates
5m Double leaf gate as per drawing KP229-20002-M047-00-0180-
No.
B2.3-22 DTL-0001-01; Hot dip galvanised

Pedestrians gate as per drawing KP229-20002-M047-00-0180-DTL-


No.
B2.3-23 0001-01 ; Hot dip galvanised
Total
Overhang material
B2.3-26 Barbed wire; Single strand; 3.15mm x 2.5mm; Fully galvanised m
Total
P&Gs
Other (Please specify)
Total
Grand Total

Bill No 3 : Contrainerised Offices and Medical Rooms


Payment
Item No. Material description Unit
Clause

1 Four Room Office Block (12m) No

2 Two Room Office Block (6m) No.

3 Results Area Kiosk (12m) No

4 Three Room Office Block with ablution No

5 Ablution Block (12) No

6 2.5*2 Guard House No

7 10x10m CanvasPeg n Pole Tent with 4 windows no ground sheet Lumpsum

8 Transport for delivery Lumpsum


Carried Forward
Brought Forward

TOTAL CARRIED TO SUMMARY

Bill No 4 : Electrical Supply


Payment
Item No. Material description Unit
Clause

1 16Kw Solar System - Supply and Installation No

2 200Kva 11Kv/400V Pole Mounted Transfomer Supply and Install No

3 Conductor from Concentrator Substation to Clinic km

4 4sqmmx4 Core SWA Cable from Tranformer to Clinic m

5 10sqmm BCEW m

6 Containers Electrical Supply No

7 Preliminary and Generals Sum

TOTAL CARRIED TO SUMMARY

Bill No 5 : Water and Sewer Reticulation


Payment
Item No. Material description Unit
Clause

1 Potable water & Sewer system $ 35 768.55 no

Carried Forward
Brought Forward

TOTAL CARRIED TO SUMMARY


QTY RATE AMOUNT

$12,053.15

$8,971.50

$98,378.40

$50,700.00

$37,807.86

$207,910.91

1,600.00 $0.23 $368.00

135.00 $4.56 $615.60

135.00 $11.63 $1,570.05

900.00 $5.23 $4,707.00


135.00 $17.75 $2,396.25

135.00 $17.75 $2,396.25

$12,053.15

Quantities Supply Rate Install Rate Total

8 USD 123.17 USD 73.36 USD 1,572.20

40 USD 20.70 USD 5.06 USD 1,030.40


Rate only
240 USD 0.11 USD 0.08 USD 44.40
240 USD 0.24 USD 0.20 USD 105.96
120 USD 4.60 USD 1.40 USD 720.00

USD 3,472.96

10 USD 1.05 USD 0.17 USD 12.23

10 USD 1.15 USD 0.44 USD 15.87

20 USD 1.28 USD 0.25 USD 30.50

USD 58.60

120 USD 0.50 USD 60.00


5 USD 75.00 USD 375.00

USD -
USD -
22 USD 4.70 USD 103.40
28 USD 5.80 USD 162.40
USD -
0.4 USD 15.00 USD 6.07
0.4 USD 85.00 USD 34.43
USD -
2.7 USD 126.00 USD 105.00 USD 623.70
USD 1,365.00

1 USD 577.50 USD 315.00 USD 892.50

2 USD 420.00 USD 105.00 USD 1,050.00


USD 1,942.50

360 USD 0.17 USD 62.10


USD 62.10

USD 2,070.35
USD 2,070.35
$8,971.50

Quantities Supply Rate Install Rate Total

1.00 $19,200.00 $19,200.00

1.00 $11,800.00 $11,800.00

1.00 $10,200.00 $10,200.00

1.00 $20,500.00 $20,500.00

1.00 $20,600.00 $20,600.00

1.00 $4,100.00 $4,100.00

2.00 $3,489.20 $6,978.40

1.00 $5,000.00 $5,000.00


$98,378.40
$98,378.40

$98,378.40

Quantities Supply Rate Install Rate Total

- $20,000.00 $0.00

1.00 $15,800.00 $15,800.00

2.50 $2,600.00 $6,500.00

500.00 $10.00 $5,000.00

500.00 $10.20 $5,100.00

6.00 $1,100.00 $6,600.00

1.00 $11,700.00 $11,700.00

$50,700.00

Quantities Supply Rate Install Rate Total

1.00 US$37,807.86 $37,807.86

$37,807.86
$37,807.86

$37,807.86