Analisa Data

A. Debit Pada Saluran Tersier

NFR = 1.67 l/dt. Ha


Eff = 0.8
C = 1

C x NFR x A
Q =
Eff

1 x 1.67 x 78 163
QR2ka = = 162.83 l/dt
0.8

1 x 1.67 x 100 209


QR2ki = = 208.75 l/dt
0.8

1 x 1.67 x 69 144
QR1ka = = 144.04 l/dt
0.8

1 x 1.67 x 55 115
QR1ki = = 114.81 l/dt
0.8

1 x 1.67 x 75 157
QP1ka = = 156.56 l/dt
0.8

1 x 1.67 x 100 209


QP1ki = = 208.75 l/dt
0.8

1 x 1.67 x 75 157
QT2ka = = 156.56 l/dt
0.8

1 x 1.67 x 100 209


QT2ki = = 208.75 l/dt
0.8

1 x 1.67 x 95 198
QT1ka = = 198.31 l/dt
0.8

1 x 1.67 x 85 177
QT1ki = = 177.44 l/dt
0.8

1 x 1.67 x 100 209


QP2ki = = 208.75 l/dt
0.8
1 x 1.67 x 98 205
QP3ka = = 204.58 l/dt
0.8

1 x 1.67 x 100 209


QP3ki = = 208.75 l/dt
0.8

B. Debit Pada Saluran Sekunder

NFR = 1.67 l/dt. Ha


Eff = 0.9
Eff = 0.8
C = 1

C x NFR x A
Q =
Eff
PERHITUNGAN RR2

ARR2 = AR2Ka+AR2ki
= 78 + 100 = 178.00 Ha

QR2ka+QR2Ki
QRR2 =
Eff

= 162.83 + 208.75 = 412.86 l/dt 0.41286


0.9

atau

C x NFR
QRR2 = x AR2Ka+AR2ki
Eff

QRR2 = 1 x 1.67 x 178.00 = 412.86 l/dt 0.41286


0.72

PERHITUNGAN RR1

ARR1 = AR1Ka+AR1ki+AR2Ka+AR2Ki
= 69+55+78+100 = 302 Ha

QR1ka+QR1Ki
QRR1 = + QRB2
Eff

QRR1 = 144.04 + 114.81 + 412.86 = 700.472 l/dt 0.70047


0.90
atau

C x NFR
QRR1 = x AR1Ka+AR1ki+AR2Ka+AR2Ki
Eff

= 1 x 1.67
QRR1 x 302 = 700.47 l/dt
0.72

PERHITUNGAN RT2

ART2 = AT2Ka+AT2ki
= 75 + 100 = 175 Ha

QT2ka+QT2Ki
QRT2 =
Eff

= 156.56 + 208.75 = 405.90 l/dt 0.40590


0.90

atau

C x NFR
QRT2 = x AT2Ka+AT2ki
Eff

QRT2 = 1 x 1.67 x 175 = 405.90 l/dt 0.40590


0.72

PERHITUNGAN RT1

ART1 = AT1Ka+AT1ki+AT2Ka+AT2Ki
= 95+85+75+100 = 355 Ha

QT1ka+QT1Ki
QRT1 = + QRT2
Eff

QRT1 = 198.31 + 177.44 + 405.90 = 823.40 l/dt 0.82


0.90

atau

C x NFR
QRT1 = x AT1Ka+AT1ki+AT2Ka+AT2Ki
Eff

1.00 x 1.67
QRT1 = x 355.00 = 823.40 l/dt
0.72
PERHITUNGAN RW3

ARW3 = APW3Ka + APW3Ki


= 98+100 = 198.00 Ha

QPW3Ka+QPW3Ki
QRW3 =
Eff

QRW3 = 204.58 + 208.75 = 459.25 l/dt 0.46 m3/dt


0.90

atau

C x NFR
QRW3 = x AP3Ka + AP3Ki
Eff

QRW3 1.00 x 1.67 x 198.00 = 459.25 l/dt 0.46


= 0.72
C. Debit Pada Saluran Primer

NFR = 1.67
Eff = 0.90
Eff = 0.90
Eff = 0.80 0.65
C = 1.00

PERHITUNGAN RPW2

Q RT1 + QPW2Ki +QRW3


QRW2 =
Eff

823.40 + 208.75 + 459.25


QRW2 = = 1657.11 l/dt
0.90

atau

C x NFR C x NFR
QRW3 = x ARW3+ART + x APW2ki
Eff pr x se x te Eff pr xte

1.00 x 1.67 1.00 x 1.67


QRW3 x 553.00 +
= 0.648 0.720
= 1425.170 + 231.944
= 1657.114 l/dt
PERHITUNGAN RPW1

Q RR1 + QPW1Ki+QPW1Ka
QRW1 = + QRW2
Eff

700.47 + 208.75 + 156.56


QRW1 = + 1657.11 = 2841.32
0.900
atau
atau

C x NFR C x NFR
QRW3 = x ARPW2+ARR + x APW1 ka +APW1 ki
Eff pr x se x te Eff pr xte

1.00 x 1.67 1.00 x 1.67


QRW3 x 855.00 +
= 0.648 0.720
= 2203.472 + 637.847
= 2841.32 l/dt
163
209
144
115
157
209
157
209
198
177
209
205
209
0.41286 m3/dt

