FLOOR FINISHING LEGEND- BASEMENT WALL FINISHING LEGEND- BASEMENT SANITARY LEGEND- BASEMENT CEILING FINISHING LEGEND- BASEMENT
LUMINAIRE KEY (FOH-HIGH LEVEL) DRIVER ROOM
BATH R.2
PANTRY-2
SERVICES
SHOWER CHANGING R.
SYMBOL QUANTITY SYMBOL TAGS DESCRIPTION QUANTITY SYMBOL TAGS DESCRIPTION QUANTITY
BATH R.
TURKISH
WASH BASIN 1
25 495 355
115
95
95
ELEVATOR
ORDINARY
152
FLR-FNS-1 WAL-FNS-1 S-B4-01 BAGNODESIGN- BDS-CUB-102611-A-WH
Cube Rectangle Undercounter Wash Basin CLG-GYP-1 SLOP=5.76 %
25
PARKING 04 SHOWER
GYPSUM CEILING
WET
545 178
Undercounter Wash Basin with Overflow SIZE: 545 x 351 x 190 mm CORRIDOR
W.C-1 W.C
13
manufacturer :
FOH-04
70
https://sanipexgroup.com/cube-rectangle-undercounter-wash-basin-bds-cub-102611-a-wh Lamp: LED 3000K, Dali-Dim.
25
+00
B.F.L
295
215
BAGNODESIGN-BDM-TEA-315-CP
CLG-GYP-2 MOISTURE RESISTANT
FLR-FNS-2 MRL-FNS-2 Ø72 Ø72
G 1/2"
194
S-B4-02 Teatro 2 Hole Concealed Basin Mixer-2 Hole Concealed Basin Mixer
without Waste-Spout Length 195 mm
CORRIDOR fridge
SAUNA STEAM
106
B D
15
C
40
-295
TRHD-FNS-3 LMT-FNS-3 S-B4-03 BAGNO DESIGN- ITEM REF NO:ACOMP-000717- Corsair Wall
CLG-GYP-3 BATH R.1
CEILING PANELS
VALVE CHAM.
SUMP PIT PANTRY-1
Mounted WC with Soft Close Seat and Cover- with Fixing kit
Push plate FinishChrome G.T SAND TRAP GYM
MAID'S ROOM-1
1000 R1/2"
SHADOW GAP
▼
▲
15..30
Floor slab
120
15
CLG-SH-01 Shadow profile Type 2- Wall-ceiling
Leveling the final ceiling Plaster / gypsum plasterboard
44
Liquid nails / glue
FLR-FNS-4 MIR-FNS-4
Wall layers :
- Porcelain stoneware or decorative panel Decorative panel
S-B4-04
- T ile adhesive( for a porcelain stoneware)
for Wall Hung WC-Front Operation-Adjustable Dual Flush 6/3L and 4.5/3L
or liquid nails for wood panels
- Tiefen grund primer or analog
- Putty Knauf-Fugen / Analog One layer of 12.5 mm plasterboard.
- Tiefen grund primer or analog 15..30
432
- Reinforcing tape
SETBACK LIMITS
For wall paneling with invisible damper seams
- Putty Knauf-Fugen / Analog Metal frame Knauf
- Knauf plate
92 - Knauf metal frame
44
72 ±0.000 Porcelain Stoneware Shadow gap Type 2
15
15 (tenevoy.eu)
35
320
15..30
▲
Tank Depth 120 mm or Installation in Dry Wall-Galvanized Leg Support Adjustable 40-240 mm aluminum- matt black finish
IMAGE TYPE REF. DESCRIPTIONS QTY.
40
Screed Putty
WATER TANK
with WC Outlet Connector with Fixing Kit
40 ~240
https://sanipexgroup.com/concealed-cistern-for-wall-hung-wc-aqp-k133-a01-esg1
∅110 130/150 Note:
The height of the shadow groove can affect the ability to install the finish floor covering.
