Rework Procedure

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Note: All dates in this document should be using the format DD. Month YYYY. (e.g.

20th March, 2024.)


GENERAL INFORMATION
Organization xxxxx
Author Quality Manager
Title Rework Procedure
Number xxxxxxxxxxx
Total number of pages 2
Affected departments All division in the factory

REVIEW / APPROVAL
Designation Department Name / Signature Date
(dd Month YYYY)
REVIEW Quality Manager Quality Assurance Name:

Signature:__________________
Factory Manager Production Name:

Signature: _________________
APPROVAL Managing Director Admin Name:

Signature: _________________

REWORK
Versio Reason for Change Guideline Effective Date Updated by Document Status
n
01 Original 08th March 2024 Quality manager Current

REVISION HISTORY
REVISION NUMBER EFFECTIVE DATE REVISION SUMMARY
th
0 08 March, 2024 N/A
1. Introduction
Reworking non-conforming products is done in an organized and recorded manner. This is to
guarantee that the final items are of a high caliber. Rework items are handled, stored, and
used in a way that maintains quality, safety, trace-ability, and compliance with regulations.

2. Scope
All non-conforming products.

3. Purpose
To guarantee efficient product rework

4. Responsibility
Quality Assurance Manager, Production Manager and Warehouse Officer

5. Storage, Identification And Traceability


5.1 Rework that is stored needs to be shielded against contamination by microorganisms,
chemicals, and foreign materials.

5.2 For trace-ability purposes, the rework sample is labeled or clearly marked.

5.3 Moisture Content is the primary cause of the rework.

6. Rework usage
If the product's moisture content is not within the specified range, rework is produced.
Reworked product is allowed to rejoin the process during flash drying at a temperature of at
least 1500 C and a flow velocity of 30 rpm after the quantity of the product is recorded. To
prevent the product from becoming contaminated with extraneous matter, the QA Manager
makes sure that the packaging material is removed aseptically when performing rework
activities that require removing a product from filled packaging materials.

You might also like