0.41286 m3/dt

0.70047 m3/dt
0.40590 m3/dt

0.40590 m3/dt

0.82 m3/dt
0.46 m3/dt

x 100.00

231.944
l/dt

x 275.00

637.847
P1 Ka P1 Ki
75 Ha 157 l/dt 100 Ha 209 l/dt

R1 Ka R1 Ki T1 ka
69 Ha 144 l/dt 55 Ha 115 l/dt 95 Ha 198 l/dt

R2 Ka R2 Ki T2 ka
78 HA 163 l/dt 100 Ha 209 l/dt 75 Ha 209 l/dt
P2 Ki P3 Ka P3 Ki
100 Ha 209 l/dt 98 Ha 205 l/dt 100 Ha 209 l/dt

T1 ki
85 Ha 177 l/dt

T2 ki
100 Ha 209 l/dt
I. Menghitung Dimensi Saluran Primer
Ruas : RPW2 1657.114
Q = 1.65711 m3/det
k = 40 ( Tabel 2.2)
m = 1.5 ( Tabel 2.2)
h
m n = 1.85 ( Tabel 2.2)
I = 0.001 (Rencana)
b
Q n
b b = 1.573 1.6571 1.85
n =
h 1.5 1.80
V = k R 2/3
I 1/2
3 2.30
a. h = ho = 0.850 m
1/2
b. h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.85 1.85 + 1.5 2/3
Vo = 40 0.001
1.85 + 2 1+ 1.5 2 1/2

1/2
2.848 2/3
= 40 0.001
5.456
= 0.820 m/det
c. Q
Ao =
Vo
1.657
=
0.820
= 2.021 m2
1/2
d. AO
h1 =
n + m
1/2
2.021
=
1.85 + 1.5
= 0.777 m

e. h1 - ho < 0.005 Maka h = hrencana


0.777 - 0.850 < 0.005
-0.073 < 0.005 NO

ho VO AO h1 h1- ho Ket.
0.850 0.820 2.021 0.777 -0.073 > 0,005 NO
0.777 0.772 2.146 0.800 0.024 > 0,005 NO
0.800 0.788 2.104 0.792 -0.008 > 0,005 NO
0.792 0.783 2.118 0.795 0.003 < 0,005 OK
0.795 0.784 2.113 0.794 -0.001 < 0,005 OK

Tinggi Jagaan
Q = 1.6571 m3/det Dari Tabel 2.5 W = 2m
Lebar dasar
b = n x h
= 1.85 x 0.795 = 1.471 m
Dari Tabel 2.4
F = 0.6 m
A = b x h + m h 2

= 1.471 x 0.795 + 1.5 0.795 2

= 2.118 m2
P = b + 2h 1+ m 2 1/2

= 1.471 + 2 0.795 1 + 1.5 2 1/2

= 4.338 m
A
R =
P
2.118
=
4.338
= 0.488 m
V = k R 2/3
I 1/2

= 40 0.488 2/3
0.001 1/2

= 0.784
Q = A x V
= 2.118 x 0.784 = 1.660809 m3/det
II. Menghitung Dimensi Saluran Sekunder
Ruas : RR2 412.861
Q = 0.413 m3/det
k = 35 (Tabel 2.2)
m = 1 (Tabel 2.2)
h
m n = 1.11 (Tabel 2.2)
I = 0.00150 ( Rencana)
b
Q n
b b = 0.668 0.4129 1.11
n =
h 0.3 1.00
V = k R 2/3
I 1/2
0.5 1.20
a. h = ho = 0.600 m
1/2
b. h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.6 1.11 + 1 2/3
Vo = 35 0.0015
1.1129 + 2 1+ 12 1/2

1/2
1.268 2/3
= 35 0.0015
3.941
= 0.636 m/det
c. Q
Ao =
Vo
0.413
=
0.636
= 0.649 m2
1/2
d. AO
h1 =
n + m
1/2
0.649
=
1.11 + 1
= 0.554 m

e. h1 - ho < 0.005 Maka h = hrencana


0.554 - 0.600 < 0.005
-0.046 < 0.005 NO

ho VO AO h1 h1- ho Ket.
0.600 0.636 0.649 0.554 -0.046 > 0,005 NO
0.554 0.604 0.684 0.569 0.015 > 0,005 NO
0.569 0.614 0.672 0.564 -0.005 > 0,005 NO
0.564 0.611 0.676 0.566 0.002 < 0,005 OK
0.566 0.612 0.675 0.565 -0.001 < 0,005 OK

Tinggi Jagaan
Q = 0.413 m3/det Dari Tabel 2.5 W = 1m
Lebar dasar
b = n x h
= 1.11 x 0.566 = 0.630 m
Dari Tabel 2.4
F = 0.40 m
A = b x h + m h 2

= 0.630 x 0.566 + 1 0.566 2

= 0.676 m2
P = b + 2h 1+ m 2 1/2

= 0.630 + 2 0.566 1 + 1 2 1/2

= 2.229 m
A
R =
P
0.676
=
2.229
= 0.303 m
V = k R 2/3
I 1/2

= 35 0.303 2/3
0.0015 1/2

= 0.612
Q = A x V
= 0.676 x 0.612 = 0.414 m3/det
Ruas : RT1 823.403 l/dt
Q = 0.823 m3/det
k = 35 (Tabel 2.2)
m = 1 (Tabel 2.2)
h
m n = 1.36 (Tabel 2.2)
I = 0.00200 ( Rencana)
b
Q n
b 0.8234 1.36
n =
h 0.75 1.30
V = k R 2/3
I 1/2
1 1.50
h = ho = 0.800 m
1/2
h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.8 1.36 + 1 2/3
Vo = 35 0.0020
1.36 + 2 1+ 1 2 1/2

