Standard Rate Analysis For Site Specific Items 24.11.2023
Standard Rate Analysis For Site Specific Items 24.11.2023
Standard Rate Analysis For Site Specific Items 24.11.2023
(Please also refer the procedure for estimation of rate for this item)
(based on item no. 013120 of USSOR - Analysis of Rates (IR) and suitably modified with use of carriage and labour rates of
CPWD)
Total 231.98
B LABOUR:
Rate taken from Item no. 0113 of
1 Chowkidar day 0.001 558 0.56 Basic rates (Labour) of CPWD Delhi
DAR 2018
2 Sundries (No rates reqd) LS 1 0.1 0.10
C Total 232.64
Add for water charges @ 1% (no
D LS 0.01 2.33
rate reqd)
={Rate in
row (F) i.e.
G Final Cost of 1 Cum 238.80} x Ce
x Cs
Say Round off to nearest Rupee
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
Total 226.52
B LABOUR:
Rate taken from Item no. 0113 of
1 Chowkidar day 0.001 558 0.56 Basic rates (Labour) of CPWD Delhi
DAR 2012
2 Sundries (No rates reqd) LS 1 0.1 0.10
C Total 227.18
Add for water charges @ 1% (no
D LS 0.01 2.27
rate reqd)
={Rate in
row (F) i.e.
G Final Cost of 1 Cum 263.87} x Ce
x Cs
Say Round off to nearest Rupee
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
(based on item no. 013120 of USSOR - Analysis of Rates (IR) suitably modified with use of carriage and labour rates of CPWD
and item no. 16.78.3 of CPWD DAR for blending )
1 Beldar day 0.147 247 36.31 Rate taken from Item no. 0114 of Basic
rates (Labour) of CPWD Delhi DAR 2012
2 Coolie day 0.147 247 36.31 Rate taken from Item no. 0115 of Basic
rates (Labour) of CPWD Delhi DAR 2012
3 Bhisti day 0.020 260 5.20 Rate taken from Item no. 0101 of Basic
rates (Labour) of CPWD Delhi DAR 2012
4 Chowkidar day 0.0004 247 0.10 Rate taken from Item no. 0113 of Basic
rates (Labour) of CPWD Delhi DAR 2012
C Total 928.53
Add for water charges @ 1% (no
D LS 0.01 9.29
rate reqd)
={Rate in
row (F) i.e.
G Final Cost of 1 Cum 1078.49} x
Ce x Cv
Say Round off to nearest Rupee
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
(based on item no. 014051 of USSOR - Analysis of Rates (IR) and suitably modified with use of labour rates of CPWD-Delhi DSR
2016)
B LABOUR:
1 Beldar Day 1 368 368.00 The rate is as per basic labour rate of
item no. 0114 of CPWD Delhi DSR
2016.
2 Coolie Day 2 368 736 The rate is as per basic labour rate of
item no. 0115 of CPWD Delhi DSR
2016.
3 Bhisti Day 0.5 407 203.5 The rate is as per basic labour rate of
item no. 0101 of CPWD Delhi DSR
2016.
C Total 5319.05
D Add for water charges @ 1% LS 0.01 53.19
Add for Contractor's Profit and
E LS 0.15 805.84
overheads @15%
Cost for 100 Sqm 6,178.08
Cost for 1 Sqm 61.78
Say 61.8
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
(based on item no. 014052 of USSOR - Analysis of Rates (IR) and suitably modified with use of labour rates of CPWD-Delhi DSR
2016)
B LABOUR:
1 Beldar Day 3 368 1104.00 The rate is as per basic labour rate of
item no. 0114 of CPWD Delhi DSR
2016.
2 Coolie Day 4.39 368 1615.52 The rate is as per basic labour rate of
item no. 0115 of CPWD Delhi DSR
2016.
