SOP - Online Load Transfer From 50MVA Tr-2 To Tr-3 and Vice Versa
SOP - Online Load Transfer From 50MVA Tr-2 To Tr-3 and Vice Versa
SOP - Online Load Transfer From 50MVA Tr-2 To Tr-3 and Vice Versa
DEPARTMENTAL STANDARD
OPERATING PROCEDURES
DEPARTMENT : E&I
COPY NO : 01
ISSUE NO : 01
DATE OF ISSUE : 01-01-2024
REVISION NO : 01
ISSUED TO : E&I
NO TO
FROM
SOP/PE&I/ 00 00 01-01-2024 ORIGINAL
116
PELLET PLANT PARADEEP, ODISHA SECTION NO 04
STANDARD OPERATING PROCEDURES PAGE NO: 04 OF 07
REVISION NO: 01 EFFECTIVE DATE: 01-01-2024 ISSUE NO : 01
DOCUMENT TITLE: SOP FOR ONLINE LOAD TRANSFER FROM 40/50MVA TR-2 TO TR-3 AND VICE VERSA
APPROVED BY: HOD-E&I SIGNATURE: ISSUED BY: MR/MA
1. Purpose:
1.1 To ensure the smooth online load transfer from 40/50MVA Tr-2 to Tr-3 or vice
versa
2. Scope:
2.1 Paradeep Pellet Complex
4. Responsibility:
5. Description:
Before online load transfer from 40/50mva Tr-2 to Tr-3 and vice versa, please follow the
following SOP.
The following details describe the smooth online load transfer from 40/50mva Tr-2 to Tr-
3 and vice versa.
a) First ensure the idle Transformer-2 or 3 should be free from all PTW and its
220KV Breaker is in CLOSE condition.
b) Check the OLTC Tap position should be same in both the Transformer.
c) If Tr-2 load to be shifted to Tr-3, the check in 11KV incomer-4 that the synch OK
LED should be glow in the Micom P143 relay.
d) If the LED is not glowing then, check the Transformer-3 is not in charged
condition and first charge the Transformer and after Line voltage available,
synch OK LED will come.
PELLET PLANT PARADEEP, ODISHA SECTION NO 04
STANDARD OPERATING PROCEDURES PAGE NO: 07 OF 07
REVISION NO: 01 EFFECTIVE DATE: 01-03-2024 ISSUE NO : 01
DOCUMENT TITLE: SOP FOR ONLINE LOAD TRANSFER FROM 40/50MVA TR-2 TO TR-3 AND VICE VERSA
APPROVED BY: HOD-E&I SIGNATURE: ISSUED BY: MR/MA
e) Now in 11KV Bus coupler-2 select the TRIP selector switch at I/C-3.
f) Now CLOSE the 11KV I/c-4. By this, instantly I/c-4 will CLOSE and I/c-3 will
OPEN.
g) Now check the load (MW) in 11KV I/c-4, the same load should be shown in the
MFM as it was in I/c-3.
h) Now check the I/c-3 load should be ZERO.
i) Now it is safe to take the shutdown of the Tr-2 and 11KV I/c-3 Breaker.
If Tr-3 load to be shifted to Tr-2, then check in 11KV incomer-3 that the synch OK LED should
be glow in the Micom P143 relay.
j) If the LED is not glowing then, check the Transformer-2 is not in charged
condition and first charge the Transformer and after Line voltage available,
synch OK LED will come.
k) Now in 11KV Bus coupler-2 select the TRIP selector switch at I/C-4.
l) Now CLOSE the 11KV Incomer-3. By this, instantly I/c-3 will CLOSE and I/c-4 will
OPEN.
m) Now check the load (MW) in 11KV I/c-3, the same load should be shown in the
MFM as it was in I/c-4.
n) Now check the I/c-4 load should be ZERO.
o) Now it is safe to take the shutdown of the Tr-4 and 11KV I/c-4 Breaker.