1/2
1.888 2/3
= 35 0.0020
4.188
= 0.920 m/det
Q
Ao =
Vo
0.823
=
0.920
= 0.895 m2
1/2
AO
h1 =
n + m
1/2
0.895
=
1.36 + 1
= 0.616 m

h1 - ho < 0.005 Maka h = hrencana


0.616 - 0.800 < 0.005
-0.184 < 0.005 NO

ho VO AO h1 h1- ho Ket.
0.650 0.801 1.028 0.660 0.010 > 0,005 NO
0.660 0.809 1.017 0.657 -0.003 < 0,005 OK
0.657 0.807 1.021 0.658 0.001 < 0,005 OK

Tinggi Jagaan
Q = 0.823 m3/det Dari Tabel 2.5 W = 1m
Lebar dasar
b = n x h
= 1.36 x 0.658 = 0.894 m
Dari Tabel 2.4
F = 0.40 m
A = b x h + m h 2

= 0.894 x 0.658 + 1 0.658 2

= 1.021 m2
P = b + 2h 1+ m 2 1/2

= 0.894 + 2 0.658 1 + 1 2 1/2

= 2.755 m
A
R =
P
1.021
=
2.755
= 0.371 m
V = k R 2/3
I 1/2

= 35 0.371 2/3
0.0020 1/2

= 0.808
Q = A x V
= 1.021 x 0.808 = 0.824 m3/det
Ruas : RPW1
Q = 2.841 m3/det Q n
k = 40 2.8413 2.25
m = 1.5 1.5 1.80
h
m n = 2.25 3 2.30
I = 0.001
b

b b = 2.25
n =
h
V = k R 2/3
I 1/2

a. h = ho = 1.0000 m
1/2
b. h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
1 2.25 + 1.5 2/3
Vo = 40 0.001
2.25 + 2 1+ 1.5 2 1/2

1/2
3.750 2/3
= 40 0.001
5.856
= 0.940 m/det
c. Q
Ao =
Vo
2.841
=
0.940
= 3.023 m2
1/2
d. AO
h1 =
n + m
1/2
3.023
=
2.25 + 1.5
= 0.898 m

e. h1 - ho < 0.005 Maka h = hrencana


0.898 - 1.000 < 0.005
-0.102 < 0.005 NO

ho VO AO h1 h1- ho Ket.
1.000 0.940 3.023 0.898 -0.102 > 0,005 NO
0.898 0.875 3.248 0.931 0.033 > 0,005 NO
0.931 0.896 3.172 0.920 -0.011 > 0,005 NO
0.920 0.889 3.197 0.923 0.004 < 0,005 OK
0.923 0.891 3.188 0.922 -0.001 < 0,005 OK

Lebar dasar
b = n x h Dari Tabel 2.5 W = 2m
= 2.250 x 0.923 = 2.077 m
Tinggi Jagaan
Q = 2.8413 m3/det
Dari Tabel 2.4
F = 0.6 m
A = b x h + m h 2

= 2.077 x 0.923 + 1.5 0.923 2

= 3.197 m2
P = b + 2h 1+ m 2 1/2

= 2.077 + 2 0.923 1 + 1.5 2 1/2

= 5.407 m
A
R =
P
3.197
=
5.407
= 0.591 m
V = k R 2/3
I 1/2

= 40 0.591 2/3
0.001 1/2

= 0.891
Q = A x V
= 3.197 x 0.891 = 2.8489 m3/det
Ruas : RR1 700.472
Q = 0.700 m3/det Q n
k = 35 (Tabel 2.2) 0.7005 1.28
m = 1 (Tabel 2.2) 0.5 1.20
h
m n = 1.28 (Tabel 2.2) 0.75 1.30
I = 0.00150 ( Rencana)
b

b
n =
h
V = k R 2/3
I 1/2

a. h = ho = 0.750 m
1/2
b. h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.75 1.28 + 1 2/3
Vo = 35 0.0015
1.28 + 2 1+ 12 1/2

1/2
1.71 2/3
= 35 0.0015
4.10842712474619
= 0.756 m/det
c. Q
Ao =
Vo
0.700
=
0.756
= 0.927 m2
1/2
d. AO
h1 =
n + m
1/2
0.9270
=
1.28 + 1
= 0.638 m

e. h1 - ho < 0.005 Maka h = hrencana


0.638 - 0.750 < 0.005
-0.112 < 0.005 NO

ho VO AO h1 h1- ho Ket.
0.750 0.756 0.927 0.638 -0.112 > 0,005 NO
0.638 0.678 1.033 0.673 0.035 > 0,005 NO
0.673 0.703 0.996 0.661 -0.012 > 0,005 NO
0.661 0.695 1.008 0.665 0.004 < 0,005 OK
0.665 0.697 1.004 0.664 -0.001 < 0,005 OK

Lebar dasar
b = n x h Dari Tabel 2.5 W = 1m
= 1.280 x 0.665 = 0.851 m
Tinggi Jagaan
Q = 0.700 m3/det
Dari Tabel 2.4
F = 0.50 m
A = b x h + m h 2

= 0.851 x 0.665 + 1 0.665 2

= 1.008 m2
P = b + 2h 1+ m 2 1/2

= 0.851 + 2 0.665 1 + 1 2 1/2

= 2.732 m
A
R =
P
1.008
=
2.732
= 0.369 m
V = k R 2/3
I 1/2

= 35 0.369 2/3
0.0015 1/2

= 0.697
Q = A x V
= 1.008 x 0.697 = 0.703 m3/det
Ruas : RT2 405.903 l/dt
Q = 0.406 m3/det Q n
k = 35 (Tabel 2.2) 0.4059 1.25
m = 1 (Tabel 2.2) 0.3 1.20
h
m n = 1.25 (Tabel 2.2) 0.5 1.30
I = 0.00200 ( Rencana)
b

b
n =
h
V = k R 2/3
I 1/2

a. h = ho = 0.625 m
1/2
b. h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.625 1.25 + 1 2/3
Vo = 35 0.0020
1.25 + 2 1+ 1 2 1/2