This must be taken into account before starting finishing work. Tenevoy Shadow Gap System
www.tenevoy.eu
Page 8
Floor slab
WALL TILE
EPOXY GROUT
CEMENT GROUT
FOH-06b
CEMENT MORTAR BED Knauf metal frame for ceiling
FLR-DTL-5
55
Self-tapping screw
S-B4-05
WATERPROOFING
BAGNO DESIGN- ITEM REF NO:BOS-CA3001-CP-Cube Bidet Spray Kit With 125 Cm Hose
Existing wall
15
Places of cut glass fiber Leveling the final ceiling
Ceiling layers:
- Painting / decorative plaster
- Primer Tiefengrund / Analog
Places of cut glass fiber
5..20
Bidet Spray Set includes: B00475 Paloma Brass Bidet Handspray- CA3000 Brass Fixed Wall
- Finishing putty Rotbant Paste Profi / Analog
- Painting net / fiberglass
Note:
The height of the shadow gap may affect the serviceability of the LED strip. Recommended height of backlit shadow gap -20mm
So that there are no gaps in the joint between the edge of the shadow gap and the ceiling, it is recommended to saw a gap in the ceiling,
to partially bring in the edge of the profile and thereby level the curvature of the ceiling surface
Page 14
Floor slab
GROUT
Floor slab
WALL TILE
AQUADRAIN-AQD-TG-700-SS
Dowel (if necessary)
55
45
(tenevoy.eu)
LED strip (option)
14.3
SOLID BRICK
Existing wall
WAL-DTL-6 With Tile Insert Ceiling niche for lighting the ceiling around the perimeter
Reversible Floor Drain- with Tile Insert- Vertical Outlet Dia. 50 mm-Capacity - 40 l/m Installation sequence:
1. Align the walls
2. Install the Shadow gap TYPE 4 and fix it with dowels
3. Install a metal ceiling frame Knauf (without a stringer)
4. Sew up with 1 layer of plasterboard
5. Prepare the surface of the ceiling for the topcoat using building mixtures
6. Paint / apply decorative plaster on the wall and ceiling
7. If the Shadow profile has a surface for painting, then remove dust from the surface of the profile and apply adhesive primers (
example Sherwin-Williams Multi-Purpose Interior / Exterior Latex Primer / Sealer) and further,
We apply interior moisture-resistant, wear-resistant paint (example Sherwin-Williams Vandal Proof Paint Emerald Interior Acrylic Latex Paint)
aluminum- matt white finish
Tenevoy Shadow Gap System
www.tenevoy.eu
MAIN CONTRACTOR :
T A S M E E M C.
D E S I G N & F I T O U T
Business Bay
1480 Westburry Office Tower, Office 2508
(+971 4) 3251135 ext.107
880 600 1480 1480
info@tasmeemcode.net
www.tasmeemcode.net
79
135
FOH-06a - 2m
FOH-06b - 1.9m
79
0 0
715
S-B4-01
STRUCTURAL ELECTRICAL MECHANICAL
1015
W.C-1
900
900
789
0 0 0
1665
VANITY
VANITY COUNTER
VANITY COUNTER
A
1.88 m
1.88
FOH-04
COUNTER
VANITY COUNTER
m
2030
2030
2030
0.9 sq m
FLR-FNS-1
B D S-B4-02
PROJECT NAME
C MOHAMMED TAMIMI
1150
FOH-06a - 2m
MRL-FNS-2 VILLA,Duabi,UAE
886
S-B4-03
1106
1051
1015
90
S-B4-06
CLIENT NAME
S-B4-06
165 200
200
WC1
S-B4-05 1.48 m
1.49 m 1.48 m
MOHAMMED TAMIMI
165
165
DRAWING TITLE
FLOOR FINISHING LEGEND- BASEMENT WALL FINISHING LEGEND- BASEMENT SANITARY LEGEND- BASEMENT CEILING FINISHING LEGEND- BASEMENT
LUMINAIRE KEY (FOH-HIGH LEVEL) DRIVER ROOM
BATH R.2
PANTRY-2
SERVICES
SHOWER CHANGING R.
