Service Migration and Traffic

Shifting Report in AR(ATN) and


IP-MW (RTN310)
--------------

May 2023
Wireless Service Directorate (WSD), Babarmahal
Nepal Telecom (NT)
Nepal Telecom
Wireless Service Directorate

Report
On
Service Migration and Traffic Shifting
In AR(ATN) and IP-MW(RTN310)

By
Operation and Maintenance Department (O&M) - RAN
Wireless Service Directorate (WSD), Babarmahal - Kathmandu

May, 2023

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 1


Team Coordinator
Mr.Sanjeev Kumar Senior Engineer, Wireless Service Directorate
Gupta (WSD), Babarmahal, Kathmandu

Team Members
S.N. Name Designation
1. Shree Krishna Khadka Engineer, WSD
2. Pushpa Badhadur Sunar Engineer, WCSD
3. Cross Kumar Nepali Engineer, WSD
4. Dineswor Chaudhary Lineman, WSD

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 2


1. Background
As per the new network plan based on ATN/IP-RAN devices under WSD and BTD,
the ATN/IP-RAN will upgrade the Layer 2 Network to Layer 3 Network. In this model,
Gateways for all the services are created at each ATN/IP-RAN devices and the services
are integrated to the core via IP-MPLS network. VLAN Carries traffic from Access
Node (BTS, AG, etc.) to the ATN/ IP-RAN device. All the services including 2G, 3G,
4G, ADSL, IMS, SDCBS, Lease, WiMAX, IPCDMA etc. will be integrated to the
ATN/IP-RAN Nodes. IP/VLAN of all the aggregating services shall be changed and
implemented accordingly.

2. Nodes for Service Migration

AR/IP-RAN/IP-MW Site List


SN. AR/IP-RAN List IP MW (if any)
1 KTM287_Silandole-ATN
2 KTM470_Chandanpur-ATN
3 KTM001_PepsicolaTownPlanning-ATN
4 KTM661_Katunje3-ATN
5 KTM397_Thecho2-ATN
6 KTM081_Budhanilkantha-ATN
7 KTM262_Raniban-ATN
8 KTM882_Bodeplanning-ATN
9 KTM017_Gamcha-ATN
10 CDR587_Batase-ATN

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 3


3. Prerequisites
a. Complete VLAN and IP plan for service and management of different services
such as GSM, IMS, ADSL, WiMAX, Lease, OLT, MSAN/MSAG.
b. Site Requirements
❖ Patch Cords of different lengths
❖ LAN/Optical Cable
❖ Optical and Electrical SFPs
c. Logical Requirements
❖ Proper Planning of IP/VLAN for management of new equipment.
❖ Complete configuration plan for all integrating services: GSM, ADSL/IMS,
OLT, WiMAX, MSAN/MSAG etc.
4. Activities to be Performed
a. Check the basic physical installation status of the ATNs and RTNs and
proceed for next steps below after the installation status are deemed ok.
b. Physical Link
i. Fiber / Ethernet Cable Connectivity between Corresponding ATNs and
Switch or OSN or RTN and Service Nodes (BTS,
MSAN/MSAG/WiMAX/IPCDMA)
ii. Ring Connectivity if any.
c. Logical
i. Necessary Configuration for services to be migrated to ATN and
configuration verification.
d. Traffic Shifting
i. Physical/ Logical Traffic Shifting
5. Service Impact: Yes
Service Interruption period per Node (2G, 3G, WiMAX, Lease,
OLT/MSAN/MSAG/IMS): 0-15min
6. Activity Steps
⮚ Inspect the basic physical ATN and RTN installation as per standard.
⮚ Necessary configuration in respective ATN.
⮚ Configuration of corresponding services (BTS, OSN, RTN, WiMax, OLT,
MSAN/MSAG in ATN.
⮚ Restructuring of BTS/WiMAX/IPCDMA BS is required.
⮚ Ping Reachability Test (Gateway and Core Reachability)
⮚ Logical/Physical Traffic Shifting.
⮚ Observation of Service Traffic Statistics before and after the service
migration.
⮚ Pruning unused IP/VLAN from L2/L3 nodes if not required.
⮚ Removal/Shutdown of OSN/RTN and other Microwave Radios whenever
possible.

