Professional Documents
Culture Documents
HILTI Anchor Design
HILTI Anchor Design
94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 1
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
Specifier's comments:
1 Anchor Design
1.1 Input data
Anchor plate
CBFEM
: lx x ly x t = 350.0 mm x 250.0 mm x 8.0 mm;
CBFEM
- The anchor calculation is based on a component-based Finite Element Method (CBFEM)
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
1
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 2
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
y
Anchor reactions [kN]
Tension force: (+Tension, -Compression) 3 4
Anchor Tension force Shear force Shear force x Shear force y
1 20.411 1.531 1.529 0.079 Tension
2 0.634 1.421 1.421 -0.011 x
3 20.414 1.531 1.529 -0.079
Compression
4 0.635 1.421 1.421 0.011
1 2
Anchor forces are calculated based on a component-based Finite Element Method (CBFEM)
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
2
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 3
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
N
NSd £ NRd,s = Rk,s EOTA TR 029, Table 5.2.2.1
gM,s
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
3
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 4
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
N
NSd £ NRd,p = Rk,p EOTA TR 029, Table 5.2.2.1
gM,p
0 Ap,N
NRk,p = NRk,p · 0
· y s,Np · y g,Np · y ec1,Np · y ec2,Np · y re,Np EOTA TR 029, Eq. (5.2)
Ap,N
0
NRk,p = p · d · hef · t Rk EOTA TR 029, Eq. (5.2a)
0
Ap,N = scr, Np · scr,Np EOTA TR 029, Eq. (5.2b)
0.5
t Rk,ucr
scr,Np = 20 · d · (
7.5 )
£ 3 · hef EOTA TR 029, Eq. (5.2c)
s
ccr,Np = cr,Np EOTA TR 029, Eq. (5.2d)
2
c
y s,Np = 0.7 + 0.3 · 1.00 EOTA TR 029, Eq. (5.2e)
ccr,Np £
0,5
y g,Np
0
= y g,Np - (s s )
cr,Np
· (y g,Np - 1) ³ 1.00
0
EOTA TR 029, Eq. (5.2f)
1,5
0
y g,Np = √n - (√n - 1) · (k · √dh · t· f ef
Rk
ck,cube
) ³ 1.00 EOTA TR 029, Eq. (5.2g)
1
y ec1,Np = 1.00 EOTA TR 029, Eq. (5.2h)
2 · ec1,N £
1+
scr,Np
1
y ec2,Np = 1.00 EOTA TR 029, Eq. (5.2h)
2 · ec2,N £
1+
scr,Np
h
y re,Np = 0.5 + ef £ 1.00 EOTA TR 029, Eq. (5.2i)
200
2 0 2 2
Ap,N [mm ] Ap,N [mm ] t Rk,ucr,25 [N/mm ] scr,Np [mm] ccr,Np [mm] cmin [mm]
324,463 138,240 18.00 371.8 185.9 ∞
0
yc t Rk,cr [N/mm ]
2
k y g,Np y g,Np
1.000 11.00 2.300 1.093 1.025
Group anchor ID
1-4
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
4
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 5
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
N
NSd £ NRd,c = Rk,c EOTA TR 029, Table 5.2.2.1
gM,c
0 Ac,N
NRk,c = NRk,c · 0
· y s,N · y re,N · y ec1,N · y ec2,N EOTA TR 029, Eq. (5.3)
Ac,N
0 1,5
NRk,c = k1 · √fck,cube · hef EOTA TR 029, Eq. (5.3a)
0
Ac,N = scr,N · scr,N EOTA TR 029, Eq. (5.3b)
c
y s,N = 0.7 + 0.3 · 1.00 EOTA TR 029, Eq. (5.3c)
ccr,N £
hef
y re,N = 0.5 + 1.00 EOTA TR 029, Eq. (5.3d)
200 £
1
y ec1,N = 1.00 EOTA TR 029, Eq. (5.3e)
2 · ec1,N £
1+
scr,N
1
y ec2,N = 1.00 EOTA TR 029, Eq. (5.3e)
2 · ec2,N £
1+
scr,N
2 0 2
Ac,N [mm ] Ac,N [mm ] ccr,N [mm] scr,N [mm]
420,000 202,500 225.0 450.0
Group anchor ID
1-4
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
5
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 6
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
V
VSd £ VRd,s = Rk,s EOTA TR 029, Table 5.2.3.1
gM,s
V
VSd £ VRd,cp = Rk,cp EOTA TR 029, Table 5.2.3.1
gM,c,p
VRk,cp = k · min (NRk,p; NRk,c) EOTA TR 029, Eq. (5.7), (5.7a)
0 A
NRk,c = NRk,c · 0c,N · y s,N · y re,N · y ec1,N · y ec2,N EOTA TR 029, Eq. (5.3)
Ac,N
0 1,5
NRk,c = k1 · √fck,cube · hef EOTA TR 029, Eq. (5.3a)
0
Ac,N = scr,N · scr,N EOTA TR 029, Eq. (5.3b)
c
y s,N = 0.7 + 0.3 · 1.00 EOTA TR 029, Eq. (5.3c)
ccr,N £
