Case study

Johnson Controls Headquarters


Glendale, Wisconsin

Johnson Controls global headquarters earns


LEED® platinum certification, demonstrates
triple-bottom-line excellence

Overview
A growing number of companies increasingly measure their performance using the
triple-bottom-line indicators of economic, social and environmental impact. Johnson
Controls, Inc. demonstrates these values in its products and services. The construction
and expansion of its corporate campus in Glendale, Wisconsin provides a showcase for
its efforts. The campus was awarded LEED Platinum certification in September 2010
by the U.S. Green Building Council, the highest such recognition possible. The Glendale
campus represents the largest concentration of LEED Platinum buildings – four – on one
site ever awarded.

The 33-acre complex involves 306,359 square feet of new and completely renovated
office space. Two existing buildings with a combined 160,000 square feet were renovated
for the corporate headquarters, and three new buildings were constructed: a 114,599
square-foot headquarters for its Power Solutions business; a 31,700 square-foot building
that includes a cafeteria, meeting rooms and fitness center; and a new four-level parking
structure for more than 400 vehicles including space for plug-in hybrids.
Years of green He said early planning was especially
important at this site because of
building experience the use of Building Information
Modeling (BIM), which involved
Johnson Controls is no newcomer
three-dimensional, building modeling
to green. On top of more than a
software to provide exact design
century of making buildings energy
and construction measurements that
efficient, a decade ago its Brengel
are shared by all project members.
Technology Center, in Milwaukee
Wisconsin, was one of the first LEED-
Using BIM made it a more cost-
New Construction certified buildings
effective project because it
in the world. It also was the first
helped avoid costly mistakes
building in the world to be re-certified
On the grounds, 1,452 solar photovoltaic panels that can happen in traditional
LEED-Gold for Existing Buildings.
make up one of the largest arrays in Wisconsin, construction. BIM also provides:
delivering up to 250kW of electricity to the site.
“We’ve been involved in more than
• Financial security. The system’s
100 of our customers’ LEED-certified
technical accuracy means precise
or registered projects around the
measurement and fewer change
world. We know what technologies
orders. That certainty allows for
provide the best financial investment
more automation when fabricating
while having the least impact on the
materials, which also saves money.
environment, and at the same time
It also reduces the financial
create a productive workplace for
variables on a project, as all the
employees,” said Ward Komorowski,
details are worked out early.
Johnson Controls director of
facilities and building services. •Condensed timetable. Because of
the automation, contractors can do a
“It’s important that our employees, tremendous amount of off-site work
customers and the public understand in clean, dry factory environments,
every aspect of our commitment to which reduces weather-related delays
the triple bottom line, and the new while other work is done on site.
corporate campus helps that happen.” • Project satisfaction. The 3-D
Low flow fixtures and dual-flush toilets
modeling assures that the customer
significantly reduce water use across the campus. For instance, that means incorporating
Harvested rain water is used to flush most of the gets exactly what they want
toilets on the campus.
geothermal heat pumps, photovoltaic before construction begins.
energy, under-floor heating and
cooling. Skylights and bigger windows “The team relied on the expert
increase the use of natural light information from those who would
and reduce dependence on artificial be doing the work, rather than having
illumination. Rainwater is collected one person lay out the design and
and used to flush toilets. A parking lot another person doing installation.
surfaced with permeable pavers allows Using BIM also helped us avoid or
rain and snowmelt to filter through. resolve conflicts much sooner in the
And a diverse workforce trained in process,” Komorowski explained.
sustainable construction helped put it
all together in a cost-effective way.
Technical innovation
Modeling from the start Debbie Vander Heiden, the Johnson
Controls on-site project manager,
For any green project, it’s vital said other planning technology
to get the entire project team was crucial to one innovative
on board from the beginning. environmental element of the
About 12,000 square feet of green roof absorbs “LEED encourages everyone to project: geothermal heat pumps.
precipitation, which reduces runoff, insulates be involved much sooner in the
the building, and extends the life of the roof.
process because there is so much The geothermal system relies on the
Skylights reduce the need for lighting inside
the buildings. interconnection between the constant temperature of the earth to
different environmental credits,” help heat or cool the building. Some
according to Komorowski. 272 wells were drilled to accommodate
a closed-loop system that supplies
the heat pumps in the building.
Commitment to
supplier diversity
“The heat pumps reduce winter
The project included contracts with
heating costs by about 29 percent
35 diverse businesses in an effort to
versus current natural gas boilers.
help the suppliers create green jobs,
We’re using geothermal to remove
build expertise in sustainability, and
condenser heat in summer and
develop the capacity to handle other
reduce chiller operating costs by
major green contracts. The $18.5
23 percent,” said Vander Heiden.
million in expenditures exceeded the
company’s goal of spending at least
By using global positioning system
20 percent of its budget with firms
navigation, the team could determine
that were owned, operated or con- More than 14,000 square feet of thin-film PV cells
every geothermal well site along are laminated to the roofing membrane of one
trolled by minorities or women and
with the measurements for all the building to generate electricity.