7. Verification

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 4


All services status verification was done by both NT (respective services) and
Huawei Team. Further the traffic was assessed at corresponding routers for
verification.

8. Conclusion
All identified IP based services were shifted to the corresponding ATNs. All the
services have been shifted to ATN using /30 ip plan. All services after shifting to
ATN are running smoothly. The details for services shifted are attached below.
9. Topology and Service Details
9.1 Manebhanjyang ATN
Service Migration ATN Nodes
1. Manebhanjyang ATN910B
Topology
Existing Topology Topology After Migration

Service Migration Details:


ATN/RTN NODE SITE ID SITE NAME SERVICES STATUS
2G 3G 4G OK
MANEBHANJYANG ATN EDR337 Manebhanjyang MSAN OK
LEASES OK

9.2 Chyasmitar ATN


Service Migration ATN Nodes
1. Chyasmitar ATN910B
Topology
Existing Topology Topology After Migration

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 5


Service Migration Details:
ATN/RTN NODE SITE ID SITE NAME SERVICES STATUS
EDR815 Chyasmitar 2G 4G OK
CHYASMITAR ATN EDR345 Ubun VDC 2G 3G 4G OK
EDR190 Bahunidanda 2G 4G OK

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 6


9.3 Thamkharka ATN
Service Migration ATN and RTN Nodes
1. Thamkharka ATN910B
Topology
Existing Topology Topology After Migration

Service Migration Details


ATN/RTN NODE SITE ID SITE NAME SERVICES STATUS
2G 3G 4G OK
EDR210 Thamkharka
MSAN OK
THAMKHARKA ATN
Damarkhu
EDR902
Shivalaya 2G 4G OK

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 7


9.4 Diyale ATN
Service Migration ATN and RTN Nodes
1. Diyale ATN910B
Topology
Existing Topology Topology After Migration

Service Migration Details

ATN/RTN NODE SITE ID SITE NAME SERVICES STATUS


EDR334 Diyale 2G 4G OK
DIYALE ATN EDR203 Kharpa 2G 4G OK
EDR775 Dubekol Danda 2G 4G OK

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 8


9.5 Bamrang ATN
Service Migration ATN and RTN Nodes
1. Bamrang ATN910C-G

Topology
Existing Topology Topology After Migration

Service Migration Details:


ATN/RTN NODE SITE ID SITE NAME SERVICES STATUS

BAMRANG ATN EDR192 Bamrang 2G 4G OK

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 9


9.6 Aiselukharka
Service Migration ATN and RTN Nodes
1. Aiselukharka ATN910B
Topology
Existing Topology Topology After Migration

Service Migration Details


ATN/RTN NODE SITE ID SITE NAME SERVICES STATUS
2G 4G OK
EDR804 Aiselukharka
AISELUKHARKA ATN MSAN OK
EDR805 Rukupai_Devisthan 2G 4G OK

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 10


9.7 Sapteshwor_Chitapokhari ATN
Service Migration ATN and RTN Nodes
1. Sapteshwor_Chitapokhari ATN910B

Topology
Existing Topology Topology After Migration

Service Migration Details


ATN/RTN NODE SITE ID SITE NAME SERVICES STATUS
EDR207 Sapteshwor_Chitapokhari 2G 4G OK
SAPTESHWOR
EDR205 Patheka VDC 4G OK
CHITAPOKHARI ATN
EDR728 Phedi 2G OK
EDR903 Kharmi 2G 4G OK

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 11


9.8 Devisthan ATN
Service Migration ATN and RTN Nodes
1. Devisthan ATN910B

Topology
Existing Topology Topology After Migration

Service Migration Details


ATN/RTN NODE SITE ID SITE NAME SERVICES STA
EDR198 Devisthan 2G 4G O
EDR204 Martim Birta 2G 4G O
DEVISTHAN_KALIKABHAGWATI ATN
EDR194 Batase 2G 4G O
EDR900 BaajeChyangdada 2G 4G O
EDR901 Dorpa Ahale 2G 4G O

