Professional Documents
Culture Documents
June 2020 MS
June 2020 MS
June 2020 MS
November 2020
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body.
We provide a wide range of qualifications including academic, vocational, occupational and
specific programmes for employers. For further information visit our qualifications websites
at www.edexcel.com or www.btec.co.uk. Alternatively, you can get in touch with us using the
details on our contact us page at www.edexcel.com/contactus.
Pearson aspires to be the world’s leading learning company. Our aim is to help everyone
progress in their lives through education. We believe in every kind of learning, for all kinds
of people, wherever they are in the world. We’ve been involved in education for over 150
years, and by working across 70 countries, in 100 languages, we have built an international
reputation for our commitment to high standards and raising achievement through
innovation in education. Find out more about how we can help you and your students at:
www.pearson.com/uk
November 2020
Publications Code 4MA1_2H_2011_MS
All the material in this publication is copyright
© Pearson Education Ltd 2021
PMT
• All candidates must receive the same treatment. Examiners must mark the
first candidate in exactly the same way as they mark the last.
• Mark schemes should be applied positively. Candidates must be rewarded
for what they have shown they can do rather than penalised for omissions.
• Examiners should mark according to the mark scheme not according to
their perception of where the grade boundaries may lie.
• There is no ceiling on achievement. All marks on the mark scheme should
be used appropriately.
• All the marks on the mark scheme are designed to be awarded. Examiners
should always award full marks if deserved, i.e. if the answer matches the
mark scheme.
Examiners should also be prepared to award zero marks if the candidate’s
response is not worthy of credit according to the mark scheme.
• Where some judgement is required, mark schemes will provide the
principles by which marks will be awarded and exemplification may be
limited.
• When examiners are in doubt regarding the application of the mark
scheme to a candidate’s response, the team leader must be consulted.
• Crossed out work should be marked UNLESS the candidate has replaced it
with an alternative response.
• Types of mark
o M marks: method marks
o A marks: accuracy marks
o B marks: unconditional accuracy marks (independent of M marks)
• Abbreviations
o cao – correct answer only
o ft – follow through
o isw – ignore subsequent working
o SC - special case
o oe – or equivalent (and appropriate)
o dep – dependent
o indep – independent
o awrt – answer which rounds to
o eeoo – each error or omission
PMT
• No working
If no working is shown then correct answers normally score full marks
If no working is shown then incorrect (even though nearly correct) answers
score no marks.
• With working
If there is a wrong answer indicated on the answer line always check the
working in the body of the script (and on any diagrams), and award any
marks appropriate from the mark scheme.
If it is clear from the working that the “correct” answer has been obtained
from incorrect working, award 0 marks.
If a candidate misreads a number from the question. Eg. Uses 252 instead
of 255; method marks may be awarded provided the question has not been
simplified. Examiners should send any instance of a suspected misread to
review. If there is a choice of methods shown, mark the method that leads
to the answer on the answer line; where no answer is given on the answer
line, award the lowest mark from the methods shown.
If there is no answer on the answer line then check the working for an
obvious answer.
• Parts of questions
Unless allowed by the mark scheme, the marks allocated to one part of the
question CANNOT be awarded to another.
PMT
2 a 50 < L ≤ 60 1 B1 oe eg 50 - 60
b 25 × 6 + 35 × 26 + 45 × 31 + 55 × 40 + 65 × 17 M2 For correct products using
(150 + 910 + 1395 + 2200 + 1105)(= 5760) midpoints (allow one error) with
intention to add. M1 for products
using frequency and a consistent
value within the range (allow one
error) with intention to add or
correct products using midpoints
(allow one error) without addition
“5760” ÷ “120” M1 dep on M1
48 4 A1
Total 5 marks
PMT
3 ADC = 180 – 58 (= 122) or EDF = 122 M1 may be seen marked on the diagram
or CDE = 58 or ADF = 58
e.g. DEF = 58 ÷ 2 or M1 complete method to find angle DEF
DEF = (180 – 122) ÷ 2
29 A1
Total 5 marks
Total 4 marks
PMT
b for 0.15 × 750 000 oe (=112 500) OR M1 For method to find or M2 for 750 000 ×
or 0.85 × 750 000 oe (=637 500) depreciation for 1 year 0.853 (= 460 593.75)
or value after 1 year or 750 000 × 0.854
0.85 × “637 500” oe (= 541 875) 750 000 M1 for completing method (= 391 504.69)
0.85 × “541 875” oe(= 460 593.75) × 0.853
(M1 for 750 000 ×
0.852 (= 541 875)
460 594 3 A1 accept 460 593 – 460 594
6 M1 for y = 3x + c oe or y = mx – 2 oe or 3x – 2 or
eg L = 3x – 2 or y = 3(x ± a)
y = 3x − 2 2 A1 oe eg y – 4 = 3(x – 2)
y – 1 = 3(x – 1)
y – a = 3(x – b) where (a, b) is any
coordinate on the line
Total 2 marks
Total 3 marks
8 4 M1 82 + 8.52 − 8.52
8.52 – (8 ÷ 2)2 (= 56.25) or cos x = oe or eg cos A =
8.5 2 8 8.5
4 M1 82 + 8.52 − 8.52
"56.25" (= 7.5) or x = cos −1 (= 61.927...) or eg ( A =) cos −1 (61.927...)