SYMBOL QUANTITY SYMBOL TAGS DESCRIPTION QUANTITY SYMBOL TAGS DESCRIPTION QUANTITY
BATH R.
TURKISH
WASH BASIN 1
25 495 355
115
95
95
ELEVATOR
ORDINARY
152
FLR-FNS-1 WAL-FNS-1 S-B4-01 BAGNODESIGN- BDS-CUB-102611-A-WH
Cube Rectangle Undercounter Wash Basin CLG-GYP-1 SLOP=5.76 %
25
PARKING 04 SHOWER
GYPSUM CEILING
WET
545 178
Undercounter Wash Basin with Overflow SIZE: 545 x 351 x 190 mm CORRIDOR
W.C-1 W.C
13
manufacturer :
FOH-04
70
https://sanipexgroup.com/cube-rectangle-undercounter-wash-basin-bds-cub-102611-a-wh Lamp: LED 3000K, Dali-Dim.
25
+00
B.F.L
295
215
BAGNODESIGN-BDM-TEA-315-CP
CLG-GYP-2 MOISTURE RESISTANT
FLR-FNS-2 MRL-FNS-2 Ø72 Ø72
G 1/2"
194
S-B4-02 Teatro 2 Hole Concealed Basin Mixer-2 Hole Concealed Basin Mixer
without Waste-Spout Length 195 mm
CORRIDOR fridge
SAUNA STEAM
106
B D
15
C
40
-295
TRHD-FNS-3 LMT-FNS-3 S-B4-03 BAGNO DESIGN- ITEM REF NO:ACOMP-000717- Corsair Wall
CLG-GYP-3 BATH R.1
CEILING PANELS
VALVE CHAM.
SUMP PIT PANTRY-1
Mounted WC with Soft Close Seat and Cover- with Fixing kit
Push plate FinishChrome G.T SAND TRAP GYM
MAID'S ROOM-1
1000 R1/2"
SHADOW GAP
▼
▲
15..30
Floor slab
120
15
CLG-SH-01 Shadow profile Type 2- Wall-ceiling
Leveling the final ceiling Plaster / gypsum plasterboard
44
Liquid nails / glue
FLR-FNS-4 MIR-FNS-4
Wall layers :
- Porcelain stoneware or decorative panel Decorative panel
S-B4-04
- T ile adhesive( for a porcelain stoneware)
for Wall Hung WC-Front Operation-Adjustable Dual Flush 6/3L and 4.5/3L
or liquid nails for wood panels
- Tiefen grund primer or analog
- Putty Knauf-Fugen / Analog One layer of 12.5 mm plasterboard.
- Tiefen grund primer or analog 15..30
432
- Reinforcing tape
SETBACK LIMITS
For wall paneling with invisible damper seams
- Putty Knauf-Fugen / Analog Metal frame Knauf
- Knauf plate
92 - Knauf metal frame
44
72 ±0.000 Porcelain Stoneware Shadow gap Type 2
15
15 (tenevoy.eu)
35
320
15..30
▲
Tank Depth 120 mm or Installation in Dry Wall-Galvanized Leg Support Adjustable 40-240 mm aluminum- matt black finish
IMAGE TYPE REF. DESCRIPTIONS QTY.
40
Screed Putty
WATER TANK
with WC Outlet Connector with Fixing Kit
40 ~240
https://sanipexgroup.com/concealed-cistern-for-wall-hung-wc-aqp-k133-a01-esg1
∅110 130/150 Note:
The height of the shadow groove can affect the ability to install the finish floor covering.