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 12


9.9 Batase VDC ATN
Service Migration ATN and RTN Nodes
1. Batase VDC ATN910B

Topology
Existing Topology Topology After Migration

Service Migration Details


ATN/RTN NODE SITE ID SITE NAME SERVICES STATU
EDR194 Batase vdc 2G 4G OK
BATASE VDC ATN
EDR631 Laphagaun 2G 4G OK

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 13


9.10 Birendra Park ATN
Service Migration ATN and RTN Nodes
1. Birendra Park ATN910C-G
Topology
Existing Topology Topology After Migration

Service Migration Details


ATN/RTN NODE SITE ID SITE NAME SERVICES STATUS
EDR332 Birendra Park 2G 3G 4G OK
Rampur
EDR735 2G 4G OK
Okhaldhunga
BIRENDRA PARK
OKHALDHUNGA ATN
EDR332 Rampur 2G 3G 4G OK
EDR330 Balakhu 2G 4G OK
EDR798 Tholedimba 2G 3G 4G OK
EDR808 Jyamire 2G 4G OK

NT 4G/LTE project is spanning at an alarming rate and reaching its milestone today. In
the same vein, new eNodeBs are being installed physically/logically all over the nation.
During the installation, the respective eNodeBs are being uplinked from Fiber and
Radio links from existing GSM sites of 10M (4.8M and 5.2M) project. In the same vein,
the NE devices (L2 Switches: OSN550, RTN905/910, ONU and L3 Switches/Router)
are essentially used to provide and uplink transmission for such eNodeBs. But, more
than 500 standalone (existing) sites still have no extra fiber/ethernet uplink to eNodeBs
all over Nepal. Meanwhile, the UL shortcomings in such eNodeBs are recorded and
reported for any other unavailability of services by OFC Maintenance Crew: WSD-

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 14


ONM for KTM and by respective IMU/Filed Maintenance Team at regional level as
requested by eNodeB integration plan.

Figure 1: Co-Transmission Feature Use


As a matter of solution, each site where 2G (GSM) and 3G (WCDMA/UMTS)
both exists (with own fiber/ethernet link), they have been up-linked via single
transmission link of 3G in cascade. This necessitate a special feature in transmission
through logical integration and hence is being done via Co-BTS Transmission Scheme.
During the process: 2G (GTMU Card) and 3G (WMPT/UMPT Card) is being
patched/short via fiber (FE1-FE1)/ethernet link (FE0-FE0) without hampering ongoing
3G services at all. After successful co-transmission the early released fiber/ethernet link
have been provided as an uplink for new 4G/LTE eNodeBs. This enthusiasm is being
carried out under the mutual workmanship of NT 4G/LTE Project team with BTD and
WSD-ONM: Transmission/RAN by the technical support from Huawei alongside and
field support from CCSI at the same time. This ongoing work has led to:
a) provide an uplink to new 4G/LTE eNodeB in scarce transmission network,
b) provide a robust transmission link to multiple services (2G and 3G).
c) reduce the number of UL fiber/ethernet and eSFPs requirement,
d) reduce the number of devices in L2 aggregation.
e) provide new P2P IP plan region wise, thereby assisting IP restructuring task
also.
2. Co-BTS Transmission Scope
Co-BTS Transmission plan was based on following requirements.

a) The sites where 4G/LTE integration is planned.


b) Sites with no extra OFC and/or with broken OFC.
c) Sites with fully occupied MW radio uplink.
d) Sites with OSN removal plan with ATN 910 B/C.

3. Co-BTS Transmission Process


The existing sites of 10M (4.8M + 5.2M) are being observed based on eNodeB
(4G/LTE) integration plan and confirmed for Co-BTS transmission if there exist no
availability of an uplink for new eNodeBs. The physical configuration is made promptly
on site while logical configuration has been done in respective BSC and RNC.
Apparatus required such as ETH cable and/or LC-LC Patch Chord with eSFPs pair are
being managed to CCSI filed team from NT-Project and WSD-ONM. WSD-
Transmission and BTD has provided additional support for transmission plan and route
addition accordingly wherein the testing and verification of each services is being
carried out by WSD-BSC. The list of Co-BTS sites along with all necessary details are
attached herewith for further analysis.
Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 15
4. Summary of Co-BTS Transmission
The summary of Co-BTS transmission is presented in table below. All sites
were configured in respective BSCs/RNCs and included under the cluster named Co-
BTS Group. The existing IP of 2G BTSs has been changed to new IP plan (in .../30
subnet IP), making existing 3G as a next hop (2G-Gateway). During the process,
running 3G services were not even hampered at all level of execution, while in case of
Co-BTS failure, alternative plans were applied. The details of the Co-BTS transmission
have been attached in the annexes along with this report.