1/2
1.40625 2/3
= 35 0.0020
4.07842712474619
= 0.770 m/det
c. Q
Ao =
Vo
0.406
=
0.770
= 0.527 m2
1/2
d. AO
h1 =
n + m
1/2
0.527
=
1.25 + 1
= 0.484 m

e. h1 - ho < 0.005 Maka h = hrencana


0.484 - 0.625 < 0.005
-0.141 < 0.005 NO

ho VO AO h1 h1- ho Ket.
0.625 0.770 0.527 0.484 -0.141 > 0,005 NO
0.484 0.649 0.625 0.527 0.043 > 0,005 NO
0.527 0.687 0.591 0.512 -0.015 > 0,005 NO
0.512 0.674 0.602 0.517 0.005 < 0,005 OK
0.517 0.678 0.598 0.516 -0.002 < 0,005 OK

Lebar dasar
b = n x h Dari Tabel 2.5 W = 1m
= 1.250 x 0.517 = 0.647 m
Tinggi Jagaan
Q = 0.406 m3/det
Dari Tabel 2.4
F = 0.50 m
A = b x h + m h 2

= 0.647 x 0.517 + 1 0.517 2

= 0.602 m2
P = b + 2h 1+ m 2 1/2

= 0.647 + 2 0.517 1 + 1 2 1/2

= 2.110 m
A
R =
P
0.602
=
2.110
= 0.285 m
V = k R 2/3
I 1/2

= 35 0.285 2/3
0.0020 1/2

= 0.678
Q = A x V
= 0.602 x 0.678 = 0.408 m3/det
Ruas : RW3 459.250 l/dt
Q = 0.459 m3/det Q n
k = 35 (Tabel 2.2) 0.4593 1.28
m = 1 (Tabel 2.2) 0.3 1.20
h
m n = 1.28 (Tabel 2.2) 0.5 1.30
I = 0.0010 ( Rencana)
b

b
n =
h
V = k R 2/3
I 1/2

a. h = ho = 0.600 m
1/2
b. h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.6 1.28 + 1 2/3
Vo = 35 0.0010
1.28 + 2 1+ 1 2 1/2

1/2
1.368 2/3
= 35 0.0010
4.10842712474619
= 0.532 m/det
c. Q
Ao =
Vo
0.459
=
0.532
= 0.864 m2
1/2
d. AO
h1 =
n + m
1/2
0.864
=
1.28 + 1
= 0.615 m

e. h1 - ho < 0.005 Maka h = hrencana


0.615 - 0.600 < 0.005
0.015 < 0.005 NO

ho VO AO h1 h1- ho Ket.
0.600 0.532 0.864 0.615 0.015 > 0,005 NO
0.615 0.541 0.849 0.610 -0.005 > 0,005 NO
0.610 0.538 0.854 0.612 0.002 < 0,005 OK
0.612 0.539 0.852 0.611 -0.001 < 0,005 OK

Lebar dasar
b = n x h Dari Tabel 2.5 W = 1m
= 1.280 x 0.612 = 0.783 m
Tinggi Jagaan
Q = 0.459 m3/det
Dari Tabel 2.4
F = 0.50 m
A = b x h + m h 2

= 0.783 x 0.612 + 1 0.612 2

= 0.854 m2
P = b + 2h 1+ m 2 1/2

= 0.783 + 2 0.612 1 + 1 2 1/2

= 2.514 m
A
R =
P
0.854
=
2.514
= 0.340 m
V = k R 2/3
I 1/2

= 35 0.340 2/3 0.0010 1/2

= 0.539
Q = A x V
= 0.854 x 0.539 = 0.460 m3/det
III. MENGHITUNG DIMENSI SALURAN TERISER
Ruas : (T2 - T3)
A(F3) = 9 ha
NFR = 1.67 l/dt.ha
Q = 15.03 l/dt = 0.015 m3/dt
k = 35 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.00050 ( Rencana)

b = h = 0.205

V = k R 2/3
I 1/2

a. h = ho = 0.205 m
1/2
b. h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.205 1.00 + 1 2/3
Vo = 35 0.0005
1.00 + 2 1+ 12 1/2

1/2
0.410 2/3
= 35 0.0005
3.828
= 0.176 m/det
c. Q
Ao =
Vo
0.015
=
0.176
= 0.085 m2
1/2
d. AO
h1 =
n + m
1/2
0.085
=
1.00 + 1
= 0.206 m

e. h1 - ho < 0.005 Maka h = hrencana


0.206 - 0.205 < 0.005
0.001 < 0.005 OK

ho VO AO h1 h1 - h o Ket.
0.205 0.176 0.085 0.206 0.001 < 0,005 OK
0.206 0.177 0.085 0.206 0.000 < 0,005 OK
0.206 0.177 0.085 0.206 0.000 < 0,005 OK

Tinggi Jagaan
Q = 15.03 m3/det
Lebar dasar
b = n x h
= 1.00 x 0.206 = 0.206 m
A = b x h + m h 2

= 0.206 x 0.206 + 1 0.206 2

= 0.085 m2
P = b + 2h 1+ m 2 1/2

= 0.206 + 2 0.206 1 + 1 2 1/2

= 0.788 m
A
R =
P 0.125
0.085
=
0.788
= 0.108 m
V = k R 2/3
I 1/2

= 35 0.108 2/3
0.0005 1/2

= 0.177
Q = A x V
= 0.085 x 0.177 = 0.015 m3/det = 15.01 l/dt
Ruas : (T1 - T2)
A = 28 ha
NFR = 1.67 l/dt.ha
Q = 46.76 l/dt = 0.047 m3/dt
k = 35 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.00050 ( Rencana)

b = h = 0.315

V = k R 2/3
I 1/2

h = ho = 0.315 m
1/2
h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.315 1.00 + 1 2/3
Vo = 35 0.0005
1.00 + 2 1+ 12 1/2

