Work Instruction

OP ASS AGUERRI SAFETY LINE TOWER SGX.X

OP ASS AGUERRI SAFETY LINE TOWER


SGX.X
Document ID and revision Status Date (yyyy-mm-dd) Language
GD489458-EN/0 Released 2021-04-20 en-US

Original or translated of AL/ECCN RDS-PP® DCC


Original N/N = &CDC070

File name
GD489458-en_OP ASS AGUERRI SAFETY LINE TOWER SGX.X_R0.5.docx/pdf
Siemens Gamesa Renewable Energy S.A. Parque Tecnológico de Bizkaia, Edificio 222, 48170, Zamudio, Vizcaya, Spain
+34 944 03 73 52 – info@siemensgamesa.com – www.siemensgamesa.com

Table of contents
Preface...................................................................................................................................................................... 2
1.1. Purpose ............................................................................................................................................................ 2
1.2. Applicability ....................................................................................................................................................... 2
1.3. Audience ........................................................................................................................................................... 2
1.4. Document history .............................................................................................................................................. 2
1.5. List of external references ................................................................................................................................ 3
1.6. Abbreviations and acronyms ............................................................................................................................ 3
1.7. PPEs ................................................................................................................................................................. 4
1.8. Tools, consumables, spare parts ...................................................................................................................... 5
Step by step work instruction .................................................................................................................................... 6
2.1. Visual inspection ............................................................................................................................................... 6
2.2. Assembly the lifeline ......................................................................................................................................... 6
Tasks to perform after the step by step .................................................................................................................. 11
3.1. Housekeeping ................................................................................................................................................. 11
3.2. Fault report ..................................................................................................................................................... 11
Disclaimer of liability and conditions of use ................................................................................................................ 12
Trademarks ................................................................................................................................................................. 12

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 1 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
1. Preface

Preface

1.1. Purpose
This document describes the assembly procedure of the lifeline AGUERRI for the tower service ladder

1.2. Applicability
Product applicability

SG2.X (1) SG2.6 SG3.X SG4.X


(1)
Not included G9X

1.3. Audience
For further information:
► SG Training Web

1.3.1. Technician level

Only a trained technician according to the following instructions is allowed to perform the work
described in this document:
• INS 52959 ON CNS Qualification Management (for internal SGRE resources)
• INS 52960 ON Installation Contractor Qualification Management (for external resources)

1.3.2. Special training for operation


Name of the training Reference of the training
N/A

1.4. Document history


Rev. Ch.Ref. Description
0 Creation of the document, based on:
GD250659-EN OP ASS AGUERRI SAFETY LINE TOWER SG114_R1
GD251132-EN OP ASS AGUERRI SAFETY LINE TOWER SG2.5_R2
GD273857-EN OP ASS SAFETY LINE TOWER SG3.3_R2
GD386913-EN OP ASS AGUERRI SAFETY LINE TOWER SG4.X_R0

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 2 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
1. Preface

1.5. List of external references


Title Reference
Generic / Common documentation

H&S WTG GENERAL ASSEMBLY GD248697-EN

H&S SAFETY INSTRUCTIONS ASSEMBLY SG114 GD248694-EN

H&S SAFETY INSTRUCTIONS ASSEMBLY SG3.3 GD291637-EN

H&S SAFETY INSTRUCTIONS ASSEMBLY SG4.X GD388380-EN

Documentation Set

MPRA ASS AGUERRI SAFETY LINE TOWER SGX.X GD489461-EN

Work instruction / Annex documentation

TIGHT. TORQUE OF STRUC AND ELECTR JOINTS GPS85001

OP ASS LABELS IN SECTIONS SGX.X (ACCORDING TO


GDxxxxxx-EN
ASSEMBLY MANUAL PROJECT)

OP COMMON ASSEMBLY INSTRUCTION SG2.X GD490648-EN

OP COMMON ASSEMBLY INSTRUCTION SG3.X GD490342-EN

OP COMMON ASSEMBLY INSTRUCTION SG4.X GD386960-EN

1.6. Abbreviations and acronyms


Abb. / Acronym Definition
TK Acronym for ToolKit. Toolkit
OD Acronym for Operation Description. User and assembly manual associated with the
toolkit.
N/A Not applicable
PPE Personnel Protective Equipment
MPRA Manufacturing process risk assessment

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 3 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
1. Preface

1.7. PPEs
1.7.1. Mandatory PPE for any task on all sites

Safety Boots Gloves (Standard working protection)

Eye Protection (Safety glasses) Head protection

1.7.2. List of additional PPE

PPE must be worn to work in a turbine according to:


► GD248697-EN H&S WTG GENERAL ASSEMBLY
Only additional PPE other than mandatory PPE will be listed.