SN NE Type NE Count Co-BTS Count Co-BTS Alternatives


1 2G/3G 50 40 10
Table 1: Co-BTS Update (Lot – II)
5. Annexes:
i) ANNEX - I: Region wise IP plan for Co-BTS transmission.
ii) ANNEX - II: Summary of total sites gone through Co-BTS transmission.
iii) ANNEX – III: Detail Information of Co-BTS Sites.

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 16


ANNEX - I: Region wise IP plan for Co-BTS transmission
Primarily, it was observed that more than 500 sites may require Co-BTS transmission.
To cater this demand ../24 network has been divided into ../30, creating an IP pool for
each region culminating 512 distinct IPs, wherein 2 host IPs were assigned for 2G and
3G respectively on existing sites. The region wise IP plan have been implemented in
following way.
10.14.64.0/24 10.14.65.0/24 10.14.66.0/24 10.14.67.0/24 10.14.68.0/24 10.14.69.0/24 10.14.70.0/24 10.14.71.0/2

KTM WDR-POK WDR-BUT CDR-HTD CDR-TTC EDR MWDR FWDR


10.14.64.0/30 10.14.65.0/30 10.14.66.0/30 10.14.67.0/30 10.14.68.0/30 10.14.69.0/30 10.14.70.0/30 10.14.71.0/3

10.14.64.0 10.14.65.0 10.14.66.0 10.14.67.0 10.14.68.0 10.14.69.0 10.14.70.0 10.14.71.0


10.14.64.4 10.14.65.4 10.14.66.4 10.14.67.4 10.14.68.4 10.14.69.4 10.14.70.4 10.14.71.4
10.14.64.8 10.14.65.8 10.14.66.8 10.14.67.8 10.14.68.8 10.14.69.8 10.14.70.8 10.14.71.8
10.14.64.12 10.14.65.12 10.14.66.12 10.14.67.12 10.14.68.12 10.14.69.12 10.14.70.12 10.14.71.12
10.14.64.16 10.14.65.16 10.14.66.16 10.14.67.16 10.14.68.16 10.14.69.16 10.14.70.16 10.14.71.16
10.14.64.20 10.14.65.20 10.14.66.20 10.14.67.20 10.14.68.20 10.14.69.20 10.14.70.20 10.14.71.20
10.14.64.24 10.14.65.24 10.14.66.24 10.14.67.24 10.14.68.24 10.14.69.24 10.14.70.24 10.14.71.24
10.14.64.28 10.14.65.28 10.14.66.28 10.14.67.28 10.14.68.28 10.14.69.28 10.14.70.28 10.14.71.28
10.14.64.32 10.14.65.32 10.14.66.32 10.14.67.32 10.14.68.32 10.14.69.32 10.14.70.32 10.14.71.32
10.14.64.36 10.14.65.36 10.14.66.36 10.14.67.36 10.14.68.36 10.14.69.36 10.14.70.36 10.14.71.36
10.14.64.40 10.14.65.40 10.14.66.40 10.14.67.40 10.14.68.40 10.14.69.40 10.14.70.40 10.14.71.40
10.14.64.44 10.14.65.44 10.14.66.44 10.14.67.44 10.14.68.44 10.14.69.44 10.14.70.44 10.14.71.44
10.14.64.48 10.14.65.48 10.14.66.48 10.14.67.48 10.14.68.48 10.14.69.48 10.14.70.48 10.14.71.48
10.14.64.52 10.14.65.52 10.14.66.52 10.14.67.52 10.14.68.52 10.14.69.52 10.14.70.52 10.14.71.52
10.14.64.56 10.14.65.56 10.14.66.56 10.14.67.56 10.14.68.56 10.14.69.56 10.14.70.56 10.14.71.56
10.14.64.60 10.14.65.60 10.14.66.60 10.14.67.60 10.14.68.60 10.14.69.60 10.14.70.60 10.14.71.60
10.14.64.64 10.14.65.64 10.14.66.64 10.14.67.64 10.14.68.64 10.14.69.64 10.14.70.64 10.14.71.64
10.14.64.68 10.14.65.68 10.14.66.68 10.14.67.68 10.14.68.68 10.14.69.68 10.14.70.68 10.14.71.68
10.14.64.72 10.14.65.72 10.14.66.72 10.14.67.72 10.14.68.72 10.14.69.72 10.14.70.72 10.14.71.72
10.14.64.76 10.14.65.76 10.14.66.76 10.14.67.76 10.14.68.76 10.14.69.76 10.14.70.76 10.14.71.76
10.14.64.80 10.14.65.80 10.14.66.80 10.14.67.80 10.14.68.80 10.14.69.80 10.14.70.80 10.14.71.80
. . . . . . . .
. . . . . . . .
10.14.64.248 10.14.65.248 10.14.66.248 10.14.67.248 10.14.68.248 10.14.69.248 10.14.70.248 10.14.71.248
10.14.64.252 10.14.65.252 10.14.66.252 10.14.67.252 10.14.68.252 10.14.69.252 10.14.70.252 10.14.71.252