1/2
0.630 2/3
= 35 0.0005
3.828
= 0.235 m/det
Q
Ao =
Vo
0.047
=
0.235
= 0.199 m2
1/2
AO
h1 =
n + m
1/2
0.199
=
1.00 + 1
= 0.315 m

h1 - ho < 0.005 Maka h = hrencana


0.3154 - 0.3150 < 0.005
0.0004 < 0.005 OK

ho VO AO h1 h1 - h o Ket.
0.3150 0.2350 0.1990 0.3154 0.0004 < 0,005 OK
0.3154 0.2352 0.1988 0.3153 -0.0001 < 0,005 OK
0.3153 0.2352 0.1988 0.3153 0.0000 < 0,005 OK

Q = 46.76 m3/det
Lebar dasar
b = n x h
= 1.00 x 0.3153 = 0.3153 m
A = b x h + m h 2

= 0.315 x 0.315 + 1 0.315 2

= 0.199 m2
P = b + 2h 1+ m 2 1/2

= 0.315 + 2 0.315 1 + 1 2 1/2

= 1.207 m
A
R =
P 0.125
0.199
=
1.207
= 0.165 m
V = k R 2/3
I 1/2

= 35 0.165 2/3
0.0005 1/2

= 0.235
Q = A x V
= 0.199 x 0.235 = 0.047 m3/det = 46.75 l/dt
Ruas : (T6 - T7)
A = 25 ha
NFR = 1.67 l/dt.ha
Q = 41.75 l/dt = 0.042 m3/dt
k = 35 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.00050 ( Rencana)

b = h = 0.300

V = k R 2/3
I 1/2

h = ho = 0.300 m
1/2
h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.3 1.00 + 1 2/3
Vo = 35 0.0005
1.00 + 2 1+ 12 1/2

1/2
0.600 2/3
= 35 0.0005
3.828
= 0.227 m/det
Q
Ao =
Vo
0.042
=
0.227
= 0.184 m2
1/2
AO
h1 =
n + m
1/2
0.184
=
1.00 + 1
= 0.303 m

h1 - ho < 0.005 Maka h = hrencana


0.303 - 0.300 < 0.005
0.003 < 0.005 OK

ho VO AO h1 h1 - h o Ket.
0.300 0.227 0.184 0.303 0.003 < 0,005 OK
0.303 0.229 0.182 0.302 -0.001 < 0,005 OK
0.302 0.228 0.183 0.302 0.000 < 0,005 OK

Q = 41.75 m3/det
Lebar dasar
b = n x h
= 1.00 x 0.302 = 0.3019 m
A = b x h + m h 2

= 0.302 x 0.302 + 1 0.302 2

= 0.182 m2
P = b + 2h 1+ m 2 1/2

= 0.302 + 2 0.302 1 + 1 2 1/2

= 1.156 m
A
R =
P 0.125
0.182
=
1.156
= 0.158 m
V = k R 2/3
I 1/2

= 35 0.158 2/3
0.0005 1/2

= 0.228
Q = A x V
= 0.182 x 0.228 = 0.042 m3/det = 41.66 l/dt
Ruas : (T5 - T6)
A = 39 ha
NFR = 1.67 l/dt.ha
Q = 65.13 l/dt = 0.065 m3/dt
k = 35 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.00050 ( Rencana)

b = h = 0.355

V = k R 2/3
I 1/2

h = ho = 0.355 m
1/2
h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.355 1.00 + 1 2/3
Vo = 35 0.0005
1.00 + 2 1+ 12 1/2

1/2
0.710 2/3
= 35 0.0005
3.828
= 0.255 m/det
Q
Ao =
Vo
0.065
=
0.255
= 0.256 m2
1/2
AO
h1 =
n + m
1/2
0.256
=
1.00 + 1
= 0.358 m

h1 - ho < 0.005 Maka h = hrencana


0.358 - 0.355 < 0.005
0.003 < 0.005 OK

ho VO AO h1 h1 - h o Ket.
0.355 0.255 0.256 0.358 0.003 < 0,005 OK
0.358 0.256 0.255 0.357 -0.001 < 0,005 OK
0.357 0.255 0.255 0.357 0.000 < 0,005 OK

Q = 65.13 m3/det
Lebar dasar
b = n x h
= 1.00 x 0.357 = 0.357 m
A = b x h + m h 2

= 0.357 x 0.357 + 1 0.357 2

= 0.255 m2
P = b + 2h 1+ m 2 1/2

= 0.357 + 2 0.357 1 + 1 2 1/2

= 1.366 m
A
R =
P
0.255
=
1.366
= 0.186 m
V = k R 2/3
I 1/2

= 35 0.186 2/3
0.0005 1/2

= 0.255
Q = A x V
= 0.255 x 0.255 = 0.065 m3/det = 65.02 l/dt
Ruas : (T4 - T5)
A = 51 ha
NFR = 1.67 l/dt.ha
Q = 85.17 l/dt = 0.085 m3/dt
k = 35 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.00050 ( Rencana)

b = h = 0.395

V = k R 2/3
I 1/2

h = ho = 0.395 m
1/2
h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.395 1.00 + 1 2/3
Vo = 35 0.0005
1.00 + 2 1+ 12 1/2

