Professional Documents
Culture Documents
Adobe Scan Sep 28, 2023
Adobe Scan Sep 28, 2023
1. Two visit to carry out regular overhauling during the year (Total 3 visit).
2. The service Engineer will carry out inspection, checking of machines, routine
preventive maintenance including cleaning of filters, rings, packing. changing
of oils (oils to be supplied by us) and a no-load run of the machine.
Thanking you,