Table 2: Region wise IP distribution for Co-BTS Transmission

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 17


ANNEX II: Summary of Co-BTS Sites

SN Site ID Site Name Region Remarks


1 CDR104 Shaktikhor CDR_HTD Succeeded
2 CDR199 ThapaGaun CDR_HTD Succeeded
3 CDR225 Bhakundebesi CDR_TTC Succeeded
4 CDR320 Chowkitole CDR_HTD Succeeded
5 CDR204 Charikot CDR_TTC Succeeded
6 EDR241 BRT NP_7 EDR Succeeded
7 EDR291 Prativa Chwok EDR Succeeded
8 EDR312 Tankisinuwari1 (Kharji) EDR Succeeded
9 EDR339 Okhaldhunga Bazar EDR Succeeded
10 EDR420 Siraha Road EDR Succeeded
11 EDR448 Mirchaiya Bazar EDR Succeeded
12 EDR477 Phaplu EDR Succeeded
13 EDR118 Damak_NP4 EDR Succeeded
14 EDR120 Damak_NP2 EDR Succeeded
15 EDR527 InaruwaChowk EDR Succeeded
16 KTM302 Swoyambhu KTM Succeeded
17 KTM316 Tinkune KTM Succeeded
18 KTM326 Bagdol KTM Succeeded
19 KTM331 Bhaisipati KTM Succeeded
20 KTM484 Kalimati KTM Succeeded
21 KTM551 EducationMinistry KTM Succeeded
22 KTM837 Seshmati KTM Succeeded
23 KTM360 Imadol KTM Succeeded
24 KTM779 SitapailaSristiColony KTM Succeeded
25 KTM040 Sudal2 KTM Succeeded
26 KTM347 SuechatarGaneshSchool KTM Succeeded
27 KTM159 KalankiChwok2 KTM Succeeded
28 KTM381 Pulchowk KTM Succeeded
29 KTM395 Thasikhel KTM Succeeded
30 KTM106 DhapashiHeight KTM Succeeded
31 KTM352 GokarnaResort KTM Succeeded
32 MWDR119 Shreenagar MWDR Succeeded
33 MWDR153 GADHI MWDR Succeeded
34 WDR477 SWATHI-1 WDR_BUT Succeeded
35 WDR498 Gairigaun WDR_BUT Succeeded
36 WDR513 Palpa4_Myaldar WDR_BUT Succeeded
37 WDR593 Jyotinagar WDR_BUT Succeeded
38 FWDR061 KailaliChisapani FWDR Succeeded
39 CDR194 Sapahi_Highway CDR_HTD Succeeded
40 WDR227 Rajpur WDR_BUT Succeeded
41 FWDR019 PokharaBazar FWDR Co-BTS Alternative
42 KTM383 SachalSanepa KTM Co-BTS Alternative