C Total 5226.12
D Add for water charges @ 1% LS 0.01 52.26
Add for Contractor's Profit and
E LS 0.15 791.76
overheads @15%
Cost for 100 Sqm 6,070.14
Cost for 1 Sqm 60.70
Say 60.7
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
(based on item no. 014053 of USSOR - Analysis of Rates (IR) and suitably modified with use of labour rates of CPWD-Delhi DSR
2016)
B LABOUR:
1 Beldar Day 2.5 368 920.00 The rate is as per basic labour rate of
item no. 0114 of CPWD Delhi DSR
2016.
2 Coolie Day 2.5 368 920 The rate is as per basic labour rate of
item no. 0115 of CPWD Delhi DSR
2016.
C Total 4353.20
D Add for water charges @ 1% LS 0.01 43.53
Add for Contractor's Profit and
E LS 0.15 659.51
overheads @15%
Cost for 100 Sqm 5,056.24
Cost for 1 Sqm 50.56
Say 50.6
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
BOQ Item No. 1011
(based on item no. 193080 of USSOR - Analysis of Rates (IR) and suitably modified with use of carriage and labour rates of
CPWD)
Extra for every km or part thereof transport of CPWD Delhi DAR 2012.
4 for Lead beyond 1 km but upto 5 Km 4 8.63 34.52 Deduct rate for 1 km lead from the
km rate for 5 km lead and divide by 4 for
average rate per km. Contractor's
profit & overhead @ 15% has been
deducted from the CPWD rate.
Fill in lead qty as per actuals. Rates
based on item no. 1.1.5 of Carriage of
Materials rates by mechanical
Extra for every km or part thereof
5 for Lead beyond 5 km but upto Km 5 7.38 36.9 transport of CPWD Delhi DAR 2012.
10 km Contractor's profit & overhead @ 15%
has been deducted from the CPWD
rate.
Extra for every km or part thereof
6 for Lead beyond 10 km but upto Km 0 6.08 0 -do-
20 km
Extra for every km or part thereof
7 Km 0 4.96 0 -do-
for Lead beyond 20 km
Total 777.65
B LABOUR:
Rate taken from Item no. 0128 of
1 Mate day 0.01 260 2.60 Basic rates (Labour) of CPWD Delhi
DAR 2012
C Total 854.35
Add for water charges @ 1% (no
D LS 0.01 8.54
rate reqd)
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
(based on item no. 013120 of USSOR - Analysis of Rates (IR) suitably modified with use of carriage and labour rates of CPWD
and item no. 16.78.3 of CPWD DAR for blending )
1 Blanket material cum 1 488 488 Rate worked out assuming 80%
moorum and 20% fine sand in the
blanketing material. The
proportioning depending upon
materials available at site will
change so as to obtain blanket as
per specs. Rate for moorum & fine
sand taken from Item no. 0810 &
0983 of Basic rates (Materials) of
CPWD Delhi DAR 2012 respectively
i.e. 0.8x450+0.2x640 = Rs. 488/-.
Rate includes cost of blanketing
materials to be paid to the
land/quarry owner and royalty and
any other levy/tax. Rate for the
required blanket material as
prevailing in the project area to be
taken.
2 Transportation of blanketing Cum 1 71.98 71.98 Rates based on item no. 1.1.2 of
material by mechanical means Carriage of Materials rates (by
including loading and unloading mechanical transport) of CPWD
for lead upto 1 km Delhi DAR 2012. Contractor's profit
& overhead @ 15% has been
deducted from the CPWD rate.
3 Extra for every km or part thereof Km 4 9.38 37.51 Fill in lead qty as per actuals. Rate
for Lead beyond 1 km but upto 5 is based on item no. 1.1.2 of
km Carriage of Materials rates by
mechanical transport of CPWD
Delhi DAR 2012. Deduct rate for 1
km lead from the rate for 5 km
lead and divide by 4 for average
rate per km. Contractor's profit &
overhead @ 15% has been
deducted from the CPWD rate.
