Professional Documents
Culture Documents
Day 3 Session 1
Day 3 Session 1
Day 3 Session 1
DIGITIAL TRANSFORMATION
USING
TEAMCENTER
With 8+years of experience in various PLM & CAD tools, specially with
Teamcenter. Enriching extensive knowledge in the field of PLM,
enlightening mind in understanding am implementing the scope of
Teamcenter in Digital transformation
1
11/4/2023
Digital Transformation
2
11/4/2023
Product lifecycle
management
3
11/4/2023
A PLM
Strategy
• Change management — Bringing a product to life is a difficult task, and there will likely be many changes along the
way. Change management ensures that there is an orderly process to request, plan, implement, and evaluate the
changes to a design or process related to the product.
• Reporting and analytics — Product data storage is one of the key components of a PLM system. To best utilize the
product information stored within the platform, a PLM solution should have robust reporting capabilities.
• Quality management — These solutions offer workflows that coordinate, manage, and track cross‐departmental
product quality processes. All of this information will be stored in the PLM system, making it the single source of
truth for quality management. This means you can easily improve product quality while you reduce time‐to‐closure.
• Supplier collaboration — Getting your product to your target demographic is the end goal for anyone involved in its
creation. A PLM system may have the functionality to help you find the best supplier for your particular product. You
can approve vendors, manage their audits, and more with the help of a PLM tool.
• Product data management (PDM) — One of the key benefits of a PLM tool is that it keeps track of all your product
data, enabling the organization, management, and analysis of your information. Teams across your organization can
add their own notes about revisions and releases as well. This encourages cross‐departmental collaboration for
product design and manufacturing.
4
11/4/2023
5
11/4/2023
Teamcenter
Teamcenter is recognized by
Forrester Research as a leader
in PLM.
https://blogs.sw.siemens.com/teamcenter/20
23‐forrester‐wave‐best‐plm/
https://www.g2.com/categories/plm
https://www.selecthub.com/plm‐software
6
11/4/2023
Teamcenter architecture
• There are two different architectures you can set up for your site’s Teamcenter environment.
• Two‐tier architecture
• Four‐tier architecture
7
11/4/2023
Two‐tier architecture
logical view
Two‐tier architecture
physical view
8
11/4/2023
Four‐tier architecture
logical view
Four‐tier
architecture
physical view
9
11/4/2023
User Interface
1. Menu
2. Toolbar
3. Application banner
4. Back and Forward
5. Quick Search box
6. Navigation pane
7. Primary applications
8. Secondary applications
9. Information center
10. Clipboard button
My Teamcenter
10
11/4/2023
An item can be thought of as a package that contains all data related to that item.
Items are structures that are generally used to represent a product, part, or
component. Items can contain other data objects including other items and
folders.
11
11/4/2023
Dataset objects
Datasets are objects that manage files generated from non‐Teamcenter applications, such as, NX, Microsoft Word
and Excel, WordPad, and so forth.
12
11/4/2023
13
11/4/2023
14
11/4/2023
Projects
Projects, also called programs in some industries, are used to represent and control access to data objects
that may be accessible to multiple organizations, such as project groups, development groups, suppliers, and
customers.
Project
15
11/4/2023
Workflow
A workflow is the automation of business procedures in which documents, information, or tasks
are passed from one participant to another in a way that is governed by rules or procedures.
16
11/4/2023
Workflow consists of
• The automation of the flow of business processes to accomplish a defined objective.
• Documents, information, and tasks passing between participants during the completion of a particular
process.
• Processes that can have any number of tasks arranged in a serial or parallel progression.
• Processes that use defined tasks to automatically notify selected individuals requesting work signoff.
Workflow process
Workflow processes are created based on a process template, which functions as a blueprint of
the workflow process. A specific process is defined by placing workflow and/or change
management tasks in the order they should be performed. Process templates are created using
Workflow Designer.
1. Check in data you want to submit to the workflow. Note Not all workflow definitions require data to be checked in.
2. Initiate the workflow process.
3. Select a signoff team.
4. Perform the reviews and signoffs to complete the workflow.
17
11/4/2023
Workflow
Product structure
In Structure Manager, you can create, view, and modify a product structure, sometimes called
a bill of materials (BOM).
An indented view of the assemblies and piece parts that comprise the product structure
illustrates the relationship between the assemblies and piece
18
11/4/2023
Product structure
Structure
Manager
19
11/4/2023
Variant
Variant
20
11/4/2023
Variant
Precise Vs Imprecise
Precise assembly structures are fixed structures of items
configured with specific item revisions.
21
11/4/2023
Teamcenter Manufacturing
‐ eBOM and mBOM
configuration management
Teamcenter ‐ CAE
Integration Overview
22
11/4/2023
Benefits
• Tightly integrate globally‐dispersed, • Reduce manual preparation time • Eliminate multiple, redundant BOM • Harness enterprise
multiple design teams by 25‐50 percent systems to ensure real‐time knowledge to make
accuracy and completeness for all better decisions to
• Improve engineering productivity by
eliminating time‐consuming searches for • Increase production volume by stakeholders select and manage
information and easier design re‐use 50 percent future programs
• Reduce development costs through
• Enable innovation with easier evaluation of • Increase quality and accuracy of enhanced re‐use, improved BOM • Establish a baseline
alternate designs documentation accuracy, and reduced cycle times for continuous
improvement efforts
• Reduced development time and cost • Use PLM functions within familiar • Increase business opportunities by
enabled by working in a multi‐CAD streamlining development of more • Drive innovation by
environment and elimination of CAD Microsoft Office applications prioritizing resources
product configuration offerings
translation cost and investments
• Utilize structured SGML/XML without a corresponding increase in
• Accelerated design review due to real‐time content documentation workload • Streamline creation
change updates and revision of
• Easily publish multiple versions of • Provide analysis capabilities to key budgets and forecasts
• Cut development time 30‐70 percent documentation stakeholders to ensure accuracy
• Reduce engineering changes 65‐90 percent • Align corporate
• Streamline management of • Reduce errors and rework by uniting strategy with
• Speed time‐to‐market 20‐90 percent design and delivery program and project
graphic content
• Coordinate essential BOM
execution
• Increase quality 200‐600 percent • Link documentation components
to product content, graphics, and
information with other key business • Streamline the entire
• Increase engineering productivity 20‐110 processes efficiently product lifecycle
percent translations
Source: https://www.geoplm.com/
Integrate
Collaborate
Simplify
Scale‐UP
23