1/2
0.790 2/3
= 35 0.0005
3.828
= 0.273 m/det
Q
Ao =
Vo
0.085
=
0.273
= 0.312 m2
1/2
AO
h1 =
n + m
1/2
0.312
=
1.00 + 1
= 0.395 m

h1 - ho < 0.005 Maka h = hrencana


0.395 - 0.395 < 0.005
0.000 < 0.005 OK

ho VO AO h1 h1 - h o Ket.
0.395 0.273 0.312 0.395 0.000 < 0,005 OK
0.395 0.273 0.312 0.395 0.000 < 0,005 OK
0.395 0.273 0.312 0.395 0.000 < 0,005 OK

Q = 85.17 m3/det
Lebar dasar
b = n x h
= 1.00 x 0.395 = 0.395 m
A = b x h + m h 2

= 0.395 x 0.395 + 1 0.395 2

= 0.312 m2
P = b + 2h 1+ m 2 1/2

= 0.395 + 2 0.395 1 + 1 2 1/2

= 1.511 m
A
R =
P
0.312
=
1.511
= 0.206 m
V = k R 2/3
I 1/2

= 35 0.206 2/3
0.0005 1/2

= 0.273
Q = A x V
= 0.312 x 0.273 = 0.085 m3/det = 85.13 l/dt
Ruas : (T1 - T4)
A = 70 ha
NFR = 1.67 l/dt.ha
Q = 116.90 l/dt = 0.117 m3/dt
k = 35 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.00050 ( Rencana)

b = h = 0.445

V = k R 2/3
I 1/2

h = ho = 0.445 m
1/2
h n + m 2/3
Vo = k I
n + 2 1+ m 2 1/2

1/2
0.445 1.00 + 1 2/3
Vo = 35 0.0005
1.00 + 2 1+ 12 1/2

1/2
0.890 2/3
= 35 0.0005
3.828
= 0.296 m/det
Q
Ao =
Vo
0.117
=
0.296
= 0.395 m2
1/2
AO
h1 =
n + m
1/2
0.395
=
1.00 + 1
= 0.444 m

h1 - ho < 0.005 Maka h = hrencana


0.444 - 0.445 < 0.005
-0.001 < 0.005 OK

ho VO AO h1 h1 - h o Ket.
0.445 0.296 0.395 0.444 -0.001 < 0,005 OK
0.444 0.296 0.395 0.445 0.000 < 0,005 OK
0.445 0.296 0.395 0.445 0.000 < 0,005 OK

Q = 116.90 m3/det
Lebar dasar
b = n x h
= 1.00 x 0.445 = 0.445 m
A = b x h + m h 2

= 0.445 x 0.445 + 1 0.445 2

= 0.395 m2
P = b + 2h 1+ m 2 1/2

= 0.445 + 2 0.445 1 + 1 2 1/2

= 1.702 m
A
R =
P
0.395
=
1.702
= 0.232 m
V = k R 2/3
I 1/2

= 35 0.232 2/3
0.0005 1/2

= 0.296
Q = A x V
= 0.395 x 0.296 = 0.117 m3/det = 116.93 l/dt
IV. MENGHITUNG DIMENSI SALURAN KUARTER
Saluran F1
A(F1) = 8 ha
NFR = 1.67 l/dt.ha
Q = 13.36 l/dt = 0.013 m3/dt
k = 30 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.0030 ( Rencana)
L = 100 m

bmin = 0.30 m
Q
F =
I 1/2
0.013
=
0.0030 1/2
= 0.244
h = 0.100 (Dari Tabel A.1.1)
A = b h + m h 2

= 0.30 0.1 + 1 0.1


= 0.040 m2
P = b + 2 h 1 + m 2 1/2

= 0.30 + 2 0.1 1+ 12 1/2

= 0.583 m
A
R =
P
0.040
=
0.583
= 0.069 m
V = k R 2/3
I 1/2

= 30 0.0686 0.0030 1/2


2/3

= 0.275 m/dt
Q = A x V
= 0.040 x 0.275
= 0.011 m3/dt
Q berdasarkan NFR = 0.013
ΔQ = 0.002 < 5% OK
Saluran F2
A(F2) = 11 ha
NFR = 1.67 l/dt.ha
Q = 18.37 l/dt = 0.018 m3/dt
k = 35 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.0030 ( Rencana)
L = 100 m

bmin = 0.30 m (Diluar dimensi yang diizinkan)


Q
F =
I 1/2 F3 h
0.018 0.324 0.120
=
0.0030 1/2 0.374 0.130
= 0.335 0.335 0.122
h = 0.122 (Dari Tabel A.1.1)
A = b h + m h 2

= 0.30 0.1223 + 1 0.12228


= 0.052 m2
P = b + 2 h 1 + m 2 1/2

= 0.30 + 2 0.1223 1+ 12 1/2

= 0.646 m
A
R =
P
0.052
=
0.646
= 0.080 m
V = k R 2/3
I 1/2

= 35 0.0799 2/3
0.0030 1/2
= 0.356 m/dt
Q = A x V
= 0.052 x 0.356
= 0.018 m /dt 3

Q berdasarkan NFR = 0.018


ΔQ = 0.000 < 5% OK

Saluran F3
A(F3) = 9 ha
NFR = 1.67 l/dt.ha
Q = 15.03 l/dt = 0.0150 m3/dt
k = 30 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.0030 ( Rencana)
L = 100 m

bmin = 0.30 m (Diluar dimensi yang diizinkan)


Q
F =
I 1/2 F3 h
0.015 0.233 0.100
=
0.0030 1/2 0.278 0.110
= 0.274 0.274 0.109
h = 0.109 (Dari Tabel A.1.1)
A = b h + m h 2