4 Extra for every km or part thereof Km 5 8.02 40.09 Fill in lead qty as per actuals. Rates
for Lead beyond 5 km but upto based on item no. 1.1.2 of Carriage
10 km of Materials rates by mechanical
transport of CPWD Delhi DAR
2012. Contractor's profit &
overhead @ 15% has been
deducted from the CPWD rate.
Total 850.56
B LABOUR: Quantities of each type of labour
taken from item of Delhi CPWD
and additional quantity of 0.153
for Beldar has been taken for
stacking of blanketing material
1 Beldar day 0.3 247 74.1 Rate taken from Item no. 0114 of
Basic rates (Labour) of CPWD Delhi
DAR 2012
2 Coolie day 0.147 247 36.31 Rate taken from Item no. 0115 of
Basic rates (Labour) of CPWD Delhi
DAR 2012
3 Bhisti day 0.02 260 5.2 Rate taken from Item no. 0101 of
Basic rates (Labour) of CPWD Delhi
DAR 2012
4 Chowkidar day 0.0004 247 0.1 Rate taken from Item no. 0113 of
Basic rates (Labour) of CPWD Delhi
DAR 2012
5 Sundries (No rates reqd) LS 1 0.05 0.05
C Total 966.32
D Add for water charges @ 1% (no LS 0.01 9.29
rate reqd)
E Add for Contractor's Profit and LS 0.15 140.67
overheads @15% (no rate reqd)
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
Standard Rate Analysis for Site Specific Items of Schedule 2A of the BOQ
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note:
CPWD / IRUSSOR of Indian Railways
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note: CPWD / IRUSSOR of Indian Railways
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note:
CPWD / IRUSSOR of Indian Railways
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note:
CPWD / IRUSSOR of Indian Railways
MATERIALS:
The material rates as per basic
Stone Aggregate (Single size) : 20 mm rates for materials Code No.
1.1 cum 0.67 1400.0 938.00
nominal size 0295 of CPWD Delhi DAR
2021.
The material rates as per basic
Stone Aggregate (Single size) : 10 mm rates for materials Code No.
1.2 cum 0.22 1350.0 297.00
nominal size at site of work 0297 of CPWD Delhi DAR
2021.
The material rates as per basic
rates for materials Code No.
1.3 Carriage of stone aggregates cum 0.89 163.93 145.90
2202 of CPWD Delhi DAR
2021.
The material rates as per basic
rates for materials Code No.
1.4 Coarse sand at site of work cum 0.445 1500.0 667.50
0982 of CPWD Delhi DAR
2021.
The material rates as per basic
rates for materials Code No.
1.5 Carriage of sand cum 0.445 163.93 72.95
2203 of CPWD Delhi DAR
2021.
The rates are exclusive of
GST, contractors profit & OH
LABOUR:
but inclusive of wages for
weekly day of rest
Rates as per basic rates for
1.6 Mason (average) day 0.1 749 74.90 labour Code No. 0155 of
CPWD Delhi DAR 2021.
Rates as per basic rates for
1.7 Beldar day 1.63 645 1,051.35 labour Code No. 0114 of
CPWD Delhi DAR 2021.
Rates as per basic rates for
1.8 Bhisti day 0.7 714 499.80 labour Code No. 0101 of
CPWD Delhi DAR 2021.
Rates as per basic rates for
Hire charges of Concrete Mixer 0.25 to hire charges for plant and
1.9 day 0.07 800 56.00
0.40 cum with hopper machinery Code No. 0002 of
CPWD Delhi DAR 2021.
Rates as per basic rates for
hire charges for plant and
1.10 Vibrator (Needle type 40 mm) day 0.07 350 24.50
machinery Code No. 0012 of
CPWD Delhi DAR 2021.