hef
y re,N = 0.5 + 1.00 EOTA TR 029, Eq. (5.3d)
200 £
1
y ec1,N = 1.00 EOTA TR 029, Eq. (5.3e)
2 · ec1,V £
1+
scr,N
1
y ec2,N = 1.00 EOTA TR 029, Eq. (5.3e)
2 · ec2,V £
1+
scr,N
2 0 2
Ac,N [mm ] Ac,N [mm ] ccr,N [mm] scr,N [mm] k-factor k1
420,000 202,500 225.0 450.0 2.000 7.200
Group anchor ID
1-4
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
6
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 7
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
1.5 Combined tension and shear loads (EOTA TR 029, Section 5.2.4)
a a
bN + bV £ 1.0
1.6 Warnings
• The anchor design methods in PROFIS Engineering require rigid anchor plates as per current regulations (ETAG 001/Annex C, EOTA
TR029, etc.). This means load re-distribution on the anchors due to elastic deformations of the anchor plate are not considered - the anchor
plate is assumed to be sufficiently stiff, in order not to be deformed when subjected to the design loading. PROFIS Engineering calculates
the minimum required anchor plate thickness with CBFEM to limit the stress of the anchor plate based on the assumptions explained above.
The proof if the rigid base plate assumption is valid is not carried out by PROFIS Engineering. Input data and results must be checked for
agreement with the existing conditions and for plausibility!
• Checking the transfer of loads into the base material is required in accordance with EOTA TR 029, Section 7!
• The design is only valid if the clearance hole in the fixture is not larger than the value given in Table 4.1 of EOTA TR029! For larger
diameters of the clearance hole see Chapter 1.1. of EOTA TR029!
• The accessory list in this report is for the information of the user only. In any case, the instructions for use provided with the product have to
be followed to ensure a proper installation.
• Characteristic bond resistances depend on short- and long-term temperatures.
• Edge reinforcement is not required to avoid splitting failure
• The anchor design methods in PROFIS Engineering require rigid anchor plates, as per current regulations (AS 5216:2021, ETAG 001/Annex
C, EOTA TR029 etc.). This means that the anchor plate should be sufficiently rigid to prevent load re-distribution to the anchors due to
elastic/plastic displacements. The user accepts that the anchor plate is considered close to rigid by engineering judgment."
• The characteristic bond resistances depend on the return period (service life in years): 50
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
7
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 8
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
Hilti HAS-U threaded rod with HIT-RE 500 V4 injection mortar with 150 mm embedment h_ef, M12, Steel galvanized, Hammer drilled
installation per ETA 20/0541
y
175.0 175.0
50.0
3 4
125.0
150.0
x
125.0
1 2
50.0
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
8
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 9
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
2.2 Summary
Description Profile Anchor plate Concrete [%]
sEd [N/mm²] ePl [%] sEd [N/mm²] ePl [%] Hole bearing [%]
1 Combination 1 241.24 2.97 239.05 1.93 3 284
2.3 Anchor plate classification
Results below are displayed for the decisive load combinations: Combination 1
Anchor tension forces Equivalent rigid anchor plate (CBFEM) Component-based Finite Element Method
(CBFEM) anchor plate design
Anchor 1 5.871 kN 20.411 kN
Anchor 2 0.000 kN 0.634 kN
Anchor 3 5.871 kN 20.414 kN
Anchor 4 0.000 kN 0.635 kN
User accepted to consider the selected anchor plate as rigid by his/her engineering judgement. This means the anchor design guidelines can
be applied.
