Task Level Risk Assessment - TLRA WORKSHEET

HBS-P-11-HSM-22-06

HAZSCAN (Fire System Installation)


Periode : 28 August - 1 September 2023
Management of Change – (Unplanned Event, new activities, or job steps, change in conditions, new hazards/& or controls)
RESPONSIBLE
CONTROLS
TASK STEPS PERSON
HAZARD For each hazard, list the control measures
List the steps required to perform the task in the (List who is
List the potential hazards that could cause harm. required to eliminate or minimise the risk
sequence they are carried out. responsible to
What can harm me, others, or the environment? What must be in place to prevent or minimise
What am I going to do? implement the
harm?
control)
Permit, toolbox meeting, protect of the edge of SM, SPV and
1. Preparation tools and Material Slip Trip Fall, Sharp Object, Ergonomic Risk,
sharp, PPE HSE

Slip Trip Fall, Sharp Object, Ergonomic Risk, Permit, protect of the edge of sharp, PPE, SM, SPV and
2. Moving / transport material and tools
Flying Object maintain 5S HSE

Permit, protect of the edge of sharp, PPE, SM, SPV and


3. Installing metal conduit, Cable pipe, Work at height, falling object, dust, sharp object,
maintain 5S, full body harness, hand tools HSE
devices ergonomic risk, flying object, electric shock
guarding, training arc flash
Permit, maintain 5S, protect of the edge of sharp, SM, SPV and
4. Installing of wiring Sharp object, ergonomic risk, flying object, dust
set clearance area around work area HSE

SM, SPV and


5. System integration Electric Shock Permit, training arc flash, maintain 5S
HSE
SM, SPV and
6. Housekeeping Bad houskeeping Maintain 5S
HSE

Where a change is made, all personnel to re-sign on the daily sign on page.

Page | 1
TLRA #
Task Level Risk Assessment - TLRA WORKSHEET
HBS-P-11-HSM-22-06

HAZSCAN (VESDA System Installation)


Periode : 28 August - 1 September 2023
Management of Change – (Unplanned Event, new activities, or job steps, change in conditions, new hazards/& or controls)
RESPONSIBLE
CONTROLS
TASK STEPS PERSON
HAZARD For each hazard, list the control measures
List the steps required to perform the task in the (List who is
List the potential hazards that could cause harm. required to eliminate or minimise the risk
sequence they are carried out. responsible to
What can harm me, others, or the environment? What must be in place to prevent or minimise
What am I going to do? implement the
harm?
control)
Permit, toolbox meeting, protect of the edge of SM, SPV and
1. Preparation tools and Material Slip Trip Fall, Sharp Object, Ergonomic Risk,
sharp, PPE HSE

Slip Trip Fall, Sharp Object, Ergonomic Risk, Permit, protect of the edge of sharp, PPE, SM, SPV and
2. Moving / transport material and tools
Flying Object maintain 5S HSE

Permit, protect of the edge of sharp, PPE, SM, SPV and


3. Installing metal conduit, Cable pipe, Work at height, falling object, dust, sharp object,
maintain 5S, full body harness, hand tools HSE
devices ergonomic risk, flying object, electric shock
guarding, training arc flash
Permit, maintain 5S, protect of the edge of sharp, SM, SPV and
4. Installing of wiring Sharp object, ergonomic risk, flying object, dust
set clearance area around work area HSE

Pinch, Hit, scratch, ergonomic risk (low back Permit, PPE, good handling material, FBH, SM, SPV and
5. Installing Support Hanger Pipe
pain), drop object, falling, dust exposure maintains 5S HSE

6. Installing Branch Pipe and Join Vesda Pinch, Hit, scratch, ergonomic risk (low back Permit, PPE, good handling material, FBH, SM, SPV and
Pipe pain), drop object, falling, dust exposure maintains 5S HSE

Pinch, Hit, scratch, ergonomic risk (low back Permit, PPE, good handling material, FBH, SM, SPV and
7. Procedure Test & Commisioning
pain), drop object, falling, dust exposure maintains 5S HSE

Pinch, Hit, scratch, ergonomic risk (low back Permit, PPE, good handling material, FBH, SM, SPV and
8. Installing Vesda Panel
pain), drop object maintains 5S HSE

SM, SPV and


9. System integration Electric Shock Permit, training arc flash, maintain 5S
HSE

SM, SPV and


10. Housekeeping Bad houskeeping Maintain 5S
HSE

Page | 2
TLRA #
Task Level Risk Assessment - TLRA WORKSHEET
HBS-P-11-HSM-22-06

CONSULTATION AND INITIAL SIGN OFF:


I have conducted a HAZSCAN and believe that all HSE hazards have been identified, and the controls listed have reduced the risk to as low as reasonably practicable and will
enable us to effectively manage the hazards of this task. This TLRA has been communicated to me, I understand it, and I agree to work to its intent to the best of my ability.

