TECHNICAL SPECIFICATION

SI. Quantity
Material Code & Description
No Required
CS010040041 : SNUB PULLEY FOR BCN 2 A/B CONVEYOR AS PER DRAWING NO:
TPS II E / LHS / PULLEY / 005/ 2022
Type of
Facto Vendor
Factor description Vendor
r No. Response
Response

Snub pulley for BCN 2 A/B conveyor as per Drawing Agreed /


1
No: TPS II E / LHS / PULLEY / 005/ 2022 Deviation Agreed

Agreed /
2 No reclaimed rubber shall be used. Agreed
Deviation

The shaft shall be ultrasonically tested for internal


Agreed /
3 defects if any and original test certificate shall be Agreed
Deviation
furnished along with the supply
The drum and shaft shall be offered for THIRD PARTY
1 INSPECTION. The material shall be dispatched after
inspection by Third Party Inspection Agency and 1 Nos
receiving Dispatch Clearance certificates from the Third Agreed /
4 Party Inspection Agency. The scope of third party Deviation Agreed
agency is as per ANNEXURE The Third Party
Inspection Agency will be arranged by NLCIL at NLCIL
cost. However final inspection will be done at NLCIL
premises.

Agreed /
5 Pulley has to be painted inside and outside Agreed
Deviation

Supplier Name and Year of Manufacturing has to be Agreed /


6 Agreed
incorporated in the pulley end disc. Deviation

Applicable IS for the given drawing


1. IS 8531 - 1986 Reaffirmed 2018, Agreed /
7 Agreed
2. IS 2102 - 1993 Reaffirmed 2019, Deviation
3. IS 2062 - 2011 Reaffirmed 2016.
1. All Dimensions are in mm
2. Pulley will be statically balanced and run concentric
when mounted on shaft.
3. Pulley shell should be stress relieved
4. Make of Spherical Roller Bearing shall be
SKF/FAG/TIMKEN
8 5. Only one longitudinal weld per pulley shall be
provided and weld to be smooth ground for fabricated
pulley shell.
6. The Out of Roundness shall not exceed +0.5% of the
diameter prior to lagging
7. Derub sharp corners of all components.
8. Gas cut surfaces shall be ground smooth
9. All weldments to be blended smooth. Agreed /
10. Pulley shaft 150mm dia & less will be made of Deviation Agreed
machined hot rolled or turned and ground cold finished
carbon steel & greater than 150mm dia will be made of
carbon steel forging.
11. Pulley shaft will have carbon content of not less than
0.35%.
12. The shaft shall be normalized.
13. Raw Material Thickness of shell to be taken more, so
that finished thickness to be maintained as given in the
table.
14. Rubber lagging shall be done by through hot
vulcanizing method.
Manufacturer Conformity Certificate is to be furnished as
per NLCIL defined format at free of cost along with each
supply stating that the bearings are supplied "as per
9 Technical supply conditions IS 6453-1984 with latest
amendment (or) equivalent International standard "as
followed by the manufacturer on the following aspects.
1. Dimensions and Tolerances with internal Clearances. Agreed /
2. Workmanship Deviation
Agreed
3. Surface finish
4. Protection against corrosion.
5. Hardness of the inner, Outer rings and rolling elements.
6. Load rating.
kindly submit the valid ADC for the makes mentioned for Agreed /
10 the Bearing along with the offer Deviation Agreed
DELIVERY PERIOD

Material Code & Description

CS010040041 : SNUB PULLEY FOR BCN 2 A/B CONVEYOR AS PER DRAWING NO:
TPS II E / LHS / PULLEY / 005/ 2022
SI Period (Days)
Delivery Type Quantity Vendor Response
NO From To

1. BULK SUPPLY 0 120 1 120 Days

Agreed for the above Technical Specification & Delivery Period

Signature of the authorized person with date:

Name : Mr. Lovkesh Kumar Chauhan

Designation : Vice President (Commercial)

