PLC - Hai Anh Wind Power Plant Project-TS5
PLC - Hai Anh Wind Power Plant Project-TS5
PLC - Hai Anh Wind Power Plant Project-TS5
TS5
32 80.2 32 80.2
34 72.9 34 72.9
36 66.5 36 66.5
38 60.7 38 60.7
Installation Contractor/
40 55.1 40 55.1
44 45.3 44 45.3
R2
6 00
TS5
0
335
40
Drawing status/
TS4
50000
FOR INSTALLATION
INSTALLATION PERMIT
40000
Project Name/
97635
Project Location/
TS3
Lao Bao Town , Huong Hoa District , Quang Tri
20000
Provincial
Drawing Title/
Installation TS5
Civil Engineer:
TS2
Electrical Engineer:
R26
R98 Draw by/
00
000
PHAM TIEN DAT
Check by/
foundation
TS1
VU HUNG THAI
10000 19550 6000
Drawing Revison/
TS5
40000
8000 26000 26000
m m Hook Block / 2 2. Minimum pressure capacity of the ground for main crane:
Radius 26.0 26.0 26.0 Radius / 8.0 8.0 8.0 25Ton/m2
Load Chart Capacity Load Chart Capacity HB Weight / 5.7t
t 108.0 108.0 108.0 t 64.0 64.0 64.0 .
Load Parameters Load Parameters IHI CCH1000-5 / C 2 3 3. Crane working & traveling area to be kept free from any
t construction and obstruction.
t t Boom Config / C
Load / 25.2 50.3 50.3 Load / 25.2 0.0 0.0
3 4. Max wind speed for lifting: 10 m/s
Tackle / t 0.5 0.5 0.5 Tackle / t 0.5 0.5 0.5
Main Boom Length / 27.0 m