This must be taken into account before starting finishing work. Tenevoy Shadow Gap System
www.tenevoy.eu
Page 8
Floor slab
WALL TILE
EPOXY GROUT
CEMENT GROUT
FOH-06b
CEMENT MORTAR BED Knauf metal frame for ceiling
FLR-DTL-5
55
Self-tapping screw
S-B4-05
WATERPROOFING
BAGNO DESIGN- ITEM REF NO:BOS-CA3001-CP-Cube Bidet Spray Kit With 125 Cm Hose
Existing wall
15
Places of cut glass fiber Leveling the final ceiling
Ceiling layers:
- Painting / decorative plaster
- Primer Tiefengrund / Analog
Places of cut glass fiber
5..20
Bidet Spray Set includes: B00475 Paloma Brass Bidet Handspray- CA3000 Brass Fixed Wall
- Finishing putty Rotbant Paste Profi / Analog
- Painting net / fiberglass
Note:
The height of the shadow gap may affect the serviceability of the LED strip. Recommended height of backlit shadow gap -20mm
So that there are no gaps in the joint between the edge of the shadow gap and the ceiling, it is recommended to saw a gap in the ceiling,
to partially bring in the edge of the profile and thereby level the curvature of the ceiling surface
Page 14
Floor slab
GROUT
Floor slab
WALL TILE
AQUADRAIN-AQD-TG-700-SS
Dowel (if necessary)
55
45
(tenevoy.eu)
LED strip (option)
14.3
SOLID BRICK
Existing wall
WAL-DTL-6 With Tile Insert Ceiling niche for lighting the ceiling around the perimeter
Reversible Floor Drain- with Tile Insert- Vertical Outlet Dia. 50 mm-Capacity - 40 l/m Installation sequence:
1. Align the walls
2. Install the Shadow gap TYPE 4 and fix it with dowels
3. Install a metal ceiling frame Knauf (without a stringer)
4. Sew up with 1 layer of plasterboard
5. Prepare the surface of the ceiling for the topcoat using building mixtures
6. Paint / apply decorative plaster on the wall and ceiling
7. If the Shadow profile has a surface for painting, then remove dust from the surface of the profile and apply adhesive primers (
example Sherwin-Williams Multi-Purpose Interior / Exterior Latex Primer / Sealer) and further,
We apply interior moisture-resistant, wear-resistant paint (example Sherwin-Williams Vandal Proof Paint Emerald Interior Acrylic Latex Paint)
aluminum- matt white finish
Tenevoy Shadow Gap System
www.tenevoy.eu
MAIN CONTRACTOR :
350 45
45
45
D E S I G N & F I T O U T
MIR-FNS-4
1803
WAL-FNS-1 WAL-FNS-1 DOOR-D1 REV.MARK DATE DRAWN DESCRIPTION
1450
0 0
WAL-DTL-6 WAL-DTL-6
STRUCTURAL ELECTRICAL MECHANICAL
WAL-FNS-1 MRL-FNS-2
3000
3000
3000
3000
4.79 sq m
0 0 0
S-B4-2 WAL-FNS-1
3.48 sq m CHECKED BY DRAWN BY DESIGN BY
S-B4-1
MRL-FNS-2 HANOUF SUJITH HANOUF
FOH-06b-3.3m
220
350
PROJECT NAME
WALL TILE
S-B4-03
130
EPOXY GROUT
CEMENT GROUT MOHAMMED TAMIMI
767
CEMENT MORTAR BED
WATERPROOFING S-B4-05 VILLA,Duabi,UAE
MRL-FNS-2
400
1197
CONCRETE
FOH-06b-3.3m
200
MRL-FNS-2
430
200 50
DRAWING TITLE
GROUT W/C-1
WALL TILE
ADHESIVE
ELEVATIONS -A,B
WATERPROOFING
PLASTER
880 600 SOLID BRICK 165 910 851 104 SCALE : REV. NO. DATE :
1480 2030
AS SHOWN R0 29-05-2023
@ A1
FLOOR FINISHING LEGEND- BASEMENT WALL FINISHING LEGEND- BASEMENT SANITARY LEGEND- BASEMENT CEILING FINISHING LEGEND- BASEMENT
LUMINAIRE KEY (FOH-HIGH LEVEL) DRIVER ROOM
BATH R.2
PANTRY-2
SERVICES
SHOWER CHANGING R.