Company Name : M/s. Energo Products Private Ltd

Company Seal :
SPECIAL CONDITIONS

SI.
DESCRIPTION
No
INSPECTION
1. Third Party Inspection applicable
CLAUSE
General Guarantee Warranty is applicable for a period of 12
months from the date of commissioning or 18 months from the
2. GGW
date of receipt of material, whichever is earlier as per the format
enclosed
1. Original Test certificate shall be furnished at free of cost with
each consignment either from the Laboratories approved by BIS
(or) from the Laboratories accredited by NABL.
2. The firm should furnish copy of the following documents from
where the test certificate is produced:
(a) Current valid approval/ accreditation certificate of the
TEST
3. laboratories &
CERTIFICATE
(b) Scope of certification covering the performed tests on the
supplied materials.
3. However, NLCIL reserves the right to test the material supplied
randomly, if required at CARD (Testing Unit of NLCIL) / MRT
Lab (NLCIL) or any other Approved / Accredited Lab and the test
result will be binding on the supplier.
Offers from approved vendors for this Bid will be considered for
evaluation. Offer from other vendors will be considered after
evaluation of credentials i.e. any purchase order containing the
NOTE TO THE
4. same/similar items placed by Govt./Quasi Govt./PSU/Public
SELLERS
Limited Company within India during the last 10 years as on the
original scheduled date of tender opening, with material
acceptance certificate/supply completion certificate.

Agreed for the above Special conditions

Signature of the authorized person with date:

Name : Mr. Lovkesh Kumar Chauhan

Designation : Vice President (Commercial)

Company Name : M/s. Energo Products Private Ltd

Company Seal :
LOCAL CONTENT CERTIFICATE

Certified that the content / valve addition in the offered item(s) under NLCIL GeM BID
NO: GEM/2024/B/4826135 DT: 30-03-2024 as per “MAKE IN INDIA” policy of
government of India is as follows:

SNUB PULLEY FOR BCN 2 A/B CONVEYOR


AS PER DRAWING NO: TPS II E / LHS /
1. Name of the Item : PULLEY / 005/ 2022 (Q3)

Whether any part / raw material


2. is imported for manufacturing of : NO
Tendered item.
(If yes, please specify the details)

3. Percentage of local content / : 100%


value addition made in India.

4. Details of location (s) at which : COIMBATORE, TAMILNADU


the local value addition is made.

Place: New Delhi Signature of the bidder


Date: 26-04-2024 Name of the Firm with Seal
ANNEXURE-2
SCOPE OF THIRD PARTY INSPECTION

The each Pulley shall be offered for Third party inspection for the following tests. The Third Party Inspection
Agency shall carry out the Inspection of Pulley and pulley shaft as stated below and furnish the original Reports,
certified by the Third Party Inspection Agency and the firm. Third Party Inspection Agency shall submit the Visit
Reports and the Dispatch clearance certificate for the material on satisfying the technical specifications as per P.O.
conditions.

a) Checking of Dimensions as per drawings. The third party inspector shall witness 100% dimensional check.
Deviation if any is observed, the same may be rejected.
b) Ultrasonic testing of 100% area should be conducted in all pulley, pulley shaft and end plates. Test reports in
original should be furnished at free of cost.
c) All Ultrasonic testing shall be conducted in the presence of third party inspection agency for pulley shell, end
plates, and pulley shafts.
d) Witnessing of static balance test
e) Verification of Material Test Certificates for Chemical Composition and Mechanical Properties and Heat
Treatment certificate.

i. A sample for testing chemical composition is to be collected in the presence of third party inspection agency
and authenticated by third party agency and sent to Govt. approved lab assigned by the Manufacturer.
The sample piece is to be kept at manufacturer site for checking at any time by NLC IL official as and
when required. Identification marks of the manufacturer and Third Party on each sample is to be embedded
and proper relevant records for sampling is to be maintained till the completion of purchase order.

ii. MTC furnished by the firm as per MTC clause will be verified and authenticated by the Third Party
Inspection agency for the Material Composition specified in the drawing / technical specification.(Material
to be tested as per MTC clause)

iii. If the sample material fails for the chemical composition, the entire consignment will be summarily
rejected.

Note.
1. NLCIL reserves the right to re-inspect the materials upon its

receipt Agreed for the above Third Party Inspection

Signature of the authorized person with date:

Name : Mr. Lovkesh Kumar Chauhan

Designation : Vice President (Commercial)

Company Name : M/s. Energo Products Private Ltd

Company Seal :