= 0.30 0.1092 + 1 0.1092


= 0.045 m2
P = b + 2 h 1 + m 2 1/2

= 0.30 + 2 0.1092 1+ 12 1/2

= 0.609 m
A
R =
P
0.045
=
0.609
= 0.073 m
V = k R 2/3
I 1/2

= 30 0.0734 2/3 0.0030 1/2


= 0.288 m/dt
Q = A x V
= 0.045 x 0.288
= 0.013 m3/dt
Q berdasarkan NFR = 0.0150
ΔQ = 0.002 < 5% OK

Saluran F4
A(F4) = 9 ha
NFR = 1.67 l/dt.ha
Q = 15.03 l/dt = 0.0150 m3/dt
k = 30 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.0030 ( Rencana)
L = 100 m

bmin = 0.30 m (Diluar dimensi yang diizinkan)


Q
F =
I 1/2 F3 h
0.015 0.233 0.100
=
0.0030 1/2 0.278 0.110
= 0.274 0.274 0.109
h = 0.109 (Dari Tabel A.1.1)
A = b h + m h 2

= 0.30 0.1092 + 1 0.1092


= 0.045 m2
P = b + 2 h 1 + m 2 1/2

= 0.30 + 2 0.1092 1+ 1 2 1/2

= 0.609 m
A
R =
P
0.045
=
0.609
= 0.073 m
V = k R 2/3
I 1/2

= 30 0.0734 2/3 0.0030 1/2


= 0.288 m/dt
Q = A x V
= 0.045 x 0.288
= 0.0129 m3/dt
Q berdasarkan NFR = 0.0150
ΔQ = 0.002 < 5% OK

Saluran F5
A(F5) = 10 ha
NFR = 1.67 l/dt.ha
Q = 16.70 l/dt = 0.017 m3/dt
k = 30 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.0030 ( Rencana)
L = 100 m

bmin = 0.30 m (Diluar dimensi yang diizinkan)


Q
F =
I 1/2 F3 h
0.017 0.278 0.110
=
0.0030 1/2 0.324 0.120
= 0.305 0.305 0.116
h = 0.116 (Dari Tabel A.1.1)
A = b h + m h 2

= 0.30 0.1158 + 1 0.11585


= 0.048 m2
P = b + 2 h 1 + m 2 1/2

= 0.30 + 2 0.1158 1+ 12 1/2


= 0.628 m
A
R =
P
0.048
=
0.628
= 0.077 m
V = k R 2/3
I 1/2

= 30 0.0768 2/3
0.0030 1/2
= 0.297 m/dt
Q = A x V
= 0.048 x 0.297
= 0.014 m3/dt
Q berdasarkan NFR = 0.0167
ΔQ = 0.002 < 5% OK

Saluran F6
A(F6) = 12 ha
NFR = 1.67 l/dt.ha
Q = 20.04 l/dt = 0.0200 m3/dt
k = 30 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.0030 ( Rencana)
L = 100 m

bmin = 0.30 m (Diluar dimensi yang diizinkan)


Q
F =
I 1/2 F3 h
0.020 0.324 0.110
=
0.0030 1/2 0.374 0.120
= 0.366 0.366 0.118
h = 0.118 (Dari Tabel A.1.1)
A = b h + m h 2

= 0.30 0.1184 + 1 0.11838


= 0.050 m2
P = b + 2 h 1 + m 2 1/2

= 0.30 + 2 0.1184 1+ 12 1/2

= 0.635 m
A
R =
P
0.050
=
0.635
= 0.078 m
V = k R 2/3
I 1/2

= 30 0.078 2/3
0.0030 1/2
= 0.300m/dt
Q = A x V
= 0.0495 x 0.30
= 0.0149 m /dt 3

Q berdasarkan NFR = 0.0200


ΔQ = 0.005 < 5% OK

Saluran F7
A(F7) = 14 ha
NFR = 1.67 l/dt.ha
Q = 23.38 l/dt = 0.023 m3/dt
k = 30 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.0030 ( Rencana)
L = 100 m

bmin = 0.30 m (Diluar dimensi yang diizinkan)


Q Pakai Tabel
F =
I 1/2 F3 h
0.023 0.374 0.130
=
0.0030 1/2 0.428 0.140
= 0.427 0.427 0.140
h = 0.140 m (Dari Tabel A1.1)
A = b h + m h 2

= 0.30 0.1398 + 1 0.13979


= 0.061 m2
P = b + 2 h 1 + m 2 1/2

= 0.30 + 2 0.1398 1+ 1 2 1/2

= 0.695 m
A
R =
P
0.061
=
0.695
= 0.088 m
V = k R 2/3
I 1/2

= 30 0.0884 0.0030 1/2


2/3

= 0.326 m/dt
Q = A x V
= 0.061 x 0.326
= 0.020 m3/dt
Q berdasarkan NFR = 0.023
ΔQ = 0.003 < 5% OK

Saluran F8
A(F8) = 15 ha
NFR = 1.67 l/dt.ha
Q = 25.05 l/dt = 0.0251 m3/dt
k = 30 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.0030 ( Rencana)
L = 100 m

bmin = 0.30 m (Diluar dimensi yang diizinkan)


Q Pakai Tabel
F =
I 1/2 F3 h
0.025 0.428 0.140
=
0.0030 1/2
0.486 0.150
= 0.457 0.457 0.145
h = 0.145 m (Dari Tabel A1.1)
A = b h + m h 2