2.4 Profile/Stiffeners/Plate
Profile and stiffeners are verified at the level of the steel to concrete connection. The connection design does not replace the steel design for
critical cross sections, which should be performed outside of PROFIS Engineering.
Results
Part Load Material sEd [N/mm²] ePl [%] fy [N/mm²] gM0 fy/gM0 elim [%] Status
combination [N/mm²]
Plate Combination S 235 239.05 1.93 235.00 1.00 235.00 5.00 OK
1
Profile Combination S 235 241.24 2.97 235.00 1.00 235.00 5.00 OK
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
9
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 10
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
Part Load Material sEd [N/mm²] ePl [%] fy [N/mm²] gM0 fy/gM0 elim [%] Status
combination [N/mm²]
1
Profile Combination S 235 238.83 1.82 235.00 1.00 235.00 5.00 OK
1
Profile Combination S 235 237.23 1.06 235.00 1.00 235.00 5.00 OK
1
Profile Combination S 235 237.23 1.06 235.00 1.00 235.00 5.00 OK
1
235.00 N/mm²
0.00 N/mm²
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
10
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 11
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
5.00%
0.00%
2.4.2 Hole bearing
Decisive load combination: 1 - Combination 1
Plate hole bearing resistance, EN1993-1 - 8 section 3.6.1:
Equations
k1 ab fu d t
Fb,Rd =
gM2
VEd
Utilization =
Fb,Rd
Variables
k1 ab fu [N/mm²] d [mm] t [mm] gM2
Anchor 1 2.50 1.00 360.00 12.0 8.0 1.25
Anchor 2 2.50 1.00 360.00 12.0 8.0 1.25
Anchor 3 2.50 1.00 360.00 12.0 8.0 1.25
Anchor 4 2.50 1.00 360.00 12.0 8.0 1.25
Results
VEd [kN] Fb,Rd [kN] Utilization [%] Status
Anchor 1 1.531 69.120 3 OK
Anchor 2 1.421 69.120 3 OK
Anchor 3 1.531 69.120 3 OK
Anchor 4 1.421 69.120 3 OK
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
11
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 12
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
2.5 Concrete
Decisive load combination: 1 - Combination 1
According to EN1992-1-1 section 6.7(4), the concrete should have sufficient reinforcement to take into account the tensile forces that develop
due to the fixture attachment. The definition of the reinforcement in the concrete is out of scope of PROFIS Engineering.
0.00 N/mm²
2.5.2 Verification of compression in concrete under the anchor plate around the profile as per EN1992-1 section 6.7 and EN1993-1-8,
section 6.2.5
Equations
fjd
bj kj acc fck
=
gc
N
s = A
eff
Utilization =
s
fjd
Variables
N [kN] Aeff [mm²] bj kj acc fck [N/mm²] gc
55.640 862 0.67 3.00 0.85 20.00 1.50
Results
s [N/mm²] fjd [N/mm²] Utilization [%] Status
64.51 22.78 284 NOT OK
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
12
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 13
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
2.7 Warnings
● By using the CBFEM calculation functionality of PROFIS Engineering you may act outside the applicable design codes and your specified
anchor plate may not behave rigid. Please, validate the results with a professional designer and/or structural engineer to ensure suitability
and adequacy for your specific jurisdiction and project requirements.
● The anchor is modeled considering stiffness values determined from load displacement curves tested in an independent laboratory.
Please note that no simple replacement of the anchor is possible as the anchor stiffness has a major impact on the load distribution
results.
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
13
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 14
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
3 Summary of results
Design of the anchor plate, anchor, welds and other elements are based on CBFEM (component based finite element method) and Eurocode
regulations.
Load combination Max. utilization Status
Anchors Combination 1 73% OK
Anchor plate Combination 1 100% OK
Concrete Combination 1 284% NOT OK
Profile Combination 1 100% OK
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
14
Hilti PROFIS Engineering 3.0.94
www.hilti.group/content/hilti/CP/XX/en/non-transactional/light-pages/malaysia.html
Company: Page: 15
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - May 3, 2024 Date: 3/05/2024
Fastening point:
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2024 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
15