Subject: Proposal for 500 CMD (18 hrs) Reverse Osmosis Plant for Ohud General
Hospital
Dear Sir,
We thank you for giving us the opportunity to submit our offer on the subject requirement
in compliance with your request.
Attached is our revised technical & commercial proposal for design, engineering, supply,
delivery, installation and commissioning for the electro-mechanical equipment of the 500
m3/day based o n18 Hrs operation. Reverse Osmosis System.
Please note that our design for the 500 m3/day RO is based upon provided water analysis. If
the feed TDS found to be different, the design and price of RO shall be revised.
In case you need any further clarifications please feel free to contact the under-signed.
Yours Sincerely,
Tariq Humaidi
Sales Engineer
www.aesarabia.com info@aesarabia.com
P.O. Box 105689 - Riyadh 11656, Saudi Arabia – Tel: 966 1 4772398 – Fax: 966 1 4785456 – C.R. 1010139709 – Paid Up Capital SR 5,400,000
Corporate Office: American Engineering Services, Inc. – 9203 King Palm Drive, Suite A – Tampa, FL 33619, USA – Tel: 1 813 621 3932 – Fax: 1 813 621
4085
AES ARABIA LTD. AES REF.20054W-REV 02
PROPOSAL
FOR
FOR
PREPARED BY:
AES ARABIA LTD
P.O BOX: 105689 RIYADH: 11656
KINGDOM OF SAUDI ARABIA
TEL: 011-477 2398 FAX: 011- 478 5456
AES REF.20054W-REV.02
7 DEC 2021
2
AES ARABIA LTD. AES REF.20054W-REV 02
1. INTRODUCTION
AES Arabia Ltd is a total water and waste water management & solutions provider,
offering custom design, manufacturing, turnkey execution, project management and
O&M services to its clients. AES offers solutions through systems as well as specialty
Chemicals covering industries ranging from, municipal, commercial, industrial, Oil &
Gas / Petrochemicals as well as Power. AES regional Head Quarters and its
manufacturing facilities are located in Riyadh, Saudi Arabia. AES occupies an 18,000
m² fully equipped manufacturing & warehousing facilities in Riyadh area. This facility
is probably the largest of its kind in the Middle East region.
Being certified to the highest international standards of quality ISO 9001:2008, ASME
and NSF, AES has established high quality objectives to ensure full satisfaction of its
customers ensuring highest quality standards in its work, as well as the
implementation of the highest international design codes.
Few of our several prestigious clients in the Middle East and the rest of the world
are Saudi Aramco, ADNOC, SABIC, PDO, Sonatrach, National Oil Production Company
of Egypt (EGPC), TOTAL and many more in Oil & Gas and Petrochemical concessions;
the same goes for the EPC companies we have been working with over the past two
decades, examples of which are Tecnicas Reunidas, Bechtel, Saipem, Technip, JGC,
Samsung, SKEC, HDEC, HHI, Petrofac and several of the same status.
AES is a world renowned company with a long history of success in the design,
supply, construction, operation and maintenance of plants for municipal and
industrial applications. Residents of many cities in the Middle East enjoy millions of
gallons of fresh and potabilized water produced by AES supplied desalination
systems. Power Plants, Airports, Oil & Gas plants, Military bases and many other
industries, in numerous locations use AES water treatment systems to meet their
process needs or to treat their effluent in compliance with the ever increasing and
stringent environmental regulations.
Our exclusive specialty chemicals for all water treatment applications are
manufactured in our plant in Riyadh. The Manufacturing facility for Specialty
Chemicals consists of all the necessary equipment to ensure that highest degree of
quality is maintained during the production with precise in-process and finished
products quality control. The operating procedures and processes are designed to
ensure complete safety of operating personnel and are environment friendly.
The well-equipped Laboratory not only ensures Quality Control but also facilitates
Product Development/ Modification depending on Client/ Application requirement.
Our skilled and trained operating staff is supervised by well experienced Chemical
Engineers and Chemists.
In conclusion, we trust you will be well served in working with AES to satisfy your
Water and waste water Treatment needs, a company that has a solid proven track
record and reliability in supplying plants and providing service under the very
rigorous standards and sophistication globally. You will have the advantage to buy
equipment designed and built to the best international standards and to receive an
unequalled service provided by some of the best trained technicians in the field.
3
AES ARABIA LTD. AES REF.20054W-REV 02
2. SCOPE OF WORK
AES Arabia Ltd., Scope of Work for 500 m3/ day Reverse Osmosis Plants will cover
the following:
4
AES ARABIA LTD. AES REF.20054W-REV 02
3. TECHNICAL DATA
Notes:
* This excludes the raw water needed for backwash of the sand filter
** The treated water characteristics are based on the raw water
characteristics indicated above. Any change in raw water
characteristics would necessitate revision in design and proposal. We
shall guaranty total water TDS.
*** The RO plant is designed to produce 500 m3/day if operated 18
hrs/day.
**** Feed Tank shall be above ground and within 5 mtr of feed pumps.
5
AES ARABIA LTD. AES REF.20054W-REV 02
The client is to provide the raw water line to the inlet line of the filter feed
pumps. The media filter is provided with layers of filtering with supporting
gravel to remove any suspended solids and turbidity in the raw water. Feed
water is presumed to be free of bacteria and biological growth.
