Professional Documents
Culture Documents
EM 03 H and S Checklist v.3.0
EM 03 H and S Checklist v.3.0
Name PRN
Has a remote feasibility check been completed for this address? Guidance on how to complete this can be
found in the practice centre.
Address has passed remote feasibility check Address has failed remote feasibility check *
* If a property has failed the remote check then the address may not be suitable for electronic monitoring. Consider
speaking to EM Tech Support about this property and booking an onsite feasibility check through Eagle
Is the person and the occupants aware of what the boundary for the address would be?
Discuss boundary of the property with the person being sentenced and occupants of the address -
*Note: Connections via generators, wind, solar or other types of power can be approved as long as they guarantee constant
supply and provide standards compliant power outlets. Equipment requires 230V 50Hz AC 10A wall sockets per AS/NZS
3112:2000 for the wall chargers
Occupants’ names:
Prompts for elicit information - please use your professional judgement with your approach
Has the information gathered in this form been entered in the appropriate systems?
Health and Safety information entered in Eagle within 24 hours of site visit Yes
Documented as appropriate in PAC report and OMC, CEP, EM Bail Suitability Report IOMS
Yes
case notes, IOMS alerts
Signature