Additional PPE list Quantity Comments


Safety harness + 2 safety lanyards with energy 1x worker
absorber device.
Sliding fall arrest device. 1x worker
Head lamp 1x worker
Positioning Lanyard 1x worker
Emergency descent and rescue device 1x work
team

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 4 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
1. Preface

1.8. Tools, consumables, spare parts


1.8.1. Hand tools
Description Part number Qty Comments
Cable cutter, insulated HERR0293
Electrician Scissors with rounded tip HERR0294 1
Tool bucket WLL: 100 kg HERR0543 1
Dynamometric wrench 40-200 Nm (14x18) HERR0124 1
Wrench head 1/2" for Dynamometric wrench 14x18 HERR0096 1
Socket 1/2" 10 mm 1
Socket 1/2" 17 mm 1
Tape measure 5 m HERR0139 1
Ring/fork spanner 10 mm 1
Ring/fork spanner 17 mm HERR0203 1
Diagonal cutters for electromechanics, DIN ISO 5749 HERR0070 1
Dynamometer 200 daN 1

1.8.2. Special tools


Description Part number Qty Comments
N/A

1.8.3. Consumables
Description Part number Qty Comments
AMERICAN TAPE 357 50MMX30M GP029116
Insulate tape black HERR0035
Permanent marker

1.8.4. Spare part components


Description Part number Qty Comments
N/A

1.8.5. Additional resources


Description Part number Qty Comments
N/A

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 5 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction

Step by step work instruction


The operation can only be proceeded with a windspeed lower than:
► 20m/s

2.1. Visual inspection

The inspection of the anchor points of the top of the lifeline must be performed prior to lift the section.

After visual inspection, contact the quality inspector in case of defects

Step 1
Visual inspection. Check:
1. Upper support on upper tower section
• It shall be centered on the first 3 reinforced rungs of the ladder
• Check absence of blows, rust or deformities
2. Absorbing system
• It has not been tampered with
• Check the permanent marker marks on the screws.
3. Cable
• Without crushed, folded, cut, frayed, etc.
• The set and the cable are installed in its position with the mechanical absorbing system; parallel
to the support without bending, downward
4. Lower support or any of its parts is not missing.
5. Abcense of rust on any of the components.

2.2. Assembly the lifeline


The lifeline (A) comes factory-fitted to the upper
tower section, rolled up and secured to the ladder
at the bottom of the section

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 6 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction

Keep the platform hatchway closed while working

Situate the lifeline on the platform avoiding tangled up with any other cable or with the ladder itself

Step 2

Prepare the lifeline for unloading:


6. Cut the cable tie that fix the roll to the ladder
7. Place the lifeline on the platform
8. Keep the registration plates
9. Make a knot at the tip of the rope
• The weight helps its descent through the tower

Never drop the entire roll down the ladder shaft


The impacts could damage tower parts and the cable itself

Unload the registration plates, since they shall be placed on each of the sections together with the rest
of the labels, see OP ASS LABELS IN SECTIONS SGX.X (ACCORDING TO ASSEMBLY MANUAL
PROJECT)

Step 3
Rout the lifeline:
1. Position of the workers during the operation
• 1 worker climbs down to the next platform
• 2 workers lower the lifeline through the hole in the platform (A)
2. Unload the lifeline
• 1 worker begins unrolling the lifeline and
• 1 worker controls the descent
• 1 worker on the next platform collect the tip of the lifeline and must be positioned away from its
projections (B)

Repeat 1, 2 and 3 to lower the lifeline through the remaining platforms until reaching platform
0

3. Check:
• The lifeline is long enough to make a loop and place the cable ties.
• There is no interference along the tower

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 7 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction

Step 3

A: Area to unload the lifeline


B: Storage area of the lifeline during the unload (platform below)

The lower support of the lifeline comes preassembled from the factory, on the lower rungs of the ladder
on the top tower section (together with the lifeline rolled up on the ladder).

Step 4
Lower the remaining components to platform 0
1. Dismount from the ladder on the top section:
• The ladder support of the lifeline, nameplate and tensioner
2. Lower the elements to platform 0
► Follow the steps described at:
Product Code Document description
SG2.X(1) and SG2.6 GD490648-EN OP COMMON ASSEMBLY INSTRUCTION SG2.X
SG3.X GD490342-EN OP COMMON ASSEMBLY INSTRUCTION SG3.X
SG4.X GD386960-EN OP COMMON ASSEMBLY INSTRUCTION SG4.X
(1)
Not included G9X

These rungs must be reinforced with a threaded rod. The lower support must be fitted onto the central
part of the rung so that the welded plate is facing the inside of the ladder.

Review all the welding. Verify that the lower support does not present breakage, pores, blows or
deformities. If so, replace it.