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 18


43 KTM392 SomenJwagal (IOE ONU) KTM Co-BTS Alternative
44 KTM261 Ramkot KTM Co-BTS Alternative
45 KTM381 Pulchwok KTM Co-BTS Alternative
46 KTM282 ShivapuriArmyStaffCollege KTM Co-BTS Alternative
47 KTM265 RBBank KTM Co-BTS Alternative
48 KTM011 Chyamasingh KTM Co-BTS Alternative
49 CDR160 Devpura CDR_HTD Co-BTS Alternative
50 CDR725 Chaubiskothi CDR_HTD Rolled Back/Not Succeeded

Table 3: Summary of Sites gone through Co-BTS Transmission

Table 4: Co-BTS Transmission (Lot - II) Update

# Note:

1. While going through Co-BTS attempt, some of the sites failed in Co-BTS execution
sometimes due to the high pack loss in that transmission network or sometimes by
unidentified/mismatched transmission route. On those particular cases, extra OSN
or even an ATN along with supplementary fiber/ethernet uplinks were managed for
new eNodeBs.

2. The assigned IPs prior to Co-BTS for failed cases are retained in the pool and
reserved for further reuse.

Service Migration and Traffic Shifting in AR(ATN) and IP-MW(RTN-310) 19


ANNEX III: Detail Information of Co-BTS Sites.