8.5 2 8 8.5
oe (other angle = 56.144...)
8 × “7.5” ÷ 2 oe or 0.5 × 8 × 8.5 × sin “61.927...” M1 or eg 0.5 × 8.5 × 8 × sin”61.927...” oe
30 4 A1
Total 4 marks
PMT
9 π × 32 × h = 72π oe M1 22
Allow use of 3.14... or for π
7
and use of 226... for 72π
If not B2 then B1
for 5 or 6 (ft from a table with only one arithmetic error)
of their points at ends of intervals and joined with curve or
line segments
13 e.g. x = 0.681 and 100x = 68.18 M1 e.g. two decimals that when subtracted
or 10x = 6.81 and 1000x = 681.81 give a finite decimal (must show
understanding of recurring figures by ‘dot’
or at least 2 lots of 18 or 81 after the
decimal point). Algebra required, use of
any letter.
14 a 8 1 B1
b A = {10, 11, 12, 13, 14 15, 16, 17} M1 may be seen in a Venn diagram
B = {13, 14, 15, 16, 17, 18, 19, 20, 21} (allow for example 10 – 17 for A
or and 13 – 21 for B or 10 – 21 for
A∪B = {10, 11, 12, 13, 14, 15, 16, 17, A∪B)
18, 19, 20, 21} or for an answer with one missing
element or one extra element
22, 23, 24, 25 2 A1
c Aʹ = {18, 19, 20, 21, 22, 23, 24, 25} M1 may be seen in a Venn diagram
B = {13, 14, 15, 16, 17, 18, 19, 20, 21} (allow 18 – 25 for Aʹ and 13 – 21
for B)
or for an answer with one missing
element or one extra element
18, 19, 20, 21 2 A1
Total 6 marks
PMT
16 3y(2y + 1) – y2 = 8 or x −1 x −1
2 M1 correct first step eg substitution by
8 + y2 8 + y2 3x − =8 x −1
x= → − 2 y = 1 or 2 2 eg x = 1 + 2y or y = to get an
3y 3y oe 2
equation in a single variable
or
_ 3 xy − y 2 = 8
writing 2nd equation with x the
3 xy − 3 y 2 y = 3 y 1 subject and substituting into 1st
oe or
multiplying 2nd equation by 3y and
subtracting from 1st oe
eg 5y2 + 3y – 8 (= 0) eg 5x2 – 4x – 33 (= 0) A1 for a correct simplified quadratic
(5y + 8)(y – 1) (= 0) or (5x + 11)(x – 3) (= 0) or M1ft dep on M1 for solving their 3 term
2
−3 3 − 4 5 (−8) 2
4 (−4) − 4 5 (−33) quadratic equation using any
correct method (allow one sign
25 25 error and some simplification –
−3 9 + 160
allow as far as ) or if
10
factorising, allow brackets which
expanded give 2 out of 3 terms
correct)
8 11 A1 dep on first M1
y= − and y = 1 (both) x= − and x = 3 (both)
5 5
11 8 5 A1 oe dep on first M1
x= − ,y= −
5 5 Must be paired correctly
x = 3, y = 1
Total 5 marks
PMT
20 X +4 eg, where b = number eg, where r = number of M1 for making a correct start by finding
2 (= X + 4 ) or of blue counters red counters the probability of the first counter
being blue for their method
X 2X
b b −1 r+4 r +3
X +4 or or
−1 2b − 4 2b − 5 2r + 4 2r + 3
2 (= X + 2 )
X −1 2X − 2
X +4 X +2 b b −1 r +4 r +3 M1 oe correct calculation for 2 blue
eg eg eg
2X 2X − 2 2b − 4 2b − 5 2r + 4 2 r + 3 (using one variable)