Professional Documents
Culture Documents
SE IMS R 02 - Continual Improvement Register (2024 2025)
SE IMS R 02 - Continual Improvement Register (2024 2025)
SE IMS R 02 - Continual Improvement Register (2024 2025)
Area Of
Improvement Reason For Improvement/ Details of
Improvement
Category Benefits
(Location)
AVIONICS 5S Storing the Items
PRODUCTION
Producton-Cable Process For manually wire cutting will take excess time
Harness Improvement and excess manpower.
Drinking water IEHS Earlier drinking water was filled in the open area
filling area next to the MD cabin, Due to this water Hygine
& cleanliness was low &this the water quality &
cleanliness was low and the meeting in the
MD's cabin caused a lot of disturbance.
92048A4E.jpg 49DCBB8C.jpg
Process
AVIONICS Improvement Upgradation of Manual Route Card to Digital
PRODUCTION Process and Paper Saving
Process
Improvement Before engraving done in outsource it leads
to time consumption, transport cost,rejection
occuring.
PED Production
After Implementing laser engraving
machine in PED department it helps to
reduce rejection,cost saving,time saving.
Format No.:
Rev. No.:
Rev. Date:
Improvement Status
Recommended for Kaizen
Approved by Action Taken Target Date (Open/
(if Yes, Use Kaizen Report
(Dept. Head) Closed)
Krishna KS Big Rack with bins 2/14/2024 Closed No
placed for storing
the Items
Digital display
system to be 4/1/2024 Open Yes
implemented
6686DE12.jpg
Yes
Nil
No
Improvement Category Status
Improving Product Quality In Progress
Reducing costs Open
Design Improvement Closed
Process Improvement/Upgrade Process Performance
Improve Delivery Times
Customer Satisfaction
Increase Production Efficiency
Avoid Excess Production
Speeding up cycle time
Reduce Process Waste
Waste Reduction
Boosting Employee emgagement
Creating better customer experiences
Upgrade Service Quality
Reduce Billing Cycles
Reducing Communication Issues
Process Visualization (Audit)
Improved Stake Holders & Supplier Relation ships
Safety
Environment