SolarEdge EV Charger can be paired with the inverter to provide smart energy
capabilities:
SolarEdge Home Wave/Hub Inverters automatically discover SolarEdge EV Charger(s)
installed on the same local network.
When connecting to the inverter with SetApp, SolarEdge EV Charger(s) will be
displayed as newly available devices in the Device Manager screen.
Tapping the Add button will automatically pair the selected SolarEdge EV Charger(s)
to the inverter and register them in the monitoring platform in the same site as the
inverter.
Note:
Baseline Charger FW version should be 1.14 or above to enable inverter pairing. An
automatic FW update is triggered when a new charger is connected to the internet.
Currently a single SolarEdge EV Charger in a site can be paired with the inverter
(multiple chargers to be supported in a future release). Other chargers on site that are
not paired with an inverter should be registered with the monitoring platform manually.
DIP Switch 1.3 of the SolarEdge EV Charger must be set to ON to enable pairing it with
the inverter
https://www.solaredge.com/en/support/setapp-inverters-firmware 2/18
6/1/23, 10:02 AM SetApp Enabled Inverters Firmware Updates | SolarEdge
https://www.solaredge.com/en/support/setapp-inverters-firmware 3/18
6/1/23, 10:02 AM SetApp Enabled Inverters Firmware Updates | SolarEdge
https://www.solaredge.com/en/support/setapp-inverters-firmware 5/18
6/1/23, 10:02 AM SetApp Enabled Inverters Firmware Updates | SolarEdge
https://www.solaredge.com/en/support/setapp-inverters-firmware 6/18
6/1/23, 10:02 AM SetApp Enabled Inverters Firmware Updates | SolarEdge
https://www.solaredge.com/en/support/setapp-inverters-firmware 7/18
6/1/23, 10:02 AM SetApp Enabled Inverters Firmware Updates | SolarEdge
excess PV charging (1ph at 6A or 3ph at 18A). After the pre-charge stage, the charger will
stop charging until minimal excess PV is available.
b. EV charging has a fixed second priority when installed in sites with a SolarEdge Home
battery.
User prioritization is disabled (it will be supported in a future release)
3. Scheduled charging limitations:
a. A pre-charge of up to 2 minutes will be performed when the charger is connected to a
car.
This pre-charge is used to determine the charging phases (1ph or 3ph). After the pre-
charge stage, the charger will stop charging until the schedule window.
Released Firmware Versions
Table 1: Inverters' firmware versions
Product DSP1 DSP2 Additional
SolarEdge Home Wave inverter- 1.100.1423
or
2.100.1302
or
EVSE
1.51.0
single phase (w/wo Storage I/F, 1.0.1616 2.0.1305
EVSE)
SolarEdge Home Hub inverter-
single phase
https://www.solaredge.com/en/support/setapp-inverters-firmware 9/18
6/1/23, 10:02 AM SetApp Enabled Inverters Firmware Updates | SolarEdge
https://www.solaredge.com/en/support/setapp-inverters-firmware 12/18
6/1/23, 10:02 AM SetApp Enabled Inverters Firmware Updates | SolarEdge
Known limitation: in backup, when load <250W, the battery stops charging from the
PV inverter
Safety
Improved SolarEdge Sense Connect performance
Communications
SolarEdge Home Network link quality analysis and channel selection
Add Wi-Fi channels 12-13 support
Display inverter’s Wi-Fi client IP when connected to Monitoring via Wi-Fi router
Grid & Power Control
P(f) mode 7 UI updated:
https://www.solaredge.com/en/support/setapp-inverters-firmware 13/18
6/1/23, 10:02 AM SetApp Enabled Inverters Firmware Updates | SolarEdge
(Australia only) Hide all AUS except for AS4777:2020 grid codes
(Japan Only) AC Socket Over Voltage and Under Voltage settings view and edit
enabled for SE5500H-JPJ with AC-Socket
https://www.solaredge.com/en/support/setapp-inverters-firmware 14/18
6/1/23, 10:02 AM SetApp Enabled Inverters Firmware Updates | SolarEdge
*The integration with LG batteries is no longer supported for new SolarEdge installations in Australia.
DCDC upgrade may fail when a meter (models below) is connected. In case it fails to
upgrade, there is a need to disconnect the meter, upgrade the DCDC again and then
reconnect the meter
On Wattnode meter – always
On other meters – very rare, less than 0.1%
Battery module on follower inverter will charge/discharge even when communication
loss with Master
Inverter works independently and not as a whole site Msc
Resolved Issues
Sub Giga bug was fixed, no need to change param 430 after installation
Part number and manufacturer fix on monitoring
DCDC and BMS upgrade issues
5th and 4th module upgrade issues
Battery stops charging at 70%
CB trip issues
Sites with stuck packets
Derating power at Max SoE
Firmware Package for 4.16.122 (StorEdge Three Phase
Inverters)
Table 1: Inverters' firmware versions
Product CPU DSP1 DSP2 Additional
Three Phase 4.16.122 1.20.1230 2.20.903 / DCDC: 2.2.132
StorEdge /1.13.2011 2.19.1602
Inverter
Contact Us
Join the SolarEdge Conversation
Support
Corporate
Smart Energy
© SolarEdge
Privacy Policy
Term & Conditions
Accessibility Statement
https://www.solaredge.com/en/support/setapp-inverters-firmware 18/18