SYMBOL QUANTITY SYMBOL TAGS DESCRIPTION QUANTITY SYMBOL TAGS DESCRIPTION QUANTITY
BATH R.
TURKISH
WASH BASIN 1
25 495 355
115
95
95
ELEVATOR
ORDINARY
152
FLR-FNS-1 WAL-FNS-1 S-B4-01 BAGNODESIGN- BDS-CUB-102611-A-WH
Cube Rectangle Undercounter Wash Basin CLG-GYP-1 SLOP=5.76 %
25
PARKING 04 SHOWER
GYPSUM CEILING
WET
545 178
Undercounter Wash Basin with Overflow SIZE: 545 x 351 x 190 mm CORRIDOR
W.C-1 W.C
13
manufacturer :
FOH-04
70
https://sanipexgroup.com/cube-rectangle-undercounter-wash-basin-bds-cub-102611-a-wh Lamp: LED 3000K, Dali-Dim.
25
+00
B.F.L
295
215
BAGNODESIGN-BDM-TEA-315-CP
CLG-GYP-2 MOISTURE RESISTANT
FLR-FNS-2 MRL-FNS-2 Ø72 Ø72
G 1/2"
194
S-B4-02 Teatro 2 Hole Concealed Basin Mixer-2 Hole Concealed Basin Mixer
without Waste-Spout Length 195 mm
CORRIDOR fridge
SAUNA STEAM
106
B D
15
C
40
-295
TRHD-FNS-3 LMT-FNS-3 S-B4-03 BAGNO DESIGN- ITEM REF NO:ACOMP-000717- Corsair Wall
CLG-GYP-3 BATH R.1
CEILING PANELS
VALVE CHAM.
SUMP PIT PANTRY-1
Mounted WC with Soft Close Seat and Cover- with Fixing kit
Push plate FinishChrome G.T SAND TRAP GYM
MAID'S ROOM-1
1000 R1/2"
SHADOW GAP
▼
▲
15..30
Floor slab
120
15
CLG-SH-01 Shadow profile Type 2- Wall-ceiling
Leveling the final ceiling Plaster / gypsum plasterboard
44
Liquid nails / glue
FLR-FNS-4 MIR-FNS-4
Wall layers :
- Porcelain stoneware or decorative panel Decorative panel
S-B4-04
- T ile adhesive( for a porcelain stoneware)
for Wall Hung WC-Front Operation-Adjustable Dual Flush 6/3L and 4.5/3L
or liquid nails for wood panels
- Tiefen grund primer or analog
- Putty Knauf-Fugen / Analog One layer of 12.5 mm plasterboard.
- Tiefen grund primer or analog 15..30
432
- Reinforcing tape
SETBACK LIMITS
For wall paneling with invisible damper seams
- Putty Knauf-Fugen / Analog Metal frame Knauf
- Knauf plate
92 - Knauf metal frame
44
72 ±0.000 Porcelain Stoneware Shadow gap Type 2
15
15 (tenevoy.eu)
35
320
15..30
▲
Tank Depth 120 mm or Installation in Dry Wall-Galvanized Leg Support Adjustable 40-240 mm aluminum- matt black finish
IMAGE TYPE REF. DESCRIPTIONS QTY.
40
Screed Putty
WATER TANK
with WC Outlet Connector with Fixing Kit
40 ~240
https://sanipexgroup.com/concealed-cistern-for-wall-hung-wc-aqp-k133-a01-esg1
∅110 130/150 Note:
The height of the shadow groove can affect the ability to install the finish floor covering.