SN Site ID Site Name Region Network IP 3G S-IP 3G SVLAN L3 Point Date


1 CDR104 Shaktikhor CDR_HTD 10.14.67.56/30 10.11.179.203 1315 Tandi-CX600 04-Feb-20
2 CDR199 ThapaGaun CDR_HTD 10.14.67.36/30 - Janakpur-CX600 30-Dec-19
3 CDR225 Bhakundebesi CDR_TTC 10.14.68.0/30 10.12.147.196 3301 Phulchowki-S9303 26-Jan-20
4 CDR320 Chowkitole CDR_HTD 10.14.67.0/30 - Hetauda-M6K8S 12-Jan-20
5 CDR204 Charikot CDR_TTC 10.14.68.8/30 10.12.141.99 3326 Phulchowki-S9303 20-Mar-20
6 EDR241 BRT NP_7 EDR 10.14.69.0/30 10.12.185.131 3236 Biratnagar-CX600 13-Jan-20
7 EDR291 Prativa Chwok EDR 10.14.69.16/30 10.12.188.7 3261 Biratnagar-CX600 23-Jan-20
8 EDR312 Tankisinuwari1 (Kharji) EDR 10.14.69.8/30 10.12.206.197 3491 Itahari-CX600 23-Jan-20
9 EDR339 Okhaldhunga Bazar EDR 10.14.69.24/30 10.12.203.33 3411 Rajbiraj-CX600 27-Jan-20
10 EDR420 Siraha Road EDR 10.14.69.44/30 10.12.203.246 3421 Rajbiraj-CX600 28-Jan-20
11 EDR448 Mirchaiya Bazar EDR 10.14.69.48 10.12.191.7 3471 Choharwa-CX600 28-Jan-20
12 EDR477 Phaplu EDR 10.14.69.40/30 10.12.206.99 3486 Lahan-CX600 29-Jan-20
13 EDR118 Damak_NP4 EDR 10.14.69.56/30 10.12.191.99 3436 Damak-CX600 14-Mar-20
14 EDR120 Damak_NP2 EDR 10.14.69.52/30 10.12.191.101 3436 Damak-CX600 14-Mar-20
15 EDR527 InaruwaChowk EDR 10.14.69.12/30 10.12.197.195 3456 Inaruwa-CX600 09-Apr-20
16 KTM302 Swoyambhu KTM 10.14.64.152/30 10.12.46.237 3210 Chhauni CX600 28-Jan-20
17 KTM316 Tinkune KTM 10.14.64.104/30 10.12.57.171 3388 TTC S9312 09-Jan-20
18 KTM326 Bagdol KTM 10.14.64.28/30 10.12.48.164 - Patan S9312 29-Dec-19
19 KTM331 Bhaisipati KTM 10.14.64.144/30 10.12.49.3 3261 Bhaisepati CX600 30-Jan-20
20 KTM484 Kalimati KTM 10.14.64.48/30 10.12.46.242 3210 Chhauni CX600 06-Jan-20
21 KTM551 EducationMinistry KTM 10.14.64.128/30 10.12.57.106 3382 TTC S9312 14-Jan-20
22 KTM837 Seshmati KTM 10.14.64.8/30 10.12.47.113 3222 Gongabu CX600 03-Jan-20
23 KTM360 Imadol KTM 10.14.64.16/30 10.12.48.233 3258 Patan S9312 07-Feb-20
24 KTM779 SitapailaSristiColony KTM 10.14.64.52/30 10.12.46.249 3210 Chhauni CX600 10-Feb-20
25 KTM040 Sudal2 KTM 10.14.64.172/30 10.12.54.1 3304 Bhaktapur CX600 28-Feb-20
26 KTM347 SuechatarGaneshSchool KTM 10.14.64.180/30 10.12.46.201 3207 Chhauni CX600 01-Mar-20
27 KTM159 KalankiChwok2 KTM 10.14.64.176/30 10.12.46.203 3207 Chhauni CX600 04-Mar-20
28 KTM381 Pulchowk KTM 10.14.64.72/30 10.13.144.14 4032 Patan S9312 18-Mar-20
29 KTM395 Thasikhel KTM 10.14.64.188/30 10.12.48.175 3252 Patan S9312 18-Mar-20
30 KTM106 DhapashiHeight KTM 10.14.64.192/30 10.12.55.102 3334 Hattigauda CX600 17-Mar-20
31 KTM352 GokarnaResort KTM 10.14.64.200/30 10.12.54.104 3310 Chabahil s9312 29-Mar-20
32 MWDR119 Shreenagar MWDR 10.14.70.8/30 - Tulsipur_S9306 29-Dec-19
33 MWDR153 GADHI MWDR 10.14.70.4/30 - Ranimatta ATN 29-Dec-19
34 WDR477 SWATHI-1 WDR_BUT 10.14.66.32/30 10.80.62.120 3291 Parasi-CX600 17-Jan-20
35 WDR498 Gairigaun WDR_BUT 10.14.66.48/30 10.80.65.102 3341 Tansen-S9306 13-Jan-20
36 WDR513 Palpa4_Myaldar WDR_BUT 10.14.66.52/30 10.80.65.106 3341 Tansen-S9306 13-Jan-20
37 WDR593 Jyotinagar WDR_BUT 10.14.66.76/30 10.80.62.74 3281 Butwal-CX600 20-Jan-20
38 FWDR061 KailaliChisapani FWDR 10.14.71.4/30 10.12.233.237 3396 Lamki-CX600 18-May-20
39 CDR194 Sapahi_Highway CDR_HTD 10.14.67.8/30 10.11.252.168 1406 Janakpur-CX600 05-Jun-20
40 WDR227 Rajpur WDR_BUT 10.14.66.4/30 10.80.62.165 3311 Gorusinghe-CX600 11-Jun-20
41 FWDR019 PokharaBazar FWDR 10.14.71.0/30 10.12.230.229 3236 Dadeldhura-CX600 10-Mar-20
42 KTM383 SachalSanepa KTM IP Retained 10.13.144.30 4031 Patan S9312 30-Jan-20
43 KTM392 SomenJwagal KTM IP Retained 10.13.144.18 4033 Patan S9312 30-Jan-20
44 KTM261 Ramkot KTM IP Retained 10.12.46.234 3210 Chhauni CX600 09-Feb-20
45 KTM381 Pulchwok KTM IP Retained 10.13.144.14 4032 Patan S9312 11-Mar-20
46 KTM282 ShivapuriArmyStaffCol KTM IP Retained 10.12.55.73 3331 Hattigauda CX600 01-Mar-20
47 KTM265 RBBank KTM IP Retained 10.12.56.163 3364 Sundhara s9312 18-Mar-20
48 KTM011 Chyamasingh KTM IP Retained 10.12.54.5 3304 Bhaktapur CX600 Progressing
49 CDR160 Devpura CDR_HTD IP Retained 10.11.252.200 1411 Janakpur-CX600 09-Jan-20
50 CDR725 Chaubiskothi CDR_HTD IP Retained 10.11.179.29 1301 Bharatpur-CX600 10-Jan-20

Table 5: Co-BTS Site Details