PELLET PLANT PARADEEP, ODISHA SECTION NO 01

STANDARD OPERATING PROCEDURES PAGE NO: 01 OF 07


REVISION NO: 01 EFFECTIVE DATE: 01-01-2024 ISSUE NO : 01
DOCUMENT TITLE: COVER
APPROVED BY: HOD-E&I SIGNATURE: ISSUED BY: MR/MA

DEPARTMENTAL STANDARD
OPERATING PROCEDURES
DEPARTMENT : E&I
COPY NO : 01
ISSUE NO : 01
DATE OF ISSUE : 01-01-2024
REVISION NO : 01
ISSUED TO : E&I

ARCELOR MITTAL NIPPON STEEL INDIA


PELLET PLANT, PARADEEP
Udayabata, Dist: Jagatsinghpur,
Paradeep-754142
Odisha, India
PELLET PLANT PARADEEP, ODISHA SECTION NO
STANDARD OPERATING PROCEDURES PAGE NO:
REVISION NO: EFFECTIVE DATE: ISSUE NO :
DOCUMENT TITLE: TABLE OF CONTENTS
APPROVED BY: HOD SIGNATURE: ISSUED BY: MR/MA

SL TITLE SECTION NO OF REV


NO NO PAGES NO.
1 COVER PAGE 01 1 01
2 TABLE OF CONTENT 02 1 01
3 AMENDMENT RECORD 03 1 01
4 SOP FOR ONLINE LOAD TRANSFER FROM 40/50MVA TRANSFORMER-2 04 4 01
TO TRAFO-3 OR VICE VERSA
5
6
7
8
9
10
11
12
13
14
15

DOCUMENT DOC DOC REV REV DATE BRIEF DESCRIPTION OF CHANGE


NO REV NO
PELLET PLANT PARADEEP, ODISHA SECTION NO
STANDARD OPERATING PROCEDURES PAGE NO:
REVISION NO: EFFECTIVE DATE: ISSUE NO :
DOCUMENT TITLE: COVER PAGE
APPROVED BY: HOD SIGNATURE: ISSUED BY: MR/MA

NO TO
FROM
SOP/PE&I/ 00 00 01-01-2024 ORIGINAL
116
PELLET PLANT PARADEEP, ODISHA SECTION NO 04
STANDARD OPERATING PROCEDURES PAGE NO: 04 OF 07
REVISION NO: 01 EFFECTIVE DATE: 01-01-2024 ISSUE NO : 01
DOCUMENT TITLE: SOP FOR ONLINE LOAD TRANSFER FROM 40/50MVA TR-2 TO TR-3 AND VICE VERSA
APPROVED BY: HOD-E&I SIGNATURE: ISSUED BY: MR/MA

1. Purpose:
1.1 To ensure the smooth online load transfer from 40/50MVA Tr-2 to Tr-3 or vice
versa
2. Scope:
2.1 Paradeep Pellet Complex

3. Distribution: Unit Head


Head (E&I)
Head (HSE)
Operation Department
Mechanical Department
Civil Department
E&I Department
IT Department

4. Responsibility:

Operation Shift In-charge (Permit-to-work Authoriser)


Shift In-charge (E&I Department)
Authorised person for LOCK-OUT-TAG-OUT-TRY-OUT from E&I Department
Permit Applicant
Permit Holder

5. Description:

Before online load transfer from 40/50mva Tr-2 to Tr-3 and vice versa, please follow the
following SOP.

The following details describe the smooth online load transfer from 40/50mva Tr-2 to Tr-
3 and vice versa.
a) First ensure the idle Transformer-2 or 3 should be free from all PTW and its
220KV Breaker is in CLOSE condition.
b) Check the OLTC Tap position should be same in both the Transformer.
c) If Tr-2 load to be shifted to Tr-3, the check in 11KV incomer-4 that the synch OK
LED should be glow in the Micom P143 relay.
d) If the LED is not glowing then, check the Transformer-3 is not in charged
condition and first charge the Transformer and after Line voltage available,
synch OK LED will come.
PELLET PLANT PARADEEP, ODISHA SECTION NO 04
STANDARD OPERATING PROCEDURES PAGE NO: 07 OF 07
REVISION NO: 01 EFFECTIVE DATE: 01-03-2024 ISSUE NO : 01
DOCUMENT TITLE: SOP FOR ONLINE LOAD TRANSFER FROM 40/50MVA TR-2 TO TR-3 AND VICE VERSA
APPROVED BY: HOD-E&I SIGNATURE: ISSUED BY: MR/MA

e) Now in 11KV Bus coupler-2 select the TRIP selector switch at I/C-3.
f) Now CLOSE the 11KV I/c-4. By this, instantly I/c-4 will CLOSE and I/c-3 will
OPEN.
g) Now check the load (MW) in 11KV I/c-4, the same load should be shown in the
MFM as it was in I/c-3.
h) Now check the I/c-3 load should be ZERO.
i) Now it is safe to take the shutdown of the Tr-2 and 11KV I/c-3 Breaker.

If Tr-3 load to be shifted to Tr-2, then check in 11KV incomer-3 that the synch OK LED should
be glow in the Micom P143 relay.
j) If the LED is not glowing then, check the Transformer-2 is not in charged
condition and first charge the Transformer and after Line voltage available,
synch OK LED will come.
k) Now in 11KV Bus coupler-2 select the TRIP selector switch at I/C-4.
l) Now CLOSE the 11KV Incomer-3. By this, instantly I/c-3 will CLOSE and I/c-4 will
OPEN.
m) Now check the load (MW) in 11KV I/c-3, the same load should be shown in the
MFM as it was in I/c-4.
n) Now check the I/c-4 load should be ZERO.
o) Now it is safe to take the shutdown of the Tr-4 and 11KV I/c-4 Breaker.