1 Date 1/16/2024
2 Project : P.021056 MPA-PMC Services for MEP & FF works Consultancy at Third Chemical Berth at Pirpau

3 Comment Response Sheet (CRS Sheet )

4 Submittal Details: Comment on QAP OF CARBON STEEL PIPES


5
Sl. No. ITP Description MBPA / TEPL observations (12-09-2023) ITDC Reply 03.01.2024) MBPA / TEPL observations dated 16.01.2024
6
Hydrotest shall be done as per approved QAP and witness
7 1 Hydrotest sahll be witnessed by TPIA Noted & Perform at site by TPIA before dispatch the material at site

Noted .
8 2 Mass per Meter length shall be witnessed by TPIA Noted .

Mechanical testing and chemical Testing shall be witnessed


by TPIA .and all testing as per QAP shall be done and witness
9 3 Visual,Dimension,Mechanical testing and chemical Testing sahll be witnessed by TPIA Noted . by TPIA before dispatch the material at site

Mechanical testing and chemical Testing shall be witnessed


by TPIA .and all testing as per QAP shall be done and witness
10 4 Visual,Dimension,Mechanical testing and chemical Testing shall be witnessed by TPIA Noted . by TPIA before dispatch the material at site

Marking IS3589 as per Clause -3 on pipes (Refer Pics) & Name & Noted
Stamper shall be on MTC documents

QAP FOR CARBON STEEL PIPES


5 :ITDC/MBPT/FFS/TDS/029 Client Name Shall be mentioned in marking
11

Noted
12 6 Kindly check Size and Thickness Size and thickness is complied as per approved datasheets.

Noted
QAP of pipes is as per standard TATA pipes for Dealer.
7 Kindly mention Project Name,client name and contractor name Project Name,client name and contractor name is mentioned in the
13
revised sheet.

MTC Shall be as per EN 10204 3.2 Noted ,Inspection and testing shall be done as per approved
Pipe properties MTC shall be as per 3.1 standard. Please note that all QAP before dispatch the material at site
hydro test performed at site while mechanical and chemical test
14 8 already done in government approved laboratory which means We
follow as per EN 10204 3.2.

Note: M/S ITD Cem has procure the material from M/S. TATA Steel certified distributor. M/S. Tube supplier has not enough to provide raw material test certificate, internal hydrotest
15 report, flattening test of coil, painting report etc therefore M/S. ITD Cem are requesting to M/S TEPL / Client kindly considered the lab test report certified by NABL. We have already provide all test
report such as mechanical and chemical and hydro test performed at site .