1.11 Sundries L.S. 14.3 2.12 30.32 Code No 9999
A Cost of 1 cum 1:2:4 concrete 3,858.22
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note:
CPWD / IRUSSOR of Indian Railways
a) Machinery
Total 44,423.02
Sundries (no rates reqd.) 1 1492.9 1,492.90
Total 45,915.92
Add for Water Charges @ 1% (no rates
0.01 459.16
reqd.)
Total 46,375.08
Add GST @18% 8,347.51
Add for Contractor’s Profit and Overheads
0.15 6,956.26
@ 15% (no rates reqd.)
C Total cost for B 61,678.86
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note:
CPWD / IRUSSOR of Indian Railways
a) Machinery
Total 42,999.24
Sundries (no rates reqd.) 1 1376.22 1,376.22
Total 44,375.46
Add for Water Charges @ 1% (no rates
0.01 443.75
reqd.)
Total 44,819.21
Add GST @18% 8,067.46
Add for Contractor’s Profit and Overheads
0.15 6,722.88
@ 15% (no rates reqd.)
C Total cost for B 59,609.56
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note: CPWD / IRUSSOR of Indian Railways
a) Machinery
Total 42,999.24
Sundries (no rates reqd.) 1 1319.89 1,319.89
Total 44,319.13
Add for Water Charges @ 1% (no rates
0.01 443.19
reqd.)
Total 44,762.32
Add GST @18% 8,057.22
Add for Contractor’s Profit and Overheads
0.15 6,714.35
@ 15% (no rates reqd.)
C Total cost for B 59,533.89
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note:
CPWD / IRUSSOR of Indian Railways
a) Machinery
Total 42,522.46
Sundries (no rates reqd.) 1 1295.41 1,295.41
Total 43,817.87
Add for Water Charges @ 1% (no rates
0.01 438.18
reqd.)
Total 44,256.05
Add GST @18% 7,966.09
Add for Contractor’s Profit and Overheads
0.15 6,638.41
@ 15% (no rates reqd.)
C Total cost for B 58,860.54
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note:
CPWD / IRUSSOR of Indian Railways
(based on item no. 193080 of USSOR - Analysis of Rates (IR) and suitably modified with use of carriage and labour rates of CPWD)
C Total 1,323.00
Add GST @ 18% 238.14
Add for Contractor's Profit and overheads
E LS 0.15 198.45
@15% (no rate reqd)
Total 1,759.59
Cost of 1 Cum 1,759.59
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note:
CPWD / IRUSSOR of Indian Railways
Cement Mortar 1:6 (1 cement : 5 coarse Rates as per rate analysis for
4 sand) cum 0.33 2399.85 791.95 1:5 cement mortar (given
below)
Pointing with 1:3 cement mortar (@3.5
sqm for 1 cum of RR masonry considering Rates as per rate analysis for
5 wall thickness of 40 cm and inside and top sqm 3.5 234.13 819.46 flush pointing with 1:3 cement
face to be pointed) mortar (given below)
LABOUR:
Rates as per basic rates for
6 day 1.07 714.00 labour Code No. 0125 of
Mason (for plain stone work) 2nd class CPWD Delhi DAR 2021.
Rates as per basic rates for
7 day 1.07 645.00 690.15 labour Code No. 0114 of
Beldar CPWD Delhi DAR 2021.
Rates as per basic rates for
8 day 0.71 645.00 457.95 labour Code No. 0115 of
Coolie CPWD Delhi DAR 2021.
Rates as per basic rates for
9 day 0.09 714.00 64.26 labour Code No. 0101 of
Bhisti CPWD Delhi DAR 2021.
