Professional Documents
Culture Documents
Op Dissass Prov Safety Line Tower SGX.X: Work Instruction
Op Dissass Prov Safety Line Tower SGX.X: Work Instruction
Op Dissass Prov Safety Line Tower SGX.X: Work Instruction
File name
GD490580-en_OP DISSASS PROV SAFETY LINE TOWER SGX.X_R0.8.docx/pdf
Siemens Gamesa Renewable Energy S.A. Parque Tecnológico de Bizkaia, Edificio 222, 48170, Zamudio, Vizcaya, Spain
+34 944 03 73 52 – info@siemensgamesa.com – www.siemensgamesa.com
Table of contents
Preface...................................................................................................................................................................... 2
1.1. Purpose ............................................................................................................................................................ 2
1.2. Applicability ....................................................................................................................................................... 2
1.3. Audience ........................................................................................................................................................... 2
1.4. Document history .............................................................................................................................................. 2
1.5. List of external references ................................................................................................................................ 3
1.6. Abbreviations and acronyms ............................................................................................................................ 3
1.7. PPEs ................................................................................................................................................................. 4
1.8. Tools, consumables, spare parts...................................................................................................................... 5
Step by step work instruction .................................................................................................................................... 6
2.1. Dismounting the temporary lifeline. Supplier “Somain” .................................................................................... 6
2.2. Dismounting the temporary lifeline. Supplier “Aguerri” ..................................................................................... 9
Tasks to perform after the step by step .................................................................................................................. 12
3.1. Housekeeping ................................................................................................................................................. 12
3.2. Fault report ..................................................................................................................................................... 12
Disclaimer of liability and conditions of use ................................................................................................................ 13
Trademarks ................................................................................................................................................................. 13
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 1 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
1. Preface
Preface
1.1. Purpose
This document describes the procedure for removing the temporary lifeline in each section of the tower.
1.2. Applicability
Product applicability
1.3. Audience
1.3.1. Technician level
Only a trained technician according to the following instructions is allowed to perform the work
described in this document:
• INS 52959 ON CNS Qualification Management (for internal SGRE resources)
• INS 52960 ON Installation Contractor Qualification Management (for external resources)
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 2 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
1. Preface
Documentation Set
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 3 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
1. Preface
1.7. PPEs
1.7.1. Mandatory PPE for any task on all sites
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 4 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
1. Preface
1.8.3. Consumables
Description Part number Qty Comments
N/A
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 5 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
2. Step by step work instruction
The temporary lifelines in the lower/middle sections shall be disassembled after the final lifeline has
been mounted and certified
Start dismounting the lifeline from middle section below top section
Release the bottom support of the lifeline after releasing the lifeline and tensioner.
Step 1
Remove bottom support of the lifeline:
1. Stand at the bottom of the ladder.
2. Release the locknuts (A) of the tensioner
• Turn the nut until it touches the ends of the tensioner.
• Use a 19 mm combination wrench.
3. Check that the U-bolts of the lifeline are still tightened after loosening the tensioner.
4. Release tension:
• Turn the female threaded piece (B) to its maximum length.
• Use an adjustable wrench
5. Remove the tensioner (C) (completely open) to the bottom support (D):
• Release the bolt joint between the elements (C and D)
• Use an adjustable wrench and a 17 mm combination wrench.
6. Remove the bottom support
• Use an adjustable wrench and a combination wrench
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 6 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
2. Step by step work instruction
Step 1
Step 2
Remove upper support of the provisional lifeline:
1. Stand at the top of the service ladder
2. Secure the upper support of the lifeline (A) during disassembly:
• Hang the upper support using the sling (D), on the lower fastening point of the spring.
• Pull the loose end of the sling to secure the hanging.
• Join the loose end of the sling to the nearest top ladder support (B) using a shackle (C) or
anchorage point (E) using a carabiner (F) or a shackle.
3. Remove the lower support from the upper support.
• Remove the pin (G)
4. Put the upper support on the platform
5. Gather the cable
6. Release the sling.
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 7 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
2. Step by step work instruction
Step 2
Step 3
1. Dismount the spring or energy absorber.
• Use universal pliers to remove the stud.
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 8 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
2. Step by step work instruction
Step 4
Lower the lifeline to the bottom platform:
► Follow the corresponding work instructions:
Repeat steps 1, step 2, step 3 and step 4 to dismount the temporary lifeline from all the tower sections
(unless the top section)
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 9 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
2. Step by step work instruction
Step 1
Step 2
Remove upper support of the provisional lifeline:
1. Stand at the top of the service ladder
2. Secure the upper support of the lifeline (A) during disassembly:
• Hang the upper support using the sling (D), between the two upper fastenings of the support
• Pull the loose end of the sling to secure the hanging.
•Join the loose end of the sling to the nearest top ladder support (B) using a shackle (C) or
anchorage point (E) using a carabiner (F) or a shackle.
3. Remove the upper support
• Use a 17 mm combination wrench to release the nut (H)
4. Situate the upper support on the platform
5. Gather the cable
6. Release the sling.
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 10 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
2. Step by step work instruction
Step 2
Step 3
Repeat steps 1, step 2 and step 3 to dismount the temporary lifeline from all the tower sections (unless
the top section)
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 11 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
3. Tasks to perform after the step by step
3.1. Housekeeping
3.1.1. Turbine cleanness
Gather, clean and organize all the tools used during this operation.
Report technical errors and/or improvement suggestions (affecting the described process) via the
email:
► cns.support@siemensgamesa.com
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 12 / 13
Work Instruction
OP DISSASS PROV SAFETY LINE TOWER SGX.X
3. Tasks to perform after the step by step
Trademarks
All trademarks mentioned herein are the property of their respective owner.
GD490580-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 13 / 13