1. OBJECTIVE
To ensure that Purchase Orders are correctly authorised and processed by the KHOMANIE
GROUP FOUR PROJECTS and that the suppliers are controlled and paid.
2. SCOPE
2.1 Evaluation, approval and control of suppliers / sub-contractors (Flow diagram 1).
2.3 Verification of the purchased products / services received before use (Flow diagram 3).
3. PROCESS OWNER
4. REFERENCES
ISO 9001, Procedure 8.4 : Control of Externally Provided Processes, Products and
Services
ISO 45001, Procedure 8.4 : Control of Externally Provided Processes, Products and
Services
OHSAS 18001, Clause 4.4.6 : Operational Control
Form F 8.5A : Supplier Evaluation and Re-evaluation
Page 1 of 9
5. RESPONSIBILITY AND AUTHORITY
7. PROCESS
Category B = Suppliers who supply standard items or services that are ordered from the shelf.
7.1.4.1 Category A suppliers who fail to maintain the standards of delivery and service will be re-
evaluated for their suitability to remain on the Approved Supplier List.
7.1.4.2 Assistance in order to eliminate the cause of the failure and recommended corrective action
should be offered during the review.
7.1.4.3 If the supplier is unable to rectify the failure within a reasonable period of time, such supplier will
be removed from the Supplier List.
NOTE: 1. As far as possible, all safety equipment that is bought should carry the SABS mark
of approval.
2. The MSDS for each chemical must always be requested on the order.
The order is processed and e-mailed to supplier,
7.2.2 Refer to flow diagram 2 for the ordering process.
7.3 Verification of Purchased Items is controlled according to the process described in Flow
Diagram 3 below.
The Office Admin files the documents in accordance with paragraph 9 below.
All sub-processes within the total purchasing process are monitored informally by evaluating the
availability of items when they are needed.
PPE is issued to all staff as per customer requirement for those staff working at the customer’s
premises and the use of such PPE is enforced in order to ensure worker safety. Contractors
performing repairs and maintenance are required to sign a disclaimer as well as provide their
safety documentation eg. medicals, insurance, etc. to Khomanie Group Four Projects prior to
their approval.
9. RECORDS
Authorised
Department Method
Description of Position to File Method of Retentio
where Records to
Records and Retrieve Filing n Time
are Filed Discard
Records
Page 3 of 9
10. LIST OF OUTSOURCED PROCESSES
Page 4 of 9
Flow Diagram 1: EVALUATION, APPROVAL AND CONTROL OF SUPPLIERS
Page 5 of 9
Flow Diagram 2 : PROCUREMENT FROM SUPPLIER
Page 6 of 9
Flow Diagram 3 : PROCUREMENT FROM STORES
Page 7 of 9
Flow Diagram 4: VERIFICATION OF PURCHASED PRODUCT
Page 8 of 9
10. LIST OF OUTSOURCED PROCESSES
Page 9 of 9