10 Cement concrete 1:6:12 L.S. 0 1.73 - Not applicable
11 Sundries L.S. 4.42 1.73 7.65
Total 4,505.14
12 Add Water charges @ 1% 45.05
Total 4,550.19
13 Add GST@18% 819.03
14 Add CPOH @ 15% 682.53
Total 6,051.75
Cost of 1 Cum 6,051.75
Say 6,052.00
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note:
CPWD / IRUSSOR of Indian Railways
Rate Analysis for Cement Mortar (1:3 or 1:4 or 1:5 or 1:6)
(based on item no. 3.10 of CPWD DAR 2021, Note: Rate analysis for 1:5 and 1:3 is same as cement cost is not included)
S. No. Description Unit Quantity Rate Amount Remarks
Details of cost for 1 cum
Material
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
Note: CPWD / IRUSSOR of Indian Railways
Rate Analysis for Flush/Ruled Pointing on Stone work (1:3 cement mortar)
(based on item no. 13.33.1 of CPWD DAR 2021)
S. No. Description Unit Quantity Rate Amount Remarks
Details of cost for 10 sqm
Material
Cement mortar 1:3 (1 cement : 3 fine Rates as per rate analysis for
1 sand) cum 0.023 2399.85 55.20 1:3 cement mortar (given
above)
2 Sundries L.S. 7.15 2.12 15.16
LABOUR
Mason (average) Rates as per basic rates for
3 day 0.92 749.00 689.08 labour Code No. 0155 of
CPWD Delhi DAR 2021.
Coolie Rates as per basic rates for
4 day 1.37 645.00 883.65 labour Code No. 0115 of
CPWD Delhi DAR 2021.
Bhisti Rates as per basic rates for
5 day 0.93 714.00 664.02 labour Code No. 0101 of
CPWD Delhi DAR 2021.
Scaffolding and racking out joints including
6 L.S. 16.12 2.12 34.17
sundries
TOTAL 2,341.28
Add 1% water charges - Not to be considered here
TOTAL 2,341.28
Add 15% Contractor's Profit and
- Not to be considered here
overheads
Cost of 10.00 sqm 2,341.28
Cost of 1.00 sqm 234.13
Say 234.13
Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest available DAR of
CPWD / IRUSSOR of Indian Railways
Note:
Standard Rate Analysis for Site Specific Items of Schedule 3 of the BOQ
1 Mate day 0.005 260 1.3 Rate taken from Item no. 0128 of Basic
rates (Labour) of CPWD Delhi DAR 2012
2 Beldar day 0.05 247 12.35 Rate taken from Item no. 0114 of Basic
rates (Labour) of CPWD Delhi DAR 2012
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from
latest available DAR of CPWD / IRUSSOR of Indian Railways
Standard Rate Analysis for Site Specific Items of Schedule 7A of the BOQ
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
8 Vibrator (Needle type 40 mm) day 0.07 350 24.5 Code No 0012
9 Sundries L.S. 13.52 2.12 28.66 Code No 9999
Total 3,571.42
10 Add Water charges @ 1% 35.71
Total 3,607.13
11 GST @18% 649.28
12 Add CPOH @ 15% 541.07
Total 4,797.48
Cost of 1 Cum 4,797.48
Say 4,797
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
BOQ Item no. 7003
(based on item no. 4.1.3 of CPWD Delhi DAR 2021 )
S. No. Description Unit Quantity Rate Amount Remarks
1 CONCRETE
Details of cost for 1:2:4 Analysis based on item no. 4.1.3
concrete 20mm aggregates 1 of CPWD Delhi DAR 2021.
cum without cement
MATERIALS:
LABOUR:
Rates as per basic rates for labour
1.6 Mason (average) day 0.1 749 74.9 Code No. 0155 of CPWD Delhi
DAR 2021.
Rates as per basic rates for labour
1.7 Beldar day 1.63 645 1051.35 Code No. 0114 of CPWD Delhi
DAR 2021.
Rates as per basic rates for labour
1.8 Bhisti day 0.7 714 499.8 Code No. 0101 of CPWD Delhi
DAR 2021.
Rates as per basic rates for hire
charges for plant and machinery
Hire charges of Concrete Mixer
1.9 day 0.07 800 56 Code No. 0002 of CPWD Delhi
0.25 to 0.40 cum with hopper DAR 2021.
