Professional Documents
Culture Documents
SCADA RFI For SCADA Implementation Project
SCADA RFI For SCADA Implementation Project
FOR
Issue Date:
March 15, 2020
The primary objective of this RFI process is for Valley Water to gather benchmark information on SCADA
systems master planning and project development best practices to use in its development of future
SCADA implementation projects. This RFI process is neither a part of nor a method for a competitive
solicitation for any future SCADA projects. Valley Water will consider the information generated by this
RFI in conjunction with other data available to Valley Water to assist in its outreach efforts with
stakeholders and to develop requirements and specifications for inclusion in future Valley Water project
procurement documents. Respondents to this RFI are encouraged to respond to future project RFPs.
However, a response to this RFI is not mandatory in order to participate in any later solicitation
processes.
RFI Schedule
The RFI procurement schedule is listed in Table 1 below. All dates set forth in this RFI are subject to change
at Valley Water’s sole discretion and will be provided as an addendum and posted on CAS. All references
in this RFI to “time” are Pacific Time.
Table 1
ACTIVITY DESCRIPTION/LOCATION DATE OR PERIOD
Submittals for RFI Questions and afraumeni@valleywater.org No later than 3 p.m.
Clarification on March 31, 2020
Valley Water Response to No later than 5 p.m.
Respondent(s) RFI Questions on April 7, 2020
and Clarification & Issue
Addenda
RFI Responses Due Date Electronic: Refer to Section 2.5.1 Responses due on or
Written: Refer to Section 2.5.2 before 2 p.m. on
April 21, 2020
Meetings (tentative) Refer to Section 2.5.4 May 5, 2020 &
Video Conference Call or May 6, 2020
Valley Water Office - TBD
Valley Water’s written response to questions or requests for clarification will be posted to CAS. Valley
Water reserves the right to make changes in the RFI documents as it may deem appropriate up to the
time set for the response due date. Any and all changes in the RFI documents will be made by issuance
of written addenda. Automatic notification of addenda is sent to Respondents registered under the
Expertise Code identified in Section 1.2 About this RFI.
Valley Water will not accept electronic responses submitted after the response due date and time.
Furthermore, Valley Water will not be responsible for slow or delayed electronic response submissions
regardless of whether it is caused by, but not limited to, the World Wide Web, Internet Service Provider,
third party system, or Valley Water firewall or infrastructure.
Electronic Response
Please refer to Attachment C CAS User Guide. Log onto Valley Water web portal: cas.valleywater.org. If
not done so already, create an account so you will receive updates and notifications electronically from
the CAS. Should you have any technical problems or questions regarding electronic response submittal,
please refer to Section 2.1 Communication Protocol and contact the designated contact for this RFI. The
Expertise Code assigned to this RFI is listed in Section 1.2 About this RFI.
Due to the COVID-19 health emergency, the submission of the Written Response (Submittal) is required
to be submitted electronically as stated below.
Responses must be received as identified below, by the due date and time as stated in Table 1 to be
considered responsive. Late and/or misdirected responses will not be considered.
Respondents must submit the following:
a. Response Submittal: The Electronic Response must include the entire response
requirements and any required attachments as directed in Section 3 RFI Response
Requirements.
• The Response Submittal must be submitted electronically to the Valley Water
web portal: cas.valleywater.org.
b. Additional requirements:
• All submittal files must be in PDF format and cannot exceed 20MB per file.
• There is no limit to the number of files that can be attached.
• CAS shall serve as the official record as to whether a submittal submitted in
response to this RFI was received by the submittal due date and time.”
Written Response
Due to the COVID-19 health emergency, the submission of the Response is required to be submitted as
directed in Section 2.5.1 Electronic Response. No hard copy responses will be accepted.
May 5, 2020
May 6, 2020
If interested in scheduling a meeting, please submit your completed Appendix A, General Information
and Acknowledgement with your response as specified with Section 2.2 RFI Schedule. Respondents
must indicate (by time period number shown in the list above), your top three preferred meeting times.
Time slots will be issued on a first-come first-serve basis to qualified SCADA Consultant firms for
therefore, an early response to this RFI is advised.
Rules of Engagement
This RFI is not and shall not be construed under any circumstances as a pre-requisite or prequalification
procedure or step for later participation in future procurements. A failure to respond to this RFI does
not prohibit participation in any procurements that Valley Water may issue.
Valley Water does not seek submittal of any trade secrets or other proprietary information over which a
responder may wish to exert rights of confidentiality, exclusive ownership, or other types of continuing
control. All information provided by responders may be published or otherwise made publicly available
by Valley Water in accordance with applicable laws, including the California Public Records Act.
Responders should not include proprietary or confidential information with the information contained in
any response to this RFI.
Responses shall be typed, as concise as possible, and in English language only. Written Response copies
should be printed double-sided on paper with a minimum 30 percent (30%) post-consumer recycled
content. Narrative pages are to be 8½x11 (inches). 11x17 pages, if used, shall be used sparingly and only
where required to convey related information that cannot otherwise be accommodated on an 8½x11
page. All pages shall be sequentially numbered. The Respondent may use cross-references in its response
to save space and to avoid redundancy.
D. ACKNOWLEDGEMENT
The Request for Information (RFI), required Appendix A, and Addenda, if any, are made a part of this
RFI. Addenda are posted online at http://cas.valleywater.org.
The undersigned acknowledges receipt of the following Addenda to the RFI documents:
CHECK ONE OF THE FOLLOWING:
☐ NO Addenda received
- or -
☐ Addenda received as follows (list all addenda acknowledged):
Addendum No. Dated Addendum No. Dated
Addendum No. Dated Addendum No. Dated
Addendum No. Dated Addendum No. Dated
Addendum No. Dated Addendum No. Dated
May 5, 2020
May 6, 2020
ACKNOWLEDGEMENT (continued)
All responses must be signed by an authorized representative of the Respondent with the authority to
bind the Respondent.
AUTHORIZED REPRESENTATIVE:
The undersigned certify that I/we submit this RFI response and sign this Appendix A General Information
and Acknowledgement with full and proper authorization to do so and have read, understood, and will
comply with all the terms and conditions set forth in the RFI documents.
Signature:
Name (print):
Title:
Date: