Professional Documents
Culture Documents
Monthly Report - March 2024
Monthly Report - March 2024
of
WSD O&M (RAN Transmission)
(as per Job Description)
Submitted to
Wireless Service Directorate (WSD)
Babarmahal, Kathmandu
Submitted By:
Er. Shree Krishna Khadka
Er. Rupak Pudasaini
Mentors:
Sr. Er. Rubesh Sharma
Sr. Er. Sanjiv Kumar Gupta
March, 2024
1. WSD Transmission Unit (RAN, O&M)
2. Goals Description
This is very useful for identifying patterns in workload, quality and quantity of work performed
and can help in planning resources accordingly. It prompts further investigation into why external
events impacting task volume.
Image shown is a day-to-day track of the count of activities over the month of March 2024. It
depicts the number of tasks handled each day. Each day, transmission related works are performed.
Count-wise, small volume of task may reflect high density of work and large amount of work may
replicate in another day.
This chart quickly conveys the relative importance or time allocation of different tasks within a
job role, which can be useful for understanding job responsibilities, performance evaluations, or
resource allocation.
Overall, understanding the implications of the distribution of work performance metrics on the job
role is essential for optimizing performance, enhancing productivity, and achieving organizational
goals.
This chart is designed to compare the number of jobs handled across different provinces; the length
of the bar indicates the quantity of job handling for that province.
Since, RAN O&M resides in WSD and targeted to monitor and analyze KTM and CDR-TTC
traffic/transmission network of Bagmati Province with utmost priority, it is evident that the number
of jobs handled is largest for Bagmati province among all. Besides, Team Transmission, look after
all Nepal network and assist Provincial Directorate (PDs) to sort out the issues.
Most of the time, regional team’s call is associated with IP/VLAN planning, RTN/OSN and ATN
configuration and NMS support. Along with, work orders are also dispatched to PD and other
telecom offices and IMUs for Radio/ATN link optimization/upgradation and installation.
6. Support Divisional Sections and Offices
The largest segments in the chart are for WSD TRX and WSD FLM each have percentage demand of 27.5%
and 11.8%. WSD transmission unit itself plan and execute urgent transmission related issues and foster
regional team to do so. Further, being in same workspace with FLM team, almost all site issues went
through transmission verification including link establishment, upgradation and ring network management.
Besides, all transmission plan, IP/VLAN management and site support is being provided to regional IMU
team, local offices and provincial directorate. This scenario identifies the areas that may need additional
support or highlight the divisions that are receiving substantial amount of support from WSD Transmission.
https://docs.google.com/spreadsheets/d/15hMwFRsBwCB6KWrcDrECJG6aRzGNQfCgdnxJCPD_sPI/edi
t?usp=sharing
Official Liaison /
S PD/TO/ Goal.Category (From
Date Province Letter/ Focal Major Task Description/Remarks
N IMU Standard JD: Sheet: trxJD)
Mail Contact
KTM993_SalinadiCOW 2G/4G
Sr. Er. 2. MW Link KPI and Sankhu-Salinadi MWR
WSD System Report
1 3/1/2024 Bagmati YES Pradip Utilization/Upgradation/Optimi utilization report analysis.
FLM Verification
Pokhrel zation Analysis (RTN/ATN configuration done
during deployement).
Link status Gongabu-
ATO 1. Microwave and ATN
WSD NMS Monitoring & GongabuBusPark (10G),
2 3/3/2024 Bagmati NO Govinda Network Monitoring, Alarm
OFM Ticketing Ghattekulo-NaxalEX (10G)
Bhattarai Analysis and Troubleshooting
verification and reporting.
4. ATN Service
Sr. Er. Operating
WSD ATN Configuration/Traffic
3 3/4/2024 Bagmati YES Pradip KTM747_PashupatiCOW with
FLM Configuration/Support Shifting/ATN Installation &
Pokhrel site support.
Dismantle/ Link Optimization
WSD
WSD Reporting & 5. KPI Report Verification & Madhesh & Bagmati Province
4 3/4/2024 Bagmati YES Transmis
TRX Documentation Support transmission data update.
sion
4. ATN Service
ATO KTM369_Lamatar1_2G site
WSD ATN Configuration/Traffic
5 3/4/2024 Bagmati NO Arjun down due to fiber issue,
OFM Configuration/Support Shifting/ATN Installation &
Baral restructuring and co-tx done.
Dismantle/ Link Optimization
4. ATN Service
Er. Service shifting from existing
Birgunj Traffic Configuration/Traffic
6 3/4/2024 Madhesh NO Subash RTN radio to
IMU Shifting/Migration Shifting/ATN Installation &
Mehra CDR033_PiluwaCamp ATN.
Dismantle/ Link Optimization
1. Microwave and ATN
WSD DM Rajan RAN/(BSC|RNC) TTCHMBSC01 Migration of 26
7 3/5/2024 Bagmati NO Network Monitoring, Alarm
RAN Sharma Support Sites, Night Activity
Analysis and Troubleshooting
4. ATN Service
KTM102 & KTM060 OM issue
Huawei Er. Nitesh ATN Configuration/Traffic
8 3/5/2024 Bagmati NO due to BSC migration activity,
NOC Jha Configuration/Support Shifting/ATN Installation &
configured with new IP plan.
Dismantle/ Link Optimization
ATO 1. Microwave and ATN Link status Gwarko-
WSD NMS Monitoring &
9 3/5/2024 Bagmati NO Govinda Network Monitoring, Alarm BalkumariTemple (1G)
OFM Ticketing
Bhattarai Analysis and Troubleshooting verfication and reporting.
WSD All Nepal RTN Radio ODU/IDU
WSD Reporting & 5. KPI Report Verification &
10 3/6/2024 Bagmati NO Transmis Mismatch Audit (Work in
TRX Documentation Support
sion Progress)
Operating
4. ATN Service
Sr. Er. KTM999_SallaghariCOW from
WSD RTN/OSN Configuration/Traffic
11 3/8/2024 Bagmati YES Pradip KTM035_Sallaghari for Dharmik
FLM Configuration/Support Shifting/ATN Installation &
Pokhrel Anusthan at
Dismantle/ Link Optimization
SrijananagarGround Bhaktarpur
1. Microwave and ATN Remaining RTN/ATNs
Team Er. Saroj NMS Monitoring &
12 3/8/2024 Bagmati YES Network Monitoring, Alarm integration in U2000 NMS with
CCS Paudel Ticketing
Analysis and Troubleshooting necessary configurations.
CDR593_Helambu Co-Tx done
Team Er. Amit RAN/(BSC|RNC) 6. GSM Sites & Transmission
13 3/10/2024 Bagmati NO and released UL assigned to
CCS K. Shah Support Nodes IP/VLAN Management
new RTN for 4G site.
CDR454_Pakharbas Co-Tx
Team Er. Amit RAN/(BSC|RNC) 6. GSM Sites & Transmission
14 3/11/2024 Bagmati NO done and released UL assigned
CCS K. Shah Support Nodes IP/VLAN Management
to new RTN for 4G site.
CDR048_BharatpurBuspark &
Er.
Bharatp Work Order/Team 5. KPI Report Verification & CDR051_Bijayanagar - packet
15 3/12/2024 Bagmati NO Bigyan
ur IMU Mobilization Support loss rectification and
Bhattarai
restructuring workouts.
Troubleshooting MW/ATN issue
ATO 1. Microwave and ATN operating
WSD RTN/OSN
16 3/13/2024 Bagmati YES Narhari Network Monitoring, Alarm KTM999_SallaghariCOW in
FLM Configuration/Support
Nepal Analysis and Troubleshooting coordination with CCS and
Huawei for configuration.
RAN O&M (RF, GMCC, TRX,
WSD WSD Reporting & 5. KPI Report Verification &
17 3/14/2024 Bagmati YES BSC/RNC/4G, FLME/T) Job
RAN RAN Documentation Support
Description finalization support.
KML file upload on Google
WSD
WSD Reporting & 6. GSM Sites & Transmission Earth as per the transmission
18 3/14/2024 Bagmati YES Transmis
TRX Documentation Nodes IP/VLAN Management data update of
sion
BagmatiPD(!KTM)
Dismantling Ceragon/NEC radio
Er. Bishal 2. MW Link
Hetauda Work Order/Team link and upgradation with high-
19 3/14/2024 Bagmati YES Chaulaga Utilization/Upgradation/Optimi
IMU Mobilization capacity radio, wrok order with
in zation Analysis
MW path profile/IP plan sent.
Dillibazar2-NaxalCTN 10G link
4. ATN Service
ATO ATN Link established hence p2p
WSD Configuration/Traffic
20 3/14/2024 Bagmati NO Govinda Optimization/Upgrada cofiguration done with bgp
OFM Shifting/ATN Installation &
Bhattarai tion configuration at CX via ticket
Dismantle/ Link Optimization
raise.
4. ATN Service CDR-HTD (Hetauda &
WSD
WSD RAN/(BSC|RNC) Configuration/Traffic Bharatpur) sites need to be
21 3/15/2024 Bagmati YES Transmis
TRX Support Shifting/ATN Installation & restructured, sorted out and
sion
Dismantle/ Link Optimization coordinated for the same.
4. ATN Service ATN and MW
WSD
WSD Work Order/Team Configuration/Traffic installation/dismantle work for
22 3/15/2024 Bagmati YES Transmis
TRX Mobilization Shifting/ATN Installation & Dandakharka, Goganpane,
sion
Dismantle/ Link Optimization Pakharbas scheduled.
ATO 1. Microwave and ATN Sukedhara to Chinese Embassy
NMS Monitoring &
23 3/17/2024 Bagmati PD KTM NO Govinda Network Monitoring, Alarm 10G link maintenace and
Ticketing
Bhattarai Analysis and Troubleshooting monitoring.
CDR258_Pasthali site shifting
Dim from old monopole to new GBT,
WSD NMS Monitoring & 6. GSM Sites & Transmission
24 3/17/2024 Bagmati NO Narayan service shifting and ATN port
FLM Ticketing Nodes IP/VLAN Management
Shah mismatch troubleshoots and
monitoring.
4. ATN Service Loss in Gothatar - KhadakGaun
WSD Huawei Traffic Configuration/Traffic 10G link observed, traffic
25 3/17/2024 Bagmati NO
TRX NOC Shifting/Migration Shifting/ATN Installation & rerouted via Khadaka Gau-
Dismantle/ Link Optimization ForceBuspart-Gotatar 1G Link
WSD 2G/3G restructuring guide
WSD RAN/(BSC|RNC) 5. KPI Report Verification &
26 3/18/2024 Bagmati NO Transmis making for CDR-HTD
TRX Support Support
sion (Bharatpur and Hetauda)
4. ATN Service
Er. RTN NMS Migration for Okhreni
Huawei ATN Configuration/Traffic
27 3/19/2024 Bagmati NO Roshan to Newly installed ATN at
NOC Configuration/Support Shifting/ATN Installation &
Shrestha Ratamate_Barabise
Dismantle/ Link Optimization
3. Microwave Link KTM013_Dadhikot -
Er.
WSD RTN/OSN Installation/Dismantle/Mainten KTM462_Chitrapur RTN320
28 3/19/2024 Bagmati NO Sailesh
Project Configuration/Support ance/Service Integration Installation, NMS Integration &
Yadav
Support 2G Support
3. Microwave Link Feasibility analysis for KTM
WSD
WSD Reporting & Installation/Dismantle/Mainten sites running from MW radio by
29 3/19/2024 Bagmati NO Transmis
TRX Documentation ance/Service Integration nearest UG-OFC spare from
sion
Support WCSD FDC.
CDR591_Dandapakhara1 -
3. Microwave Link
ATO CDR797_Dolamsa RTN
WSD RTN/OSN Installation/Dismantle/Mainten
30 3/20/2024 Bagmati NO Rakesh installation and NEC
Project Configuration/Support ance/Service Integration
Giri replacement, RTN/ATN
Support
configuration.
Newly installed stie,
Er. KTM462_Chitrapur, site end
WSD RTN/OSN 6. GSM Sites & Transmission
31 3/20/2024 Bagmati NO Manish configuration mismatched and
Project Configuration/Support Nodes IP/VLAN Management
Shakya UL issue, resolved (Licensing
Part Due)
Most awaited BTS testing with
WCSD, M. Kamal GPON SFP (FTTH) is
Traffic 6. GSM Sites & Transmission
32 3/21/2024 Bagmati Sundhar YES Lamichha successful for Jawalakhel Test
Shifting/Migration Nodes IP/VLAN Management
a ne eNB1 with UMPTb9
transmission unit.
KTM333_Bungmati down due to
ST Ram 1. Microwave and ATN
WSD NMS Monitoring & Sainbu-Bhaisepati-Bungmati
33 3/21/2024 Bagmati NO Nath Network Monitoring, Alarm
FLM Ticketing OFC breakage, OFMT informed
Maharjan Analysis and Troubleshooting
to rectify.
All Bagmati PD transmission
WSD data updated according to
WSD Reporting & 5. KPI Report Verification &
34 3/22/2024 Bagmati NO Transmis physical changes, NMS
TRX Documentation Support
sion integration and correction also
made as per the activity done.
KTM330_Bhaisepati-
KTM333_Bungmati and
ATO 1. Microwave and ATN
WSD NMS Monitoring & KTM330_Bhaisepati-
35 3/22/2024 Bagmati NO Arjun Network Monitoring, Alarm
TRX Ticketing KTM339_Chunikehl ATN links
Baral Analysis and Troubleshooting
verification after maintenance of
the fibre link
4. ATN Service
Er. CDR184_Mahendranagar
Mahend ATN Configuration/Traffic
36 3/24/2024 Madhesh NO Roshan Configuration for OSN
ranagar Configuration/Support Shifting/ATN Installation &
Shrestha previously dismantled.
Dismantle/ Link Optimization
1. Microwave and ATN
PD Er. Bidur VPN Network VPN Credential and U2020
37 3/25/2024 Karnali NO Network Monitoring, Alarm
Surkhet Shawany Management Support
Analysis and Troubleshooting
Er. 1. Microwave and ATN
PD VPN Network VPN Credential and U2020
38 3/25/2024 Karnali NO Rampuja Network Monitoring, Alarm
Surkhet Management Support
n Mahato Analysis and Troubleshooting
4. ATN Service Test BTS transmission
Huawei Er. Nitesh ATN Configuration/Traffic configuration at Babarmahal
39 3/25/2024 Koshi NO
NOC Jha Configuration/Support Shifting/ATN Installation & ATN for EDR sites BSC
Dismantle/ Link Optimization migration work.
INGWA Hydropower Ltd.
3. Microwave Link VLAN:2323 - host site
Sr. Er.
PD RTN/OSN Installation/Dismantle/Mainten EDR586_Sablakhu (Port 2
40 3/25/2024 Koshi NO Sanjib K.
Koshi Configuration/Support ance/Service Integration Faulty). Configured another
Gupta
Support port, require additonal EM6F
card.
4. ATN Service
WSD
WSD ATN Configuration/Traffic ATN configuration with P2P for
41 3/26/2024 Bagmati NO Transmis
TRX Configuration/Support Shifting/ATN Installation & Goganpane and Pakharbas
sion
Dismantle/ Link Optimization
Er.
3. Microwave Link EDR200_Winhi traffic migration
Shreee
Janakpu RTN/OSN Installation/Dismantle/Mainten from NEC to OSN, CX to ATN,
42 3/26/2024 Koshi NO Ram
r IMU Configuration/Support ance/Service Integration Port and BW limitation issue
Rauniyaa
Support resolved.
r
Sr. Er. WDR1168_Nishi (Huawei4G)
Baglung RAN/(BSC|RNC) 6. GSM Sites & Transmission
43 3/27/2024 Gandaki NO Sanotsh configuration at RTN/ATN and
TO Support Nodes IP/VLAN Management
Baral site end support remotely.
ATO 1. Microwave and ATN
Pokhara VPN Network VPN Credential and U2020
44 3/27/2024 Gandaki NO Kumod Network Monitoring, Alarm
IMU Management Support
Mahato Analysis and Troubleshooting
Er. 1. Microwave and ATN CDR669_Krishnappur 3G
Bharatp NMS Monitoring &
45 3/27/2024 Bagmati NO Bigyan Network Monitoring, Alarm Packet Loss issue resolved,
ur IMU Ticketing
Bhattarai Analysis and Troubleshooting spare fiber/OSN managed.
Dy. Mgr. 1. Microwave and ATN Transmission readiness and
WSD NMS Monitoring &
46 3/28/2024 Bagmati YES Dinesh Network Monitoring, Alarm LLD verification for BSC
RAN Ticketing
Yadav Analysis and Troubleshooting Migration on night shift.
3. Microwave Link
ATO Budhiganga4-Midtolichatara
Sudur WSD RTN/OSN Installation/Dismantle/Mainten
47 3/28/2024 NO Kamal RTN320 installation and
Paschim Project Configuration/Support ance/Service Integration
Khatri configuration support.
Support
3. Microwave Link
WSD EDR Tinpaini OSN mgmt down,
WSD RTN/OSN Installation/Dismantle/Mainten
48 3/30/2024 Koshi NO Transmis transmission support to
TRX Configuration/Support ance/Service Integration
sion restructure EDR234 site.
Support
Hotel Mystic Mountain micro
ATO 1. Microwave and ATN
WSD NMS Monitoring & site down from Bhangeri
49 3/30/2024 Bagmati NO GOvinda Network Monitoring, Alarm
FLm Ticketing Durbar, OFC maintenance
Bhattarai Analysis and Troubleshooting
done.
3. Microwave Link RTN link installation for
WSD
WSD RTN/OSN Installation/Dismantle/Mainten optimization and far end change
50 3/31/2024 Bagmati YES Transmis
TRX Installation/Dismantle ance/Service Integration for Dandakharka-Goganpane
sion
Support Ramechhap.
4. ATN Service
WSD
WSD ATN Configuration/Traffic ATN Installation at Nibuwatar
51 3/31/2024 Bagmati YES Transmis
TRX Installation/Dismantle Shifting/ATN Installation & and Pakharbas.
sion
Dismantle/ Link Optimization