TLRA attendance record


Name Company Position Signature Date Name of PIC
Agus (SPV of Swahusada) & Mugi
1. Sariaman Honeywell Site Manager 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
2. Naufal Swahusada Safety Personal 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
3. Sodik Swahusada Worker 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
4. Maulana Swahusada Worker 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
5. Misno Swahusada Worker 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
6. Marno Swahusada Worker 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
7. Fauzi Swahusada Worker 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
8. Andri Swahusada Worker 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
9. Heri Swahusada Worker 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
10. Ghalih Honeywell QC 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
11. Tanto Cakrawana Safety Personal 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
12. Marsel Cakrawana Worker 28 August 2023
(SPV of Cakrawana)
Agus (SPV of Swahusada) & Mugi
13. Bagoes Cakrawana Worker 28 August 2023
(SPV of Cakrawana)

Page | 3
TLRA #
Task Level Risk Assessment - TLRA WORKSHEET
HBS-P-11-HSM-22-06

CONSULTATION AND DAILY SIGN OFF:


I have conducted a HAZSCAN and believe that all HSE hazards have been identified and the controls listed have reduced the risk to as low as reasonably practicable and will
enable us to effectively manage the hazards of this task. This TLRA has been communicated to me, I understand it, and I agree to work to its intent to the best of my ability.

TLRA Reinduction Record

Name Work location Date Sign Work location Date Sign Work location Date Sign Work location Date Sign Work location Date Sign
28 August 29 August 30 August 31 August 1 Septem
1. Sariaman Site Office 2023
Site Office 2023
Site Office 2023
Site Office 2023
Site Office 2023
28 August 29 August 30 August 31 August 1 Septem
2. Naufal All Area 2023
All Area 2023
All Area 2023
All Area 2023
All Area 2023
28 August 29 August 30 August 31 August 1 Septem
3. Sodik Colo 1 2023
Colo 1 2023
Colo 1 2023
Colo 1 2023
Colo 1 2023
Colo 1 28 August Colo 1 29 August Colo 1 30 August Colo 1 31 August Colo 1 1 Septem
4. Maulana
2023 2023 2023 2023 2023
Colo 1 28 August Colo 1 29 August Colo 1 30 August Colo 1 31 August Colo 1 1 Septem
5. Misno
2023 2023 2023 2023 2023
Colo 1 28 August Colo 1 29 August Colo 1 30 August Colo 1 31 August Colo 1 1 Septem
6. Marno
2023 2023 2023 2023 2023
28 August 29 August 30 August 31 August 1 Septem
7. Fauzi Admin 2023
Admin 2023
Admin 2023
Admin 2023
Admin 2023
Admin 28 August Admin 29 August Admin 30 August Admin 31 August Admin 1 Septem
8. Andri
2023 2023 2023 2023 2023
Admin 28 August Admin 29 August Admin 30 August Admin 31 August Admin 1 Septem
9. Heri 2023 2023 2023 2023 2023
28 August 29 August 30 August 31 August 1 Septem
10. Ghalih All Area 2023
All Area 2023
All Area 2023
All Area 2023
All Area 2023
28 August 29 August 30 August 31 August 1 Septem
11. Tanto All Area 2023
All Area 2023
All Area 2023
All Area 2023
All Area 2023
Colo 2, 28 August Colo 2, 29 August Colo 2, 30 August Colo 2, 31 August Colo 2, 1 Septem
12. Marsel 2023 2023 2023 2023 2023
Mechplant 2 Mechplant 2 Mechplant 2 Mechplant 2 Mechplant 2
Colo 2, 28 August Colo 2, 29 August Colo 2, 30 August Colo 2, 31 August Colo 2, 1 Septem
13. Bagoes 2023 2023 2023 2023 2023
Mechplant 2 Mechplant 2 Mechplant 2 Mechplant 2 Mechplant 2

Page | 4