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
BOQ Item No. 7004
(based on item no. 013120 of USSOR - Analysis of Rates (IR) and suitably modified with use of carriage and labour rates of CPWD)
Total 177.92
B LABOUR:
Rate taken from Item no. 0113 of
1 Chowkidar day 0.001 247 0.25 Basic rates (Labour) of CPWD Delhi
DAR 2012
2 Sundries (No rates reqd) LS 1 0.1 0.10
C Total 178.27
Add for water charges @ 1%
D LS 0.01 1.78
(no rate reqd)
Add for Contractor's Profit and
E overheads @15% (no rate LS 0.15 27.01
reqd)
F Mechanical compaction cum 1 10.15 10.15 Rate taken from SBOQ item no. 1006
G Grand Total (C+D+E+F) Cum 1 217.21
Cost of 1 Cum 217.21 For lead within 1 km
Say 217 For lead within 1 km
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
BOQ Item No. 7007C
(based on item no. 16.75 of CPWD DAR 2016 )
S. No. Description Unit Quantity Rate Amount Remarks
Details of cost for 1.00 cum
MATERIALS:
1 cum 1.00 4786.00 4786 Rates as per rate analysis for item
Concrete M 25 = 1.00 cum i/c no. 2004 of BOQ
placing of concrete, vibrating,
levelling etc
2 Operational charges for L.S. 57.2 1.73 98.96
vacuum dewatering system i/c
screed vibration, placing of
filter mat, top mat, vacuum
process, floating, trowelling,
Brooming etc.
Total 4,956.93
4 Add 1% water charges on all 1.71
except (1)
Total 4,958.64
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
BOQ Item No. 7033
(based on item no. 193080 of USSOR - Analysis of Rates (IR) and suitably modified with use of carriage and labour rates of CPWD)
Total 550.75
B LABOUR:
Rate taken from Item no. 0128 of
1 Mate day 0.01 260 2.60 Basic rates (Labour) of CPWD Delhi
DAR 2012
C Total 627.45
Add for water charges @ 1%
D LS 0.01 6.27
(no rate reqd)
Add for Contractor's Profit and
E overheads @15% (no rate LS 0.15 95.06
reqd)
Cost of 1 Cum 728.78 For lead of 5 km
Say 729 For lead of 5 km
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
Item No. Description Size Unit Rate (Rs.) Quantity Amount (Rs.)
Supply and laying of Drip
Irrigation system
(A) HEAD UNIT
1 Hydro - cyclone filter 50m 3/hr 2" No 2701.60 1.00 2701.60
Item No. Description Size Unit Rate (Rs.) Quantity Amount (Rs.)
1 PVC Pipe (4 kg/cm2) 90 mm mtr 78.02 300.00 23406.00
2 PVC Pipe (4 kg/cm2) 63 mm mtr 38.81 400.00 15524.00
3 PVC Pipe (6 kg/cm2) 40 mm mtr 24.59 100.00 2459.00
4 PVC BALL VALVE / Control Valve 63 mm mm 356.00 6.00 2136.00
Total Head Unit (A) and (B) and Labour Charges 155,278.82
Over Head Charges 15% 23,291.82
Grand Total Head Unit (A) and (B) 178,570.64
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken from latest
available DAR of CPWD / IRUSSOR of Indian Railways
Standard Rate Analysis for Site Specific Items of Schedule 8 of the BOQ
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken
from latest available DAR of CPWD / IRUSSOR of Indian Railways
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken
from latest available DAR of CPWD / IRUSSOR of Indian Railways
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken
from latest available DAR of CPWD / IRUSSOR of Indian Railways
BOQ Item No. 8004
Note: Wherever rates have been taken from CPWD DAR or IRUSSOR, the same should be taken
from latest available DAR of CPWD / IRUSSOR of Indian Railways