The high pressure booster pump feeds the filtered and chemically treated
raw water to the Reverse Osmosis membranes at high pressure. When raw
water at high pressure is fed to the Reverse Osmosis membrane, almost pure
water or permeates passes through the membrane while salts are retained in
the brine side. Permeate from Reverse Osmosis membrane unit is collected in
a manifold, to storage tank. Brine reject from the RO membranes is
continuously removed & disposed.
This permeate is usually acidic and corrosive. Caustic soda solution is dosed
to adjust the pH & reduce the corrosiveness of the product water. Brine
reject from the RO membranes is continuously removed & disposed.
3.5 Electrical
Power Supply
6
AES ARABIA LTD. AES REF.20054W-REV 02
4. SCOPE OF SUPPLY
AES Arabia Ltd. offers to design, supply and deliver to site, the 500 m3/day
Brackish R.O. Water Treatment system comprising of the following:
RO System
7
AES ARABIA LTD. AES REF.20054W-Rev02
5. EQUIPMENT SPECIFICATIONS
Dosing Pump
Make: Pulsatron-USA
Type: Diaphragm
Solution Tank
8
AES ARABIA LTD. AES REF.20054W-Rev02
Type: Centrifugal
Make: EBARA/DP-EU
Suction: Flooded
9
AES ARABIA LTD. AES REF.20054W-Rev02
Make: AES
10
AES ARABIA LTD. AES REF.20054W-Rev02
Make: AES
11
AES ARABIA LTD. AES REF.20054W-Rev02
Dosing Pump
Type: Diaphragm
Make: Pulsatron-USA
Solution Tank
12
AES ARABIA LTD. AES REF.20054W-Rev02
13
AES ARABIA LTD. AES REF.20054W-Rev02
Welded / Threaded
98.5% Minimum
14
AES ARABIA LTD. AES REF.20054W-Rev02
15
AES ARABIA LTD. AES REF.20054W-Rev02
5.7 Instruments
Quantity/Stream: Two (2), One (1) for permeate, One (1) for
Type: Digital
Type: Digital
16
AES ARABIA LTD. AES REF.20054W-Rev02
17
AES ARABIA LTD. AES REF.20054W-Rev02
Dosing Pump
Type: Diaphragm
Make: Pulsatron-USA
Day Tank
18
AES ARABIA LTD. AES REF.20054W-Rev02
Dosing Pump
Make: Pulsatron-USA
Type: Diaphragm
Solution Tank
19
AES ARABIA LTD. AES REF.20054W-Rev02
Enclosure: IP – 54
NOTE:
Dry Contact for BMS shall be provided as AES control Panel as per
manufacturer standard. To be interlock with BMS by Main Contractor
Appropriately sized EMT conduits and cables, AWG / THHN between AES
control panel and individual motors and controls supplied by AES and as
specified herein.
20
AES ARABIA LTD. AES REF.20054W-Rev02
Design Basis
pH 7.5~8
TDS, Max. < 200 mg/ltr
T.H (as CaCO3) < 100 mg/ltr
Turbidity < 1 NTU
Water Softener.
Diameter: 24".
Inlet/Outlet: 1 ½”
Note:
21
AES ARABIA LTD. AES REF.20054W-Rev02
6. COMMERCIAL SECTION
6.1 Price
A.E.S. Arabia Ltd. offers to supply site, install, test and commission the
500 m3/day Reverse Osmosis System as specified in section 4.0 & 5.0 for the
total price of:
SR. 538,039/-
(Saudi Riyals: Five Hundred Three Eight Thousand & Thirty Nine Only)
Note: VAT or any other related Government Tax shall be paid by buyer.
The payment will be by confirmed and irrevocable Letter of Credit with six (6)
months expiry period in favor of:
A.E.S. Arabia Ltd.
P.O. Box 105689
Riyadh 11656
Saudi Arabia
6.3 Delivery
The proposed plants will be delivered within 14-16 weeks from receipt of
order, signing of contract, settling of commercial terms and payments, and
approval of technical submittal.
6.4 Validity
22
AES ARABIA LTD. AES REF.20054W-Rev02
AES Arabia Ltd. warrants that all its equipment described in this proposal and
delivered to client will be free from any defects in materials and
workmanship and will perform as described in the proposal for a period of
one (1) year from the shipping date. Any system components that are
considered wear related items and not covered by the equipment warranty
shall be specified in the operating manual.
All changes requested by client after signing the agreement shall be subject
to review by AES Arabia Ltd. Upon AES Arabia’s acceptance of such
variations, any extra material, time, man-hour shall be charged to the client
as per AES Arabia standard charging rates. If the client chooses to cancel the
order at any stage of the contract, AES Arabia Ltd. shall deduct all cost
incurred till the cancellation point of time and any subsequent charges
foreseen as a result of order cancellation.
23
AES ARABIA LTD. AES REF.20054W-Rev02
6.8 Exclusions
The following are not included in the scope of work and supply:
24