Professional Documents
Culture Documents
Op Ass Aguerri Safety Line Tower SGX.X: Work Instruction
Op Ass Aguerri Safety Line Tower SGX.X: Work Instruction
File name
GD489458-en_OP ASS AGUERRI SAFETY LINE TOWER SGX.X_R0.5.docx/pdf
Siemens Gamesa Renewable Energy S.A. Parque Tecnológico de Bizkaia, Edificio 222, 48170, Zamudio, Vizcaya, Spain
+34 944 03 73 52 – info@siemensgamesa.com – www.siemensgamesa.com
Table of contents
Preface...................................................................................................................................................................... 2
1.1. Purpose ............................................................................................................................................................ 2
1.2. Applicability ....................................................................................................................................................... 2
1.3. Audience ........................................................................................................................................................... 2
1.4. Document history .............................................................................................................................................. 2
1.5. List of external references ................................................................................................................................ 3
1.6. Abbreviations and acronyms ............................................................................................................................ 3
1.7. PPEs ................................................................................................................................................................. 4
1.8. Tools, consumables, spare parts ...................................................................................................................... 5
Step by step work instruction .................................................................................................................................... 6
2.1. Visual inspection ............................................................................................................................................... 6
2.2. Assembly the lifeline ......................................................................................................................................... 6
Tasks to perform after the step by step .................................................................................................................. 11
3.1. Housekeeping ................................................................................................................................................. 11
3.2. Fault report ..................................................................................................................................................... 11
Disclaimer of liability and conditions of use ................................................................................................................ 12
Trademarks ................................................................................................................................................................. 12
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 1 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
1. Preface
Preface
1.1. Purpose
This document describes the assembly procedure of the lifeline AGUERRI for the tower service ladder
1.2. Applicability
Product applicability
1.3. Audience
For further information:
► SG Training Web
Only a trained technician according to the following instructions is allowed to perform the work
described in this document:
• INS 52959 ON CNS Qualification Management (for internal SGRE resources)
• INS 52960 ON Installation Contractor Qualification Management (for external resources)
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 2 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
1. Preface
Documentation Set
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 3 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
1. Preface
1.7. PPEs
1.7.1. Mandatory PPE for any task on all sites
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 4 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
1. Preface
1.8.3. Consumables
Description Part number Qty Comments
AMERICAN TAPE 357 50MMX30M GP029116
Insulate tape black HERR0035
Permanent marker
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 5 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction
The inspection of the anchor points of the top of the lifeline must be performed prior to lift the section.
Step 1
Visual inspection. Check:
1. Upper support on upper tower section
• It shall be centered on the first 3 reinforced rungs of the ladder
• Check absence of blows, rust or deformities
2. Absorbing system
• It has not been tampered with
• Check the permanent marker marks on the screws.
3. Cable
• Without crushed, folded, cut, frayed, etc.
• The set and the cable are installed in its position with the mechanical absorbing system; parallel
to the support without bending, downward
4. Lower support or any of its parts is not missing.
5. Abcense of rust on any of the components.
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 6 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction
Situate the lifeline on the platform avoiding tangled up with any other cable or with the ladder itself
Step 2
Unload the registration plates, since they shall be placed on each of the sections together with the rest
of the labels, see OP ASS LABELS IN SECTIONS SGX.X (ACCORDING TO ASSEMBLY MANUAL
PROJECT)
Step 3
Rout the lifeline:
1. Position of the workers during the operation
• 1 worker climbs down to the next platform
• 2 workers lower the lifeline through the hole in the platform (A)
2. Unload the lifeline
• 1 worker begins unrolling the lifeline and
• 1 worker controls the descent
• 1 worker on the next platform collect the tip of the lifeline and must be positioned away from its
projections (B)
Repeat 1, 2 and 3 to lower the lifeline through the remaining platforms until reaching platform
0
3. Check:
• The lifeline is long enough to make a loop and place the cable ties.
• There is no interference along the tower
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 7 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction
Step 3
The lower support of the lifeline comes preassembled from the factory, on the lower rungs of the ladder
on the top tower section (together with the lifeline rolled up on the ladder).
Step 4
Lower the remaining components to platform 0
1. Dismount from the ladder on the top section:
• The ladder support of the lifeline, nameplate and tensioner
2. Lower the elements to platform 0
► Follow the steps described at:
Product Code Document description
SG2.X(1) and SG2.6 GD490648-EN OP COMMON ASSEMBLY INSTRUCTION SG2.X
SG3.X GD490342-EN OP COMMON ASSEMBLY INSTRUCTION SG3.X
SG4.X GD386960-EN OP COMMON ASSEMBLY INSTRUCTION SG4.X
(1)
Not included G9X
These rungs must be reinforced with a threaded rod. The lower support must be fitted onto the central
part of the rung so that the welded plate is facing the inside of the ladder.
Review all the welding. Verify that the lower support does not present breakage, pores, blows or
deformities. If so, replace it.
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 8 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction
Step 5
Assembly the lower support of the lifeline:
1. Position the support of the lifeline (A) in the last two reinforced steps under the platform of bottom
section
2. Fitted the support
3. Tighten the support with M6 bolts
► According to GPS85001 TIGHT. TORQUE OF STRUC AND ELECTR JOINTS
4. Mark the torque
► According to GPS85001 TIGHT. TORQUE OF STRUC AND ELECTR JOINTS
Step 6
Mounting the cable:
1. Run the cable from the upper area (A) to the lower area (C) through the bushing
2. Keep the nuts loose
3. Check that the screws do not interfere
4. Tighten the lower nut (D) until it touches the lower plate (E)
A: Inlet D: Nut
B: Screws E Plate
C: Outlet
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 9 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction
Step 7
Tension the cable
1. Pretensioning. Make 3 actions at once:
• Pull the cable (A) + Pull the bushing (B) + Tighten the screws (C)
2. Tensing the lifeline
• Tighten the nut (D) until the fastening is positioned in the middle of max (E) and min (F)
• Use a ring/fork spanner 17 mm
3. Once the indicator is in the work area (H), tighten the second nut to make a locknut with the unit.
4. Place and tape the cable to 8cm from the nut
A: Cable E: Maximum
B: Bushing F: Minimum
C: Screws G: Minimum use
D: Nuts H: Normal position. F spring = 800N
Step 8
Cut the excess lifeline
1. Protect the area to be cut with insulate tape black
• Situate the insulate tape black at 200 mm from the last cable clamps
2. Cut the excess lifeline with diagonal cutter for electromechanics
3. Fasten the free end of the lifeline with insulate tape black
4. Ensure that the spacers guide the lifeline correctly.
Having completed the assembly of the permanent lifeline, it must be certified for its use.
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 10 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
3. Tasks to perform after the step by step
3.1. Housekeeping
3.1.1. Turbine cleanness
Gather, clean and organize all the tools used during this operation.
Report technical errors and/or improvement suggestions (affecting the described process) via the
email:
► cns.support@siemensgamesa.com
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 11 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
3. Tasks to perform after the step by step
Trademarks
All trademarks mentioned herein are the property of their respective owner.
GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 12 / 12