Eirl New SR
Eirl New SR
HEAD OF ACCOUNT Head of Account : 8443 Depostie Contribution (State & Central Fund)
Net Payable
Total Rate Tender
Item SR 2022-23 Basic Lead/LI Area Rate [Total
S.No Item of Work Unit including Premium Remarks
Code PAGE NO Rate FT Weightage Rate +/- TP]
weightage 9.45%
(9+10)
1 2 3 4 5 6 7 8 9 10 11 12
Providing Steel Liner 10 mm thick for
EIRL -
12.22 Curbs and 6 mm thick for Steining of Tonne 107 106931 5346.55 112277.55 10610.23 122887.78
2 Wells including Fabricating and Setting
out as per Detailed Drawing.
Construction of dry lean cement concrete
EIRL - Sub- base over a prepared sub-grade with
6.01 cum 49 4016 200.8 4216.8 398.49 4615.29
6 coarse and fine aggregate conforming to
IS: 383, the size of coarse aggregate not
Construction of M30 grade un-reinforced,
dowel jointed, plain cement concrete
EIRL -
6.02 pavement over a prepared sub base cum 49 9391 469.55 9860.55 931.82 10792.37
7 with OPC, coarse and fine aggregate
conforming to IS 383, maximum size of
coarse aggregate
Initial Vertical Pile not exceeding 25 mm,
EIRL -
Load Test For 1000mm dia. Pile, No 108 750000 37500 787500 74418.75 861918.75
8
EIRL - Integrity testing of
Nos 110 1000 50 1050 99.23 1149.23
9 Pile
Page 1 of 1