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 8 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction

Step 5
Assembly the lower support of the lifeline:
1. Position the support of the lifeline (A) in the last two reinforced steps under the platform of bottom
section
2. Fitted the support
3. Tighten the support with M6 bolts
► According to GPS85001 TIGHT. TORQUE OF STRUC AND ELECTR JOINTS
4. Mark the torque
► According to GPS85001 TIGHT. TORQUE OF STRUC AND ELECTR JOINTS

A: Support of the lifeline


B: Reinforced steps
_

Step 6
Mounting the cable:
1. Run the cable from the upper area (A) to the lower area (C) through the bushing
2. Keep the nuts loose
3. Check that the screws do not interfere
4. Tighten the lower nut (D) until it touches the lower plate (E)

A: Inlet D: Nut
B: Screws E Plate
C: Outlet

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 9 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
2. Step by step work instruction

Step 7
Tension the cable
1. Pretensioning. Make 3 actions at once:
• Pull the cable (A) + Pull the bushing (B) + Tighten the screws (C)
2. Tensing the lifeline
• Tighten the nut (D) until the fastening is positioned in the middle of max (E) and min (F)
• Use a ring/fork spanner 17 mm
3. Once the indicator is in the work area (H), tighten the second nut to make a locknut with the unit.
4. Place and tape the cable to 8cm from the nut

A: Cable E: Maximum
B: Bushing F: Minimum
C: Screws G: Minimum use
D: Nuts H: Normal position. F spring = 800N

Step 8
Cut the excess lifeline
1. Protect the area to be cut with insulate tape black
• Situate the insulate tape black at 200 mm from the last cable clamps
2. Cut the excess lifeline with diagonal cutter for electromechanics
3. Fasten the free end of the lifeline with insulate tape black
4. Ensure that the spacers guide the lifeline correctly.

Having completed the assembly of the permanent lifeline, it must be certified for its use.

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 10 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
3. Tasks to perform after the step by step

Tasks to perform after the step by step

3.1. Housekeeping
3.1.1. Turbine cleanness

Always keep work area clean. Clean if needed.

3.1.2. Packing up tools

Gather, clean and organize all the tools used during this operation.

3.1.3. Packing up toolkits


After using the toolkits required for this operation, gather and clean them for later use.
Remove the transport toolkits according to the corresponding return operation.
It is also necessary to visually check the condition of each one.

3.1.4. Waste collection


Gather all of the waste generated during this operation (silicone tubes, paper towels, pallets, boxes,
etc.)

Follow site rules for treatment and disposal of refuse.

3.2. Fault report


Report typing errors and/or improvement suggestions (not affecting the described process) via the
email:
► cns.support@siemensgamesa.com

Report technical errors and/or improvement suggestions (affecting the described process) via the
email:
► cns.support@siemensgamesa.com

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 11 / 12
Work Instruction
OP ASS AGUERRI SAFETY LINE TOWER SGX.X
3. Tasks to perform after the step by step

Disclaimer of liability and conditions of use


To the extent permitted by law, neither Siemens Gamesa Renewable Energy A/S nor any of its affiliates in the
Siemens Gamesa group, including Siemens Gamesa Renewable Energy S.A. and its subsidiaries (hereinafter
“SGRE”) give any warranties or representations of any type, either express or implied, as a result of the use of this
document or parts thereof, whether based in contract, in tort (including negligence and strict liability), indemnity, or
any other legal or equitable theory or otherwise by law, as a result of use of this document or parts hereof. The
entire risk of loss, damage, or unsatisfactory performance, no matter how this would arise, including as a result of
negligence, rests with the user. In no event will SGRE be liable for damages, including any direct, general, special,
punitive, incidental, or consequential damages, including, but not limited to, for any loss of power, loss of use, loss
of production, loss of data or information, cost of purchased or replacement power, cost of capital, loss of goodwill,
loss of opportunity, loss of interests, loss of revenue or profit, or claims of customers of the user, arising out of the
use of the document, the inability to use the document, the use of data embodied in or obtained from the
document, or the use of any documentation or other material accompanying the document.
SGRE gives no warranty and makes no representation as to the accuracy, reliability, timeliness, or other features of
any information contained in the document or data obtained from using the document.
The intellectual property rights of this document and any documentation or other material accompanying the
document are and remain the property of SGRE. SGRE reserves the right to update or change this documentation
from time to time without prior notice.
This document is restricted, shall be used only for the purpose for which it is furnished, and shall not be disclosed
to any other party without SGRE’s prior written consent.

Trademarks
All trademarks mentioned herein are the property of their respective owner.

GD489458-EN/0 – Restricted
MDST001_ZWI/003 © Siemens Gamesa Renewable Energy S.A., 2021. All rights reserved. 12 / 12

You might also like