certified either by the National Minority
pipes. That meant the 180,000 feet
Supplier Development Council (NMSDC)
of piping could be manufactured to
or the Women’s Business Enterprise
precise specifications, a simpler and
National Council (WBENC).
more cost-effective process than
fabricating each one by hand.
The diverse suppliers provided products
and services such as:
Long-term • Site electrical services
energy costs key • Green landscape services
Although sometimes concerns are • Low-voltage cable installation
voiced about the upfront cost of green • Aluminum glazing
projects, the financial benefits on this
project are proof of sustainability’s • Deck installation
value. While overall campus space • Steel fabrication
doubled, the campus energy use • Liner installation and stone for
actually declined by 21 percent. pervious lots
Energy-efficient glass and skylights help capture
• Solar generation produces the “The contractors and subcontractors as much natural light as possible. This reduces
electricity needed in the new buildings on the job were trained in sustainability
dependence on artificial illumination, thereby
while reducing greenhouse gas reducing energy consumption.
practices that they can use with other
emissions by 827,000 pounds per LEED jobs. We’re creating the green
year. A 1,330 sq. ft. solar thermal collar workforce of tomorrow,”
installation on the roof annually Komorowski said.
saves 2,837 therms of energy.
The project also provided economic
• Skylights and increased window development by using locally harvested
space reduce the use of and manufactured materials for more
energy for indoor lighting. than 25 percent of project materials,
including the raised floor, concrete,
• A 30,000-gallon cistern captures steel and limestone.
rainwater from all new roof
surfaces for reuse, reducing “We’ve learned the best practices
potable water consumption for new developing green projects, making
bathroom fixtures by 77 percent best use of contractors, and managing
or 595,000 gallons per year. the process,” he said. “These are
lessons we’re sharing with our partners
• A number of on-site recycling on this project – and down the line, our
strategies are saving money and customers and many others will benefit By capturing rainwater and snowmelt in this
resources. Almost 90 percent of new from our experience.” cistern, then cleaning and reusing it, municipal
construction waste and more than water use is reduced by 77 percent.
75 percent of demolition waste from
existing buildings was recycled.
Security management Powerful Statement
Vander Heiden noted that even Johnson Controls hosted more than
the security features at the 6,000 visitors in the first 18 months that
headquarters were developed the facility was open, showcasing the
with energy savings in mind. energy efficient and sustainable building
products and services that the company
The Johnson Controls P2000 security provides to customers worldwide.
management system and Digital
Vision Network provide protection “It is easier for our own customers
throughout the headquarters campus. to see value in this approach when
It’s designed to use energy efficiently we can show how well we’re putting
A Metasys® building management system by integrating access control with it into effect so well here at home
coordinates all control activities across the lighting and HVAC systems. – and how we’re doing it cost
facilities and provides a single point of access to effectively,” Komorowski said.
the information required for optimizing efficiency, Additionally, digital closed circuit
comfort and safety.
TV cameras across the campus take “This campus is a powerful statement
advantage of advanced analytics to about how Johnson Controls is
notify facilities operators of abnormal committed to sustainability. It’s
events, plus some 150 card access and a showplace of excellent work
biometric readers provide a high level environments, energy efficiency
of protection. A Johnson Controls and facility management initiatives,”
Intelligent Fire Control system features he added. “We’re looking forward
full analog reporting from smoke to accommodating many years of
detectors, along with digital voice business and employee growth.”
evacuation functionality. Infrared camera
technology is used at the solar array The company began demolition in the
field to create an “electronic fence.” fall of 2007 and had the facility’s grand
opening in the fall of 2009. The campus
is a continuation of the Johnson Controls
Building automation legacy that began in 1885. Three global
Everything is tied together using the businesses – Automotive Experience,
Runoff water is collected through permeable Johnson Controls Metasys® building Building Efficiency and Power Solutions
paving on the parking lots and directed to a
management system to coordinate – continue to drive the company
detention pond, thereby reducing the
environmental impact on groundwater all activities across the facilities toward it mission of creating a more
and waterways. and provide a single point of access comfortable, safe and sustainable world.
to performance indicators – the
information required for optimizing
building efficiency, comfort and safety.

“The integration of the building systems


and the information technology
CR’s
infrastructure into one intelligent
network is an important part of our
strategy for sustainability,” noted
Komorowski, who leads the facilities 2011
management team. “Our Metasys
Sustainability Manager provides a
dashboard that delivers information,
including greenhouse gas emissions
estimations, to our management Johnson Controls ranked #1
Solar thermal systems supply more than 30 team who can make informed in Corporate Responsibility Magazine’s
percent of the hot water needs for two buildings. decisions that save energy and 12th annual “100 Best Corporate Citizens List”
money and help the environment.”

LEED® and the ‘LEED® Certification Mark’ are registered trademarks owned by the U.S. Green Building Council® and are used with permission.
Metasys® is a registered trademark of Johnson Controls, Inc.

©2011 Johnson Controls, Inc. Printed in USA CSST-09-103 (Rev 3/11)