= 0.30 0.1451 + 1 0.14506


= 0.065 m2
P = b + 2 h 1 + m 2 1/2

= 0.30 + 2 0.1451 1+ 1 2 1/2

= 0.710 m
A
R =
P
0.065
=
0.710
= 0.091 m
V = k R 2/3
I 1/2

= 30 0.0909 2/3
0.0030 1/2
= 0.332 m/dt
Q = A x V
= 0.065 x 0.332
= 0.0214 m3/dt
Q berdasarkan NFR = 0.0251
ΔQ = 0.004 < 5% OK

Saluran F9
A(F9) = 10 ha
NFR = 1.67 l/dt.ha
Q = 16.70 l/dt = 0.0167 m3/dt
k = 30 (Tabel 2.2)
m = 1 (Tabel 2.2)
n = 1.00 (Tabel 2.2)
I = 0.0030 ( Rencana)
L = 100 m
bmin = 0.30 m (Diluar dimensi yang diizinkan)
Q Pakai Tabel
F =
I 1/2 F3 h
0.017 0.278 0.110
=
0.0030 1/2 0.324 0.120
= 0.305 0.305 0.116
h = 0.116 m (Dari Tabel A1.1)
A = b h + m h 2

= 0.30 0.1158 + 1 0.11585


= 0.048 m2
P = b + 2 h 1 + m 2 1/2

= 0.30 + 2 0.1158 1+ 1 2 1/2

= 0.628 m
A
R =
P
0.048
=
0.628
= 0.077 m
V = k R 2/3
I 1/2

= 30 0.0768 0.0030 1/2


2/3

= 0.297 m/dt
Q = A x V
= 0.048 x 0.297
= 0.014 m3/dt
Q berdasarkan NFR = 0.017
ΔQ = 0.002 < 5% OK
PERHITUNGAN DIMENSI BANGUNAN BAGI BR1
Q = Cd 1.7 b h 3/2

1. Bangunan bagi BR 2
Untuk RR2 Ki
Q = 208.75 l/dt = 0.209 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

208.75 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.209
=
0.85 1.7 0.15 2/3

= 0.51 m
Untuk RR2 Ka
Q = 162.83 l/dt = 0.163 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

162.83 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.163
=
0.85 1.7 0.15 2/3

= 0.40 m
2. Bangunan Bagi BR1
Untuk RR1 Ka
Q = 144.04 l/dt = 0.144 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

144.04 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.144
=
0.85 1.7 0.15 2/3

= 0.35 m
Untuk RR1 Ki
Q = 114.81 l/dt = 0.115 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

114.81 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3
0.115
=
0.85 1.7 0.15 2/3

= 0.28 m
3. Bangunan bagi BW1
Untuk PW1 Ki
Q = 208.75 l/dt = 0.209 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

208.75 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.209
=
0.85 1.7 0.15 2/3

= 0.51 m
Untuk PW1 Ka
Q = 156.56 l/dt = 0.157 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

156.56 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.157
=
0.85 1.7 0.15 2/3

= 0.38 m
4. Bangunan bagi BW2
Untuk PW2 Ki
Q = 208.75 l/dt = 0.209 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

208.75 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.209
=
0.85 1.7 0.15 2/3

= 0.51 m
5. Bangunan bagi BT1
Untuk RT1 Ka
Q = 198.31 l/dt = 0.198 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

198.31 = 0.85 1.7 b 0.15 2/3

Q
b =
b =
Cd 1.7 h 2/3

0.198
=
0.85 1.7 0.15 2/3

= 0.49 m
Untuk RT1 Ki
Q = 177.44 l/dt = 0.177 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

177.44 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.177
=
0.85 1.7 0.15 2/3

= 0.43 m
6. Bangunan bagi BT2
Untuk RT2 Ka
Q = 156.56 l/dt = 0.157 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

0.157 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.157
=
0.85 1.7 0.15 2/3

= 0.38 m
Untuk RT2 Ki
Q = 208.75 l/dt = 0.209 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

0.209 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.209
=
0.85 1.7 0.15 2/3

= 0.51 m
7. Bangunan bagi BW3
Untuk RW3 Ka
Q = 204.58 l/dt = 0.205 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

0.205 = 0.85 1.7 b 0.15 2/3


Q
b =
Cd 1.7 h 2/3

0.205
=
0.85 1.7 0.15 2/3

= 0.50 m
Untuk RW3 Ki
Q = 208.75 l/dt = 0.209 m3/dt
h = 0.15 m (Kedalaman air diatas ambang)
Cd = 0.85
Q = Cd 1.7 b h 2/3

208.75 = 0.85 1.7 b 0.15 2/3

Q
b =
Cd 1.7 h 2/3

0.209
=
0.85 1.7 0.15 2/3

= 0.51 m
1.) Gorong-gorong pada Ruas RR2
Q = 0.41 m3/dt
Dari abel 5-5 dalam KP-04 Standar Perencanaan Irigsi
b = B = 1
BT = 1.4
H(h+w) = 1
HT = 1.4
t1 = 0.2
t2 = 0.2
t3 = 0.2
t4 = 0.2
Hf = 0.15
2.) Bangunan Terjun Ruas RT1
Q = 0.823 m3/dt h = 0.658 m
v = 0.808 m/dt Z = 1

Lebar Bukaan Efektif


v1
H = h1 +
2g
0.808
= 0.658 +
19.62
= 0.70 m

Q
B =
1.71 m H ^3/2
0.823402777777778
B =
1.71 1 0.70 ^3/2
= 2.82 m

Tinggi ambang di hilir

dc Q^2
=
(g.B^2)^1/3
= 0.159
a = 0.079
Panjang kolam olakan L

C1 = 2.5 + 1,1 (dc/Z) + 0,7(dc/Z)^3


= 2.677
L = C1.Z.dc+0,25
= 0.675
3.) Talang Pada RW1
Q = 2.84 m3/dt