This must be taken into account before starting finishing work. Tenevoy Shadow Gap System
www.tenevoy.eu
Page 8
Floor slab
WALL TILE
EPOXY GROUT
CEMENT GROUT
FOH-06b
CEMENT MORTAR BED Knauf metal frame for ceiling
FLR-DTL-5
55
Self-tapping screw
S-B4-05
WATERPROOFING
BAGNO DESIGN- ITEM REF NO:BOS-CA3001-CP-Cube Bidet Spray Kit With 125 Cm Hose
Existing wall
15
Places of cut glass fiber Leveling the final ceiling
Ceiling layers:
- Painting / decorative plaster
- Primer Tiefengrund / Analog
Places of cut glass fiber
5..20
Bidet Spray Set includes: B00475 Paloma Brass Bidet Handspray- CA3000 Brass Fixed Wall
- Finishing putty Rotbant Paste Profi / Analog
- Painting net / fiberglass
Note:
The height of the shadow gap may affect the serviceability of the LED strip. Recommended height of backlit shadow gap -20mm
So that there are no gaps in the joint between the edge of the shadow gap and the ceiling, it is recommended to saw a gap in the ceiling,
to partially bring in the edge of the profile and thereby level the curvature of the ceiling surface
Page 14
Floor slab
GROUT
Floor slab
WALL TILE
AQUADRAIN-AQD-TG-700-SS
Dowel (if necessary)
55
45
(tenevoy.eu)
LED strip (option)
14.3
SOLID BRICK
Existing wall
WAL-DTL-6 With Tile Insert Ceiling niche for lighting the ceiling around the perimeter
Reversible Floor Drain- with Tile Insert- Vertical Outlet Dia. 50 mm-Capacity - 40 l/m Installation sequence:
1. Align the walls
2. Install the Shadow gap TYPE 4 and fix it with dowels
3. Install a metal ceiling frame Knauf (without a stringer)
4. Sew up with 1 layer of plasterboard
5. Prepare the surface of the ceiling for the topcoat using building mixtures
6. Paint / apply decorative plaster on the wall and ceiling
7. If the Shadow profile has a surface for painting, then remove dust from the surface of the profile and apply adhesive primers (
example Sherwin-Williams Multi-Purpose Interior / Exterior Latex Primer / Sealer) and further,
We apply interior moisture-resistant, wear-resistant paint (example Sherwin-Williams Vandal Proof Paint Emerald Interior Acrylic Latex Paint)
aluminum- matt white finish
Tenevoy Shadow Gap System
www.tenevoy.eu
MAIN CONTRACTOR :
45
350 45
350 45
D E S I G N & F I T O U T
MIR-FNS-4
WAL-FNS-1
4.71 sq m
MIR-FNS-4 R0 29.05.2023 SUJITH FOR APPROVAL
WAL-FNS-1 REV.MARK DATE DRAWN DESCRIPTION
WAL-FNS-1
5.53 sq m
1450
1450
1450
ARCHITECT PROJECT MANAGER
GLASS
0 0
3000
3000
0 0 0
S-B4-2 S-B4-1 CHECKED BY DRAWN BY DESIGN BY
S-B4-1
FOH-06b-3.3m
MRL-FNS-2 MRL-FNS-2 HANOUF SUJITH HANOUF
FOH-06b-3.3m S-B4-2
220
350
PROJECT NAME
EPOXY GROUT
CEMENT GROUT MOHAMMED TAMIMI
170 30
20
CEMENT MORTAR BED
S-B4-05 WATERPROOFING VILLA,Duabi,UAE
MRL-FNS-2 MRL-FNS-2
1200
1200
CONCRETE
10
600
170
LMT-FNS-3 S-B4-03 LMT-FNS-3 CLIENT NAME
FOH-06b-3.3m
850 FOH-06b-3.3m
200 50 200
MRL-FNS-2 MRL-FNS-2
200 50
DRAWING TITLE
GROUT W/C-1
WALL TILE
ADHESIVE
ELEVATIONS -C,D
WATERPROOFING
PLASTER
600 90 325 465 SOLID BRICK 718 1128 185 SCALE : REV. NO. DATE :
1480 2030